PETITION NO. 1000  - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission remediation activities pursuant to the North American Electric Reliability Corporation (NERC) facility ratings recommendation to industry. Staff Report.  Approved 08/11/11.

PETITION NO. 1001 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing equipment compound located at 219 New Park Avenue a/k/a 219 New Park Road, Hartford, Connecticut.   Staff Report. Approved 08/25/11.  

PETITION NO. 1002 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell located at 2040 Dixwell Avenue, Hamden, Connecticut. Staff Report.Status Update Approved 09/08/11.

PETITION NO. 1003 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power substation located on South Main Street (Route 25), Newtown, Connecticut.  Staff Report. Approved 09/22/11.

PETITION NO. 1004 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing equipment compound located at 60 South Main Street, East Granby, Connecticut.    Staff Report. Approved 09/22/11.

PETITION NO. 1005 - New Britain Renewable Energy, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 1.4 MW Fuel Cell combined heat and power generating facility located at Central Connecticut State University, New Britain, Connecticut. Staff Report.Completion Letter  Approved 09/22/11.  

PETITION NO. 1006 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing guyed lattice tower located at 181 Garden Hill Circle, Waterbury, Connecticut.   Staff Report. Approved 10/06/11.

PETITION NO. 1007 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of existing double circuit 345-kV transmission lines in Waterford, Connecticut.   Staff Report. Approved 10/06/11.

PETITION NO. 1008 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell located at UCONN Center for Clean Energy Engineering, 44 Weaver Road, Storrs, Connecticut.    Staff Report.  Approved 11/03/11.

PETITION NO. 1009- The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 85-foot steel pole and associated radio communications equipment located at Rapids Road, Stamford, Connecticut.    Staff Report. Approved 12/15/11.

PETITION NO. 1010 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an concealed tower on a water tank and associated equipment at a water treatment water plant located at 455 Valley Road, Greenwich, Connecticut. Record. Findings of Fact. Opinion. Decision and Order Approved 03/29/12. Not Constructed.

PETITION NO. 1011 - MetroPCS New York, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of antennas to an existing CL&P structure located at 750 Chapel Road, Stratford, Connecticut. Staff Report. Approved 11/17/11.

PETITION NO. 1012 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing telecommunications facility located at 75 Wells Road, Wethersfield, Connecticut.  Staff Report.  Approved 12/01/11.

PETITION NO. 1013 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 8300 Line reconfiguration in New Haven, Connecticut.    Staff Report. Approved 12/01/11.

PETITION NO. 1014 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at Eastern CT State University, 83 Windham Street, Willimantic, Connecticut.    Staff Report. Status Update Approved 12/15/11.

PETITION NO. 1015 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at New Haven City Hall, 200 Orange Street, New Haven, Connecticut.     Staff Report. Status Update Approved 12/15/11.
 

PETITION NO. 1016 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at St. Francis Hospital, 114 Woodland Street, Hartford, Connecticut.    Staff Report. Status UpdateApproved 01/05/12.

PETITION NO. 1017 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at Mount Sinai Hospital, 500 Blue Hills Avenue, Hartford, Connecticut.  Staff Report.Status UpdateApproved 01/05/12.

PETITION NO. 1018 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the East Shore Substation located at 1 Waterfront Street, New Haven, Connecticut.    Staff Report. Approved 01/05/12.

PETITION NO. 1019 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation on an existing smokestack and associated ground equipment located at 1-3 Oakland Avenue, East Hartford, Connecticut.   Staff Report. Approved 01/05/12.

PETITION NO. 1020 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 12 Burr Road, Bloomfield, Connecticut.      Staff Report.Approved 01/19/12.

PETITION NO. 1021 - American Tower Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace and expand an existing telecommunications facility located at 10 Tanner Marsh Road, Guilford, Connecticut.    Staff Report.Approved 02/16/12.

PETITION NO. 1022 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a wireless telecommunications facility on an existing Connecticut Light and Power transmission structure located at 227 Whitewood Road, Waterbury, Connecticut.  Withdrawn 04/09/12.
 

PETITION NO. 1023 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at CT Transit Bus Maintenance Facility, 100 Leibert Road, Hartford, Connecticut.     Staff Report.Status UpdateApproved 02/16/12. 

PETITION NO. 1024 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Pequonnock Substation located at 10 Henry Street, Bridgeport, Connecticut.Staff Report. Approved 03/29/12.
 
PETITION NO. 1025 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Shepaug Substation located at 2225 River Road, Southbury, Connecticut. Staff Report Approved 03/29/12.

PETITION NO. 1026 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing telecommunications tower located at 400 Sheldon Street, Hartford, Connecticut.Staff Report Approved 03/29/12

PETITION NO. 1027 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing tower located at 330 Porkony Road, Haddam, Connecticut.Staff Report. Approved 05/10/12.

PETITION NO. 1028 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Substation located at 81 Riverside Drive, East Hartford, Connecticut. Staff Report. Approved 06/21/12

PETITION NO. 1029 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P switching station located at 108 Carpenter Lane, Wallingford, Connecticut.Decision Letter and Staff Report Approved 08/09/12

PETITION NO. 1030 – UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell to be located at Western Connecticut State University, 181 White Street, Danbury, Connecticut. Staff Report. Status Update Approved 08/09/12.

PETITION NO. 1031 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the North Haven Substation located at 485 Washington Avenue, North Haven, Connecticut. Staff Report Approved 07/26/12.

PETITION NO. 1032 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to CL&P’s existing Norwalk Substation located at 50 New Canaan Avenue, Norwalk, Connecticut. Staff Report. Approved 08/09/12.

PETITION NO. 1033 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of a 115-kV transmission line steel lattice structure located at Washington Boulevard and Station Place, Stamford, Connecticut. Staff Report.  Approved 09/06/12.

PETITION NO. 1034 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing 115-kV transmission line in Ledyard, Connecticut. Staff Report. Approved 09/06/12.
 
PETITION NO. 1035 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to CL&P’s existing Montville Substation located at 81 Lathrop Road, Montville, Connecticut. Staff Report. Updated Staff Report Approved 09/06/12. 

 

PETITION NO. 1036 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for an eleven foot extension of an existing telecommunications facility located a 39 Maennerchor Avenue, Norwich, Connecticut. Staff Report. Approved 10/04/12.
 
PETITION NO. 1037 – The Connecticut Light and Power Company Petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing self-supporting lattice tower located at 315 Belleview Avenue, Southington, Connecticut. Staff Report.  Approved 10/04/12.
 
PETITION NO. 1038 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation on an existing lattice tower located at 22 Wintonbury Road (a/k/a 91 Mountain Road), Simsbury, Connecticut. Staff Report. Approved 12/13/12.

PETITION NO. 1039 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation and 10-foot increase in height on an existing roof guy tower located at 14-20 Isham Road, West Hartford, Connecticut. Staff Report Approved 11/15/12.

PETITION NO. 1040 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the  South Meadow Substation located at Reserve Road, Hartford, Connecticut. Staff Report Approved 11/15/12.
 
PETITION NO. 1041HW - Clean Harbors of Connecticut, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for the ten-day hazardous waste transfer facility operations consistent with its renewal of the RCRA Part B permit located at 51 Broderick Road, Bristol, Connecticut.    Staff Report. Approved 11/29/12.

PETITION NO. 1042 - Somers Solar Center, LLC Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction and operation of a 5.0 MW AC Solar Photovoltaic Project located at 458 & 488 South Road, Somers, Connecticut. (Record)  (Findings of Fact)  (Opinion)  (Decision and Order)  (Correction to Decision and Order) Approved 03/21/13.

PETITION NO. 1043 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a wireless telecommunications facility on an existing Connecticut Light and Power Company-owned transmission structure located at 525 Overland Drive, Orange, Connecticut.Staff Report. Approved 12/27/12.

PETITION NO. 1044 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a wireless telecommunications facility on an existing Connecticut Light and Power Company transmission structure located at 250 Olcott Street, Manchester, Connecticut. Staff Report. Approved 01/10/13.

PETITION NO. 1045 – BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 250 kW Fuel Cell to be located at Sam’s Club, 3465 Berlin Turnpike, Newington, Connecticut. Staff Report. Status Update - Not Constructed Approved 01/10/13.

PETITION NO. 1046 – BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 500 kW Fuel Cell to be located at Walmart, 155 Waterford Parkway North, Waterford, Connecticut. Staff Report. Status Update -Constructed Approved 01/10/13.  

PETITION NO. 1047 -  BE 2012 A LLC  2012 ESA Project Company, LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 600 kW Fuel Cell to be located at AT&T, 751 Higgins Road, Cheshire, Connecticut. Staff Report. Status Update - Constructed Approved 01/24/13.

PETITION NO. 1048 - BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 250 kW Fuel Cell to be located at Sam’s Club, 69 Pavilions Drive, Manchester, Connecticut. Staff Report. Status Update - Superseded PE1208Withdrawal Letter Approved 01/10/13.

PETITION NO. 1049 - BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 250 kW Fuel Cell to be located at Walmart, 495 Flatbush Avenue, Hartford, Connecticut. Staff Report. Status Update - Not Constructed Approved 01/10/13.

PETITION NO. 1050BE 2012 A LLC- 2012 ESA Project Company, LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 700 kW Fuel Cell to be located at AT&T, 522 Fairfield Avenue, Bridgeport, Connecticut. Staff Report. Status Update - Constructed Approved 01/24/13.

PETITION NO. 1051 - BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell to be located at Walmart, 315 Foxon Boulevard, New Haven, Connecticut. Staff Report. Status Update - Constructed Approved 01/10/13.

PETITION NO. 1052 - BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 200 kW Fuel Cell to be located at Walmart, 3164 Berlin Turnpike, Newington, Connecticut. Staff Report.  Status Update - Not Constructed  Approved 01/10/13.

PETITION NO. 1053 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the removal of an existing 30-foot wood pole and replace it with a new 84-foot steel monopole and associated radio communications equipment located at 163 Lakeview Avenue, New Canaan, Connecticut. Staff Report.  Approved 01/24/13.

PETITION NO. 1054 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an 84-foot steel pole and associated radio communications equipment located at CL&P’s substation on Prospect Street, Ridgefield, Connecticut. Staff Report. Approved 01/10/13.

PETITION NO. 1055 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications facility at an existing 300-foot guyed tower located at 855 University Drive (UCONN), Torrington, Connecticut. Staff Report.  Approved 01/24/13.

PETITION NO. 1056 - GRE 314 East Lyme, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 5.0 MW Solar Photovoltaic Renewable Energy Generating Project located on Grassy Hill Road and Walnut Hill Road, East Lyme, Connecticut. (Record)  (Findings of Fact)  (Opinion)  (Decison and Order)  (Decison Package) Approved 5/16/13.

PETITION NO. 1057 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Northeast Simsbury Substation and replacement of structures in Simsbury and Bloomfield; and re-conductoring of a 115-kV transmission line from Northeast Simsbury Substation (Simsbury, Connecticut) to the North Bloomfield Substation, Bloomfield, Connecticut. Staff Report.  Approved 02/07/13.

PETITION NO. 1058 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 1990 line structure replacement project consisting of modifications of two sections of an existing 115-kV transmission line from Stevenson Substation to Frost Bridge Substation and from Baldwin Junction to Baldwin Substation traversing the municipalities of Monroe, Oxford, Middlebury, Waterbury and Watertown, Connecticut. Staff Report. Final ReportD&M Change - LightingD&M Change-Lighting Decision  Request to Modify Landscaping Plan  Council Decision on Request for Modification Approved 6/13/13

PETITION NO. 1059HW – Tradebe Treatment and Recycling Northeast, LLC petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for the proposed changes consistent with its renewal of the RCRA Part B permit  to the existing hazardous waste facility located at 136 Gracey Avenue, Meriden, Connecticut.  Staff Report.  Approved 5/16/13.

PETITION NO. 1060 – Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 600 kW Fuel Cell to be located at the Macy’s Distribution Center, 475 Knotter Drive, Cheshire, Connecticut. Staff Report. Approved 5/16/13.

PETITION NO. 1061 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of one monopole double-circuit 115-kV transmission line structure with two monopole single-circuit 115-kV transmission line structures near Washington Boulevard and Station Place, Stamford, Connecticut.  Staff Report.Semi-Annual Status of Construction Report, 12/23/16Semi-Annual Status of Construction Report, 07/03/2017    Semi-annual Status of Construction Report, 12/21/17Semi-Annual Status of Construction Report, 06/26/18    Semi-Annual Status of Construction Report, 12/20/18Request Amendment 3/26/19 Council Decision on Amendment 3/29/19Semi-Annual Status of Construction Report, 6/18/19 Approved 5/30/13.

PETITION NO. 1062 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility on Price Avenue, Norwalk, Connecticut. Staff Report. Approved 5/30/13.

PETITION NO. 1063 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a telecommunications facility at an existing Connecticut Light and Power Company transmission structure located at 298 Ridge Road, Orange, Connecticut. Staff Report. Approved 6/27/13.

PETITION NO. 1064 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to CL&P’s Falls Village Substation located at Route 126, Canaan, Connecticut. Staff Report. Approved 6/13/13.

PETITION NO. 1065 - Crown Atlantic Company LLC petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for the proposed relocation of the driveway at an existing telecommunications tower located at 49 Wig Hill Road, Chester, Connecticut.     Staff Report.  Approved 6/27/13.

PETITION NO. 1066 - CTI Towers Assets I, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and extension of an existing telecommunications tower located at 10 Tanner Marsh Road, Guilford, Connecticut. Staff Report Approved  7/11/13 Contact Information

PETITION NO. 1067 - The Hartford Steam Company petition for declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 1.4 MW Fuel Cell combined heat and power cogeneration facility at Hartford Hospital located at 19 Jefferson Street, Hartford, Connecticut. Staff Report. Approved 7/25/13Gas Pipe Cleaning Procedures dated 2/11/14.Construction Complete/Operating.

PETITION NO. 1068 - BE 2012 A LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 400 kW Fuel Cell to be located at AT&T, 26 Washington Street, New London, Connecticut. Record Staff Report Status Update - Constructed Approved 10/31/13.

PETITION NO. 1069 - BE 2012 A LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 300 kW Fuel Cell to be located at AT&T, 84 Deerfield Lane, Meriden, Connecticut.   Staff Report.  Status Update - Constructed Approved 7/25/13.

PETITION NO. 1070 - BE 2012 A LLC2013B ESA Project Company, LLC - Frontier Communicationsdeclaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 400 kW Fuel Cell to be located at AT&T, 348 Grand Street, Waterbury, Connecticut. Staff Report.  Status Update - Constructed Approved 7/25/13.

PETITION NO. 1071 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of four (4) 2.49 MW electric generators and associated equipment located at 4 Matlack Road, Norwich, Connecticut.  Staff Report.  Approved 08/08/13.  

 
PETITION NO. 1072 - Algonquin Gas Transmission, LLC Petition for a Declaratory Ruling Regarding the Jurisdiction of the Connecticut Siting Council over the construction or replacement of natural gas pipeline facilities in the towns of Danbury, Cromwell/Rocky Hill, Lebanon/Franklin/Norwich and Montville, Connecticut; modifications to compressor stations in the towns of Oxford, Cromwell and Chaplin Connecticut; modifications to metering stations in the towns of Berlin, Danbury, Farmington, Glastonbury, Guilford, Middletown, Montville, North Haven, Norwich, Plainville, Pomfret, Putnam, Southbury, Vernon and Windham, Connecticut; and for recommendations regarding siting, environmental mitigation measures, and construction procedures to the Federal Energy Regulatory Commission.  Decision Letter and Staff Report  Decision: 10/31/13.

PETITION NO. 1073 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required  for all transmission remediation  activities pursuant to the North American Electric Reliability Corporation (NERC) facility ratings recommendation to industry. Staff Report. Completion Letter. Approved 08/22/13.

PETITION NO. 1074 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the collocation of a telecommunications facility on an approved tower site located at 208 Valley Road, New Canaan, Connecticut. Staff Report. Approved 08/22/13.

PETITION NO. 1075 - Crown Atlantic Company LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed relocation of the driveway at an existing telecommunications tower located at 1684 Chamberlain Highway, Berlin, Connecticut.  Staff Report. Approved 12/12/13.

PETITION NO. 1076 - ClearEdge Power Corporation Doosan Fuel Cell America, Inc. declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at CT Transit Bus Maintenance Facility, 2061 State Street, Hamden, Connecticut. Staff Report. Status Update Approved 01/23/14.

PETITION NO. 1077 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility at the Simsbury Volunteer Fire Department located at 345 Bushy Hill Road, Simsbury, Connecticut. Staff Report. Approved 12/12/13.

PETITION NO. 1078  - South Energy Investments, LLC  Town of South WindsorCTS Energy, LLC petition   declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a  for 4.98 5 megawatt fuel cell facility located at 515 John Fitch Boulevard 245 Chapel Road , South Windsor, Connecticut.  Decision Letter Staff Report. Request for Modification. Certification of Mailing. Request for Extension. Amendment Interrogatories Responses to Amendment Interrogatories Council Amendment Decision and Staff Report Minor Project Change Request and Council Decision Transfer of Ownership Request for Extension Construction with Council Decision Request for Extension and Council Approval  Council Status Update Letter Approved 12/12/13.

PETITION NO. 1079 - Dominion Energy Nuclear Connecticut, Inc. Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an equipment storage building at the Millstone Power Station in Waterford, Connecticut. Staff Report. Approved 12/12/13. Name Change 07/31/17

PETITION NO. 1080 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P switching station located at 181 Cove Road, Haddam, Connecticut.   Staff Report. Approved 01/23/14.

PETITION NO. 1081 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 75 North Frontage Road, East Haven, Connecticut. Staff Report. Status Update - Constructed Approved 01/23/14.

PETITION NO. 1082 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 541 Kings Highway Cut-Off, Fairfield, Connecticut. Staff Report. Status Update - Constructed Approved 01/23/14.

PETITION NO. 1083 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 136 Elm Street, Enfield, Connecticut.     Staff Report. Revised Staff Report. Status Update - Constructed Approved 12/12/13.  Revised Approval 10/16/14.

PETITION NO. 1084 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 55 Granby Street, Bloomfield, Connecticut. Staff Report. Status Update - Constructed Approved 12/12/13.

PETITION NO. 1085 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 117 Main Street, Derby, Connecticut. Staff Report. Status Update - Constructed Approved  01/23/14.

PETITION NO. 1086 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 656 Reservoir Avenue, Bridgeport, Connecticut.    Staff Report. Status Update - Constructed Approved 01/23/14.

PETITION NO. 1087 - Wal-Mart Stores, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 250 kW Fuel Cell to be located at the Wal-Mart store, 625 School Street, Putnam, Connecticut. Staff Report. Status Update - Constructed Approved 01/23/14.  Transfer of Site Ownership and Control and Council Acknowledgement

PETITION NO. 1088 - Wal-Mart Stores, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 250 kW Fuel Cell to be located at the Wal-Mart store, 161 Berlin Road, Cromwell, Connecticut. Staff Report. Status Update - Constructed Approved 12/12/13.  Transfer of Site Ownership and Control and Council Acknowledgement

PETITION NO. 1089 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 50 Devine Street, North Haven, Connecticut. Staff Report. Approved 01/23/14.

PETITION NO. 1090 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 750 kW Fuel Cell to be located at the Danbury Fair Mall, 7 Backus Avenue, Danbury, Connecticut.    Staff Report. Status Update - Constructed Approved 01/23/14.

PETITION NO. 1090A - Bloom Energy Corporation request to amend its declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Phase II construction, maintenance and operation of a second customer-side 250-kilowatt fuel cell facility and associated equipment to be located at the Danbury Fair Mall, 7 Backus Avenue, Danbury, Connecticut. Approved 01/30/2020

PETITION NO. 1091 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 80 Buckland Hills Drive, Manchester, Connecticut. Staff Report .Status Update - Constructed Approved 01/23/14.
 
PETITION NO. 1092 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 134R Creamery Road, Durham, Connecticut. Staff Report. Approved 03/06/14.

PETITION NO. 1093 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 400 kW Fuel Cell to be located at Comcast, 222 New Park Drive, Berlin, Connecticut. Staff Report. Status Update - Constructed Approved 02/20/14.

PETITION NO. 1094 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed upgrades to the Elmwest Substation located at 335 Elm Street, West Haven, Connecticut.  Staff Report. Completion Letter Approved 04/03/14.

PETITION NO. 1095 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a telecommunications facility on the Hebron Fairgrounds parcel located at 347 Gilead Street, Hebron, Connecticut. Staff Report. Approved 05/01/14.

PETITION NO. 1096 - Cingular New Wireless PCS, LLC petition for a declaratory ruling that no amended Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop wireless telecommunications facility on an existing building located at 1270 North High Street, East Haven, Connecticut. Decision Approved 04/15/14. Link to Petition No. 1379

PETITION NO. 1097 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that an amended Certificate of Environmental Compatibility and Public Need is not required to co-locate on and extend an existing wireless telecommunications facility located at 174 South Grand Street, Suffield, Connecticut. Staff Report. Revised Staff Report. Approved 05/15/14.

PETITION NO. 1097A - New Cingular Wireless PCS, LLC request to amend its declaratory ruling pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to an existing wireless telecommunications facility located at 174 South Grand Street, Suffield, Connecticut. Approved 5/6/21

PETITION NO. 1098 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed upgrades to the Sackett Substation located at 453 State Street, North Haven, Connecticut. Staff Report. Completion Letter Approved 05/15/14.

PETITION NO. 1099 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing silo with a telecommunications facility designed as a silo located at 743 Murdock Avenue, Meriden, Connecticut.       Filing. Staff Report. Approved 06/12/14.

PETITION NO. 1100 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 23 Stonybrook Road, Stratford, Connecticut. Filing. Staff Report. Approved 07/07/14.

PETITION NO. 1101 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a stealth rooftop telecommunications tower on the roof of the existing building located at 79 Park Avenue, Danbury, Connecticut. Record. Findings of Fact. Opinion. Decision and Order. Approved 10/02/14. DECISION EXPIRED

PETITION NO. 1102 - Cellco Partnership d/b/a Verizon Wireless and New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a temporary ballast tower and associated equipment on property located at the American School for the Deaf, 139 North Main Street, West Hartford, Connecticut. Filing Staff Report Completion Letter 09/29/15 Approved 05/29/14.

PETITION NO. 1103 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a telecommunications facility at an existing Connecticut Light and Power Company transmission structure located at 227 Whitewood Road, Waterbury, Connecticut. Filing Staff Report. Status Update. Request Minor Modification CSC Decision on Request for Minor Modification Status Update Status Update - On-Air by 12/31/19 Approved 06/12/14.

PETITION NO. 1104 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 2.2 MW AC solar photovoltaic facility and a 2.8 MW AC Fuel Cell facility on approximately 22 acres of the former Seaside Landfill located at 350 Waldemere Avenue, Bridgeport, Connecticut. Record Findings of Fact Opinion Dissenting Opinion Decision and Order. Approved 11/13/14.

PETITION NO. 1105 - PSEG Power Connecticut LLC petition for declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the Bridgeport Harbor Unit No. 3 Dry Sorbent Injection Project located at 1 Atlantic Street, Bridgeport, Connecticut.    Filing. Staff Report.  Approved 07/07/14. Notification of Retirement 10/29/21   Council Acknowledgement of Retirement  Transfer of Ownership of Surrendered Declaratory Ruling

PETITION NO. 1106 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a rooftop telecommunications tower on an existing commercial building located at 168 Center Street, Southington, Connecticut.          Filing. Staff Report. Approved 10/16/14.Revision Request. Revision Decision LetterStatus Update. Completion

PETITION NO. 1107 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a rooftop telecommunications tower located at 58 Robinson Boulevard, Orange, Connecticut. Filing. Staff Report. Approved 07/07/14

PETITION NO. 1108 – American Tower Corporation and New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the expansion of an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Filing. Decision Letter and Staff Report Request for Modification Modification Request Decision Letter Status Extension Request Council Extension Request Approval  Request for Minor Modification  CSC Decision on Modification Request Noncompliance Letter Response to Non-Compliance/Completion Letter Approved 08/21/14.

PETITION NO. 1109 - UB Fuel Cell, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction and operation of a 1.4 MW Fuel Cell facility to be located at the University of Bridgeport located at 446 University Avenue, Bridgeport, Connecticut. Filing. Staff Report. Status Update Letter and Acknowledgement Approved 08/21/14.

PETITION NO. 1110 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Milford 115-kV transmission line upgrade project consisting of the northern and southern sections of 115-kV lines. Record Filing Staff Report. Approved 08/21/14.

PETITION NO. 1111 - Murdock Avenue Neighborhood Association Petition for a declaratory ruling to reconsider the Connecticut Siting Council’s ruling on Petition No. 1099 submitted by New Cingular Wireless PCS, LLC that a Certificate of Environmental Compatibility and Public Need is not required to replace an existing silo with a telecommunications facility designed as a silo located at 743 Murdock Avenue, Meriden, Connecticut. WITHDRAWN

PETITION NO. 1112 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and extension of an existing telecommunications facility located off of St. Andrews Road, Bloomfield, Connecticut. Filing. Staff Report. D&M Revision Approval Second D&M Revision Approval Compliance Monitoring Report. Completion Letter Compliance Monitoring Report 12/09/16 Compliance Monitoring Report 08/31/17 Approved 09/04/14.

PETITION NO. 1113 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation and maintenance of a 2.8 MW AC fuel cell facility to be located at an approximately .25 acre UI Tax Parcel (Map 67, Block 951, Lot 13) adjacent to Connecticut Avenue, Interstate 95 and Alabama Street in New Haven, Connecticut. Filing - Part 1. Filing - Part 2. Staff Report. Approved 09/04/14.

PETITION NO. 1114 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed extension of an existing telecommunications facility located at 201 Granite Road, Guilford, Connecticut. Filing. Staff Report. Completion Letter Approved 10/02/14.

PETITION NO. 1115 – Bloom Energy Corporation, as agent for International Business Machines Corporation (IBM), petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 1-megawatt Fuel Cell to be located at the IBM facility, 150 Kettletown Road, Southbury, Connecticut. Filing. Staff Report. Status Update - Constructed Approved 10/02/14.

PETITION NO. 1116 – The Connecticut Light and Power Company (“CL&P”) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to CL&P’s existing Canal Substation located at 168 Canal Street, Southington, Connecticut.   Filing. Staff Report. Semi-Annual Status of Construction Report, 12/23/16 Semi-Annual Status of Construction Report, 07/03/2017 Approved 09/18/14.

PETITION NO. 1117 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a small cell telecommunications facility on the approximately 30-acre Durham Fairgrounds parcel located at 24 Townhouse Road, Durham, Connecticut.  Filing. Staff Report. Completion Letter Approved 10/16/14.

PETITION NO. 1118  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop telecommunications facility on an existing building located at 1 Selleck Street, Norwalk, Connecticut. WITHDRAWN

PETITION NO. 1119 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of three pole-mounted small cell telecommunications facilities on the Woodstock Fairgrounds property located at 281 Route 169, Woodstock, Connecticut.  Filing. Staff Report. Completion Letter Modification Request Modification Decision. Approved 12/11/14.

PETITION NO. 1120 - The United Illuminating Company  petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Hawthorne Substation located at 180 Hawthorne Drive, Fairfield, Connecticut. Record Findings of Fact Opinion Decision and Order Approved 06/25/15

PETITION NO. 1121 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of and modifications to an existing telecommunications facility located at 353 Pumpkin Hill Road, Ashford, Connecticut. Filing. Staff Report. Decision Condition Satisfied Minor Modification Request. Decision on Modification Final Summary Report. Interim Summary Report. Completion Letter Wetland Mitigation Final Summary Report Approved 01/08/15.

PETITION NO. 1122 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on an existing Connecticut Light and Power Company transmission structure located at 200 Edgemark Acres, Meriden, Connecticut. Filing. Staff Report. Status Update. Request for Minor Modification  CSC Decision on Minor Modification  Request for Extension and CSC Decision on Extension and Acknowledgement of Clarification Request for Minor Modification CSC Minor Modification & Extension Approval  Request for Extension and CSC Approval Approved 01/08/15.

PETITION NO. 1123 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop telecommunications facility on an existing building located at 489 Sullivan Avenue, South Windsor, Connecticut.   Filing. Staff Report. Completion Letter Approved 01/08/15.

PETITION NO. 1124 – T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 191 Middle Haddam Road, Portland, Connecticut. Filing. Staff Report. Completion Letter Approved 01/08/15.

PETITION NO. 1125 – T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility at an existing Connecticut Light and Power Company transmission structure located off of Rood Road, Windsor, Connecticut. Filing.  Staff Report.  Completion Letter Approved 01/22/15.

PETITION NO. 1126 – T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility at an existing Connecticut Light and Power Company transmission structure located at 4280 Whitney Avenue, Hamden, Connecticut. Filing. Staff Report. Completion Letter Approved 01/22/15.

PETITION NO. 1127 – Cellco Partnership D/B/A Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell stub tower on the roof of an existing office and activities building located at The Aces High RV Park and Campground located at 301 Chesterfield Road, East Lyme, Connecticut. FilingStaff Report Completion Letter Approved 01/22/15.

PETITION NO. 1128 - Cellco Partnership D/B/A Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing mixed use building located at 790 Main Street, Willimantic (Windham), Connecticut. Filing. Staff Report. Completion Letter Approved 01/22/15.

PETITION NO. 1129 - T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 100 Berlin Road (aka Christian Hill Road), Cromwell, Connecticut. Filing. Staff Report. Completion Letter. Approved 01/22/15.

PETITION NO. 1130 - Department of Emergency Services and Public Protection petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing telecommunications facility located at 194 Mount Parnassus Road, East Haddam, Connecticut.    Filing. Staff Report. Final Structural Design Drawings for Foundation. Final Drawings for Tower. Completion Notice. Approved 02/19/15.   

PETITION NO. 1131 - Cellco Partnership D/B/A Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a new back-up power generator and associated equipment at an existing telecommunications facility located at 80 Lonetown Road, Redding, Connecticut.  Filing. Staff Report. Completion Letter Approved 02/19/15.

PETITION NO. 1132 - Cellco Partnership D/B/A Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the Killingly Town Hall building located at 172 Main Street, Killingly, Connecticut.  Filing. Staff Report. Completion Letter Approved 02/19/15.

PETITION NO. 1133 -  Connecticut Siting Council petition for a declaratory ruling pursuant to Conn. Gen. Stat. §4-176 that Conn. Gen. Stat. §16-50k does not apply to Eligible Facilities Requests for existing telecommunications facilities submitted under the Federal Communications Commission (FCC) rules adopted pursuant to the October 21, 2014 FCC Wireless Infrastructure Report and Order.  Comments from CTIA Comments from Verizon Comments from T-Mobile Comments from AT&T Decision Memorandum and Filing Instructions Approved 03/05/15.  

PETITION NO. 1134 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on an existing Connecticut Light and Power Company transmission structure located off of Rivergate Drive, Wilton, Connecticut.   Decision Letter and Staff Report Status Update. Approved 03/05/15.

PETITION NO. 1134A New Cingular Wireless PCS, LLC request to amend its declaratory ruling pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility on an existing Eversource-owned electric transmission line structure (#935) within an existing Eversource-owned electric transmission line right-of-way located off of Rivergate Drive, Wilton, Connecticut. Approved 04/08/21

PETITION NO. 1135 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and expansion of an existing light pole for the installation of telecommunications antennas and associated equipment at Penders Field, Longbrook Park, located at Glendale Road, Stratford, Connecticut. Date for Decision Withdrawal Letter and CSC Acknowledgement Withdrawn 06/11/15

PETITION NO. 1136 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Econo Lodge Motel building located at 1843 Meriden-Waterbury Turnpike, Southington, Connecticut.  Decision Letter and Staff Report Completion LetterApproved 03/05/15.

PETITION NO. 1137 – Windham Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of five 1.0 MW and one 1.1 MW Solar Photovoltaic Renewable Energy Generating facilities located at 1 Williams Crossing Road, Lebanon, Connecticut.  Approved 03/05/15.

PETITION NO. 1138 – The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and relocation of the existing 115-kV transmission lines crossing the Housatonic River located in Stratford and Milford, Connecticut and related switching station improvements.  Motion in Protective Order  Council's Decision on Motion for Protective Order  Notice of Correction   Council's Decision and Staff Report   Extension Request and CSC Approval Letter of Completion Approved 04/02/15.

PETITION NO. 1139 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing building located at 3 Arnoldale Road, West Hartford, Connecticut.   Updated Abutters List. Decision Letter and Staff Report Completion Letter Approved 04/02/15.

PETITION NO. 1140  Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconductoring of a portion of an existing 115-kV transmission line extending from Barbour Hill Substation in South Windsor to Manchester Substation in Manchester, Connecticut and modifications to Barbour Hill Substation and Manchester Substation. Approved 04/16/15.

PETITION NO. 1141 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing office building located at 200 Executive Boulevard, Southington, Connecticut.  Decision Letter and Staff Report Completion Letter Approved 04/02/15.

PETITION NO. 1142 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 2 Ocean Avenue, West Haven, Connecticut.  .Decision Letter and Staff Report  Remote Radio Head Change 07/10/15  Completion Letter Approved 04/02/15.

PETITION NO. 1143 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Harvest Bakery building located at 84 Farmington Avenue, Bristol, Connecticut.  Decision Letter and Staff Report Completion Letter  Approved 04/02/15.

PETITION NO. 1144 – 2014 ESA Project Company LLC Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 104 Danbury Road, New Milford, Connecticut. Decision Letter and Staff Report Request for Revision Revision Decision  Notice of Completion  Transfer of Site Ownership and Control and Council Acknowledgement Approved 04/16/15.

PETITION NO. 1145 – 2014 ESA Project Company LLC Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 816 Hartford Turnpike, Waterford, Connecticut. Decision Letter and Staff Report Status Update - Constructed   Transfer of Site Ownership and Control and Council Acknowledgement Approved 04/16/15.

PETITION NO. 1146– 2014 ESA Project Company LLC Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 1580 Litchfield Turnpike, New Hartford, Connecticut.   Revised Abutters List.   Revised Abutter's Notification  Decision Letter and Staff Report Amendment Submission. Decision on Amendment Status Update - Constructed Notice of Completion  Transfer of Site Ownership and Control and Council Acknowledgement Approved 04/30/15

PETITION NO. 1147 - 2014 ESA Project Company LLC Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 1932 Norwich-New London Turnpike, Montville, Connecticut. Revised Abutters ListDecision Letter and Staff Report Status Update - Constructed  Transfer of Site Ownership and Control and Council Acknowledgement Approved 04/30/15

PETITION NO. 1148  - 2014 ESA Project Company LLC Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 600 Connecticut Avenue, Norwalk, Connecticut. Incomplete Notice.  Revised Abutters List.Site Plan.Home Depot Fuel Cell Sound Study.Decision Letter and Staff ReportStatus Update - Constructed   Transfer of Site Ownership and Control and Council Acknowledgement  Approved 05/14/15.

PETITION NO. 1149 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 109 Federal Road, Danbury, Connecticut. Decision Letter and Staff Report Completion Letter Approval of Minor Project Change Approved 04/16/15.

PETITION NO. 1150 -SolarCity Corporation Tesla Energy Operations – , Inc.  petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 3.1 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on Brush Hill Road in Bozrah, Connecticut. Record Decision Letter and Staff Report Approved 06/11/15

PETITION NO. 1151 – The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal and replacement of the existing 115-kV transmission line structures in the Connecticut Department of Transportation right-of-way outside of Milvon substation located at 772 Bridgeport Avenue, Milford, Connecticut. Record Decision Letter and Staff Report Approved 05/28/15
  
PETITION NO. 1152 - PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility located at East Lyme Tax Assessor Map 30, Lot 1, Ancient Highway, East Lyme, Connecticut. New Cingular Wireless Record Withdrawal without Prejudice 06/08/15 CSC Acknowledgement of Withdrawal Withdrawn 06/08/15.

PETITION NO. 1153 – petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Sandy Hook Substation and associated transmission lines located at 13 Farmery Road, Newtown, Connecticut. Eversource Energy Abutters List & Map. Date of Decision Letter. Decision Letter and Staff Report Completion Letter Approved 06/25/15

PETITION NO. 1154 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Haddam Substation and associated 345-kV and 115-kV transmission lines located at 1384 Saybrook Road, Haddam, Connecticut. Request for Status Status Approval Decision Letter and Staff Report Landscaping Plan & Retaining Wall Details. Request for Amendment to Petition 11/04/15 Revision Decision Temporary Hours Revision and Decision.  Semi-Annual Status of Construction Report, 12/23/16 Temporary Hours Revision and Decision Completion Letter Semi-Annual Status of Construction Report, 07/03/2017 Approved 06/11/15

PETITION NO. 1155 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 19 Main Street, Old Saybrook, Connecticut. Decision Letter and Staff Report ModificationModification  Decision Construction Complete Approved 05/28/15

PETITION NO. 1156 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing 120-foot tall telecommunications facility with a new 150-foot telecommunications facility located at property owned by Eversource Energy used as a service center and maintenance yard, 2 Tindall Avenue, Norwalk, Connecticut.     Signed Abutter LetterNorwalk Mailing List. Carrier Interest Memo. T -Mobile Response Letter to CSC. Verizon Interest Letter   Decision Letter and Staff Report Final Structural Design Drawings Completion Letter Approved 06/11/15

PETITION NO. 1157 -  Eversource  Energy and The United Illuminating Company joint petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission substation remediation activities to comply with the North American Electric Reliability Corporation (NERC) Reliability Standards for Critical Infrastructure Protection.  Decision Letter Protective Order  Decision Letter Protective Order Approved 06/11/15

PETITION NO. 1158 - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 398 Somers Road, Ellington, Connecticut. Decision Letter and Staff Report Approved 06/25/15 Completion Letter

PETITION NO. 1159 -  Lodestar Energy LLCLSE Canis Major LLC declaratory ruling  that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0 MW AC Solar Photovoltaic Electric Generating facility located at 1005 North Street, Suffield, Connecticut.  Approved 09/03/15

PETITION NO. 1160 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing industrial building located at 278 Oakwood Drive, Glastonbury, Connecticut. .Decision Letter and Staff Report Completion Letter Approved 06/25/15

PETITION NO. 1161 - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing residential apartment building located at 96 Clinic Drive, New Britain, Connecticut. Decision Letter and Staff Report Completion Letter Approved 07/10/15.

PETITION NO. 1162  - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Hopewell Substation located at 1007 Chestnut Hill Road, Glastonbury, Connecticut.   Decision Letter and Staff Report Construction Complete Status Report Approved 07/23/15.

PETITION NO. 1163  - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 475-479 Howe Avenue (Route 110), Shelton, Connecticut. .Decision Letter and Staff Report Completion Letter Approved 07/23/15.

PETITION NO. 1164  - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing commercial building at Mystic Aquarium located at 55 Coogan Boulevard, Mystic (Stonington), Connecticut. Decision Letter and Staff Report Completion Letter Approved 07/23/15.

PETITION NO. 1165  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing mixed use building located at 37 Main Street, Jewett City (Griswold), Connecticut. Decision Letter and Staff Report Construction Complete Approved 07/23/15

PETITION NO. 1166  - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 1095 Kennedy Road, Windsor, Connecticut. Decision Letter and Staff Report Completion Letter Approved 08/06/15

PETITION NO. 1167 - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing industrial storage building located at 85-91 South Leonard Street, Waterbury, Connecticut. Decision Letter and Staff Report.  Structural Evaluation Letter Completion Letter. Approved 08/06/15

PETITION NO. 1168 Algonquin Gas Transmission, LLC Petition for a Declaratory Ruling Regarding the Jurisdiction of the Connecticut Siting Council over the construction or replacement of natural gas pipeline facilities in the City of Danbury, Connecticut; modifications to compressor stations in the towns of Oxford and Chaplin, Connecticut; modifications to an existing metering station in the City of Danbury, Connecticut; construction of a new metering station in the city of Norwich, Connecticut, which will replace an existing metering station in Norwich, all as part of the Atlantic Bridge Project; and for recommendations regarding siting, environmental mitigation measures, and construction procedures to the Federal Energy Regulatory Commission.  Field Review Handout. Decision Letter Approved 09/03/15.

PETITION NO. 1169 - Blue Sky Towers, LLC and New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility to be located at 220 Evergreen Street, Bridgeport, Connecticut. Interrogatories to Petitioner Set 1.Response to Set 1 Interrogatories  Department of Transportation Comment Decision Letter and Staff Report Approved 08/06/15

PETITION NO. 1170  - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on top of an existing abandoned utility pole adjacent to an existing industrial building located at 330 Newington Road, West Hartford, Connecticut. Decision Letter and Staff Report Completion Letter Approved 09/03/15

PETITION NO. 1171  - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing South Windsor Public Library building located at 1550 Sullivan Avenue, South Windsor, Connecticut. Decision Letter and Staff Report Completion Letter Approved 09/03/15

PETITION NO. 1172  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 934 Boston Post Road, Guilford, Connecticut.   Letter from First Selectman with Response. Decision Letter and Staff Report Noncompliance Letter Will Not Construct Letter Approved 09/03/15

PETITION NO. 1173  - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of two 400-kilowatt Customer-Side Fuel Cells to be located at Amgraph Packaging, Inc., 90 Inland Road, Sprague, Connecticut.  Incomplete Letter Corrected Filing. Second Corrected Filing. Decision Letter and Staff Report Status Update Approved 09/03/15

PETITION NO. 1174  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at Lake Compounce Amusement Park, off Mount Vernon Road, Southington, Connecticut.  Decision Letter and Staff Report Completion Letter Approved 09/03/15

PETITION NO. 1175  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at Bear Creek Campground at Lake Compounce Amusement Park, off Mount Vernon Road, Southington, Connecticut.   Decision Letter and Staff Report Completion Letter Approved 09/03/15

PETITION NO. 1176 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Bridgeport 115-kV transmission line upgrade project consisting of the northern and southern sections of 115-kV lines extending from Congress Substation in the City of Bridgeport to Baird Substation in the Town of Stratford, Connecticut, and related substation improvements. Decision and Staff Report Approved 09/17/15

 PETITION NO. 1177 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 67 Newtown Road, Danbury, Connecticut. Decision Letter and Staff Report Acknowledgement Equipment Letter Completion Letter Approved 09/17/15

PETITION NO. 1178 - Fusion Solar Center, LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation and maintenance of a ground-mounted 20 megawatt solar photovoltaic electric generating facility located on Potash Hill Road, Sprague, Connecticut. Record Decision Letter and Staff Report Approved 09/17/15

PETITION NO. 1179  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing commercial building located at 137 South Main Street, West Hartford, Connecticut. Decision Letter and Staff Report Notice of Completion Approved 09/17/15

PETITION NO. 1180 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing building at Holy Family Monastery Retreat House & Center located at 303 Middle Road, Farmington, Connecticut. Decision Letter and Staff Report Noncompliance Letter Will Not Construct Letter Approved 10/01/15

PETITION NO. 1181 - Tesla Energy Operations, Inc.  SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 4.93 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located at 9 Stott Avenue & 292 Plain Hill Road, Norwich, Connecticut. Record Decision Letter and Staff Report Approved 11/12/15

PETITION NO. 1182 - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing building at Farm Car Care Center Inc. located at 11 Windermere Avenue, Vernon, Connecticut. Revised Plan Sheet C-2 Decision Letter and Staff Report Completion Letter Approved 10/01/15

PETITION NO. 1183 - Wallingford Energy II, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of two natural gas fired 50 megawatt peaking units and associated equipment at an existing electric generating facility located at 115 John Street, Wallingford, Connecticut. Approved 11/12/15.

PETITION NO. 1184 - Beacon Falls Energy Park, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 63.3 Megawatt AC fuel cell facility located on Lopus Road, Beacon Falls, Connecticut. Record Findings of Fact Opinion Decision and Order Approved 01/07/16 WITHDRAWN 01/30/20

PETITION NO. 1185 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Sanctuary of Faith and Glory Church located at 752 Bloomfield Avenue, Windsor, Connecticut. Date for Decision Decision Letter and Staff Report Will Not Complete Letter Approved 11/12/15.

PETITION NO. 1186 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed partial decommissioning of 0.5 miles of existing 115-kV transmission line and modifications to its existing 115-kV transmission line and related substation improvements located at 181 Cove Road, Haddam, Connecticut. Date for Decision Revised DrawingsDecision Letter and Staff ReportCompletion LetterApproved 11/12/15.

PETITION NO. 1187 - Cellco Partnership- d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Griswold High School located at 303 Slater Avenue, Griswold, Connecticut. Date for Decision Decision Letter and Staff Report Completion Letter Approved 11/12/15

PETITION NO. 1188 - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 1081 Huntington Road, Stratford, Connecticut. Date for Decision FCC Compliance. Discussion of Safety Criteria. Response to CSC. Decision Letter and Staff Report Completion Letter Approved 11/12/15.

PETITION NO. 1189 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Mix Avenue Substation located at 690 Mix Avenue, Hamden, Connecticut and related improvements to existing electric transmission line circuits from Mix Avenue Substation to Glen Lake Junction and from June Street Substation to Pease Road.  Interrogatories to Petitioner Set 1.Responses. CSC Response 2 Attachment. Date for Decision. Decision Letter and Staff Report Revised Drawings Completion Letter Outstanding Condition Letter Landscaping Plan & Stormwater Pollution Control Plan Part 1 Part 2 Approved 11/12/15

PETITION NO. 1190 - Bloom Energy Corporation, as an agent for Hyatt Hotels Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 500-Kilowatt Fuel Cell to be located at the Hyatt Hotel building at 1800 East Putnam Avenue, Greenwich, Connecticut. Department of Transportation Comments Interrogatories to Petitioner Set 1 Responses to Interrogatories Date for Decision Decision Letter and Staff Report Status Update - Constructed Approved 11/12/15.

PETITION NO. 1191 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing industrial building located at 8 Custom Drive, Old Saybrook, Connecticut. Decision Letter and Staff Report Completion Letter Approved 11/12/15

PETITION NO. 1192 - Tesla Energy Operations, Inc. SolarCity Corporation  petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 2.74 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located at two City of Norwich-owned parcels on Rogers Road, Norwich, Connecticut. . Record Staff Report and Decision Letter Approved 11/12/15

PETITION NO. 1193 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility at Lime Rock Park, 497 Lime Rock Road, Lakeville, Connecticut.  Staff Report and Decision Letter Approved 11/12/15.

PETITION NO. 1194- Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing abandoned grain elevator structure at 140 Route 32, Franklin, Connecticut. Staff Report and Decision Letter Completion Letter Approved 11/12/15

PETITION NO. 1195 - petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 4.05 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on municipally-owned property at 1240 Poquonnock Road, Groton, Connecticut. SolarCity Corporation Record Staff Report and Decision Letter Approved 1/7/16 - Withdrawn 06/04/18

PETITION NO. 1196  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell unipole telecommunications facility on the roof of the existing Veterans Memorial Ice Arena located at 56 Buena Vista Road, West Hartford, Connecticut. Staff Report and Decision Letter Completion Letter Approved 12/10/15

PETITION NO. 1197  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing commercial building at 1 Anngina Drive, Enfield, Connecticut. Staff Report and Decision Letter Notification - Will Not Complete Approved 12/10/15

PETITION NO. 1198 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing building located at 1663 South Main Street, Waterbury, Connecticut.  Staff Report and Decision Letter Completion Letter Approved 12/10/15

PETITION NO. 1199- The United Illumnating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a 2.8 Megawatt AC Fuel Cell to be located at Amity Regional High School, 25 Newton Road, Woodbridge, Connecticut.   Abutters Map UI Responses to Roscaso Questions Date for Decision UI Supplemental Filing Dept. of Transportation Comments Staff Report and Decision Letter Notice of Pipe Cleaning and Procedures Completion Letter Letter Regarding Pressure Valve Approved 01/07/16.

PETITION NO. 1200 2015 ESA Project Company, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of an 800 Kilowatt Fuel Cell Facility to be located at Parkville Community Elementary School, 1755 Park Street, Hartford, Connecticut.  Comments from the City of Hartford Department of Public Works Additional Comments from the City of Hartford Department of Public Works Date for Decision Dept. of Transportation Comments Staff Report and Decision Letter Council Non-Compliance Letter Completion Letter and Council Acknowledgement Notice of Upstream Parent Company Change and Council Acknowledgement Approved 01/07/16

PETITION NO. 1201 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconductoring of approximately 1.75 miles of its existing No. 1810 115-kV transmission line from Forestville Junction in Southington to Lake Avenue Junction in Bristol, rebuilding and reconductoring of approximately 1.85 miles of its existing Nos. 1800 and 1810 115-kV transmission lines from Southington Substation in Southington to Structure No. 1815 in Southington, reinforcement of an existing transmission structure at Southington Substation in Southington, and related substation and transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 01/21/16

PETITION NO. 1202 - FuelCell Energy, Inc. petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1.4 MW fuel cell combined heat and power electric generating facility located at Pepperidge Farm, Inc., 1414 Blue Hills Avenue, Bloomfield, Connecticut. Comments from the Drinking Water Section of the Department of Public Health Date for Decision SHPO Response Staff Report and Decision Letter Construction Commencement Letter Pipe Cleaning Procedures Completion Letter. Approved 01/21/16

PETITON NO. 1203 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop wireless telecommunications facility on an existing barn located at 212 Deans Mill Road, Stonington, Connecticut. Staff Report and Decision Letter Completion Letter Approved 01/21/16

PETITION NO. 1204  - Bloom Energy Corporation, as an agent for Legrand, S.A., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 500-Kilowatt Fuel Cell Facility to be located at Legrand Wiremold, 60 Woodlawn Street, West Hartford, Connecticut.  .Incomplete Letter Response to Incomplete Letter Interrogatories Response to Interrogatories Date of Decision Letter Request for Sound Study Sound Study Report Staff Report and Decision Letter Status Update - Constructed Approved 02/18/16

PETITION NO. 1205 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at the Bristol Shopping Center, 597 Farmington Avenue, Bristol, Connecticut. Withdrawn

PETITION NO. 1206 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing commercial building located at the Old Saybrook Shopping Center, 665 Boston Post Road, Old Saybrook, Connecticut.   Staff Report and Decision Letter Will Not Construct Approved 01/21/16

PETITION NO. 1207 - Bloom Energy Corporation, as an agent for Wal-mart Stores, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at Walmart, 450 Providence Road, Brooklyn, Connecticut. Incomplete Letter Second Incomplete Letter Abutter's Overview Interrogatories DPH Comments Corrected Proof of Notice Response to Interrogatories Staff Report and Decision Letter Fire Prevention & Emergency Planning Council Non-Compliance Letter Will Not Construct Correspondence Approved 02/18/16

PETITION NO. 1208 - Bloom Energy Corporation, as an agent for Wal-mart Stores, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Sam’s Club store, 69 Pavillions Drive, Manchester, Connecticut. Incomplete Letter Second Incomplete Letter Interrogatories DPH Comments Corrected Text Letter Regarding Previous Approval Response to Interrogatories Staff Report and Decision Letter Fire Prevention & Emergency Planning Compliance with Condition #1Council Non-Compliance Letter Will Not Construct Correspondence Approved 02/18/16.

PETITION NO. 1209 - Cellco Partnershipd/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the existing Hoffman Car Dealership building located at 36 Albany Turnpike, Simsbury, Connecticut. .Staff Report and Decision Letter Completion Letter Approved 02/04/16

PETITION NO. 1210 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the existing Data Guard Records Centers building located at 1930 West Main Street, Stamford, Connecticut. Staff Report and Decision Letter Will Not Construct Letter Approved 02/04/16

PETITION NO. 1211 - Cellco Partnership  d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the existing Newtown Youth Academy Sports and Fitness Center building located at 4 Primrose Street, Newtown, Connecticut.  Staff Report and Decision Letter Council Non-Compliance Letter Will Not Complete Approved 02/18/16

PETITION NO. 1212 - Town of Cheshire petition for a declaratory ruling for the Connecticut Siting Council to assume jurisdiction over an un-certificated telecommunications facility located at 1338 Highland Avenue, Cheshire, Connecticut. Record Staff Report and Decision Approved 01/07/16

PETITION NO. 1213 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the side of the existing Quassy Amusement Park maintenance building located at 2132 Middlebury Road, Middlebury, Connecticut. Staff Report and Decision Letter Construction Complete Approved 02/18/16

PETITION NO. 1214 - Groton Fuel Cell 1, LLC petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 5.6 megawatt fuel cell combined heat and power electric generating facility located at the Pfizer Groton campus, 445 Eastern Point Road, Groton, Connecticut. Approved 03/03/16.

PETITION NO. 1215   -Shagbark Lumber and Farm Supplies, Inc. RER CT 57 LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 1.6 Megawatt Solar Photovoltaic Electric Generating facility located at 21 Mount Parnassus Road, a/k/a Route 434, East Haddam, ConnecticutApproved 03/03/16.

PETITION NO. 1216  - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental is required for the proposed modifications to its existing Long Mountain Switching Station located at Long Mountain Road, New Milford, Connecticut and the reconductoring of approximately 5.3 miles of its existing No. 398 345-kV transmission line from Long Mountain Switching Station to the New York/Connecticut state line in New Milford, Sherman, and Kent, Connecticut, and related transmission line structure improvements. Compatibility and Public Need Approved 03/31/16.

PETITION NO. 1217 -  Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed separation of the existing 1779/1777 115 kilovolt (kV) electric transmission lines for 1.6 miles within existing right of way from Bloomfield Substation to Bloomfield Junction;  proposed separation of the existing 1751/1777 115kV electric transmission lines for 5.3 miles within existing right of way from Bloomfield Junction to North Bloomfield Substation; modifications to the existing overhead 1779 115 kV electric transmission line to loop into the Rood Avenue Substation via underground cables; including related transmission line structure improvements; and modifications to the Bloomfield Substation, 40 Crestview Drive and North Bloomfield Substation, 2 Hoskins Road both in Bloomfield, Connecticut and modifications to the Rood Avenue Substation located at 275 Rood Avenue, Windsor, Connecticut.  Approved 04/28/16.

PETITION NO. 1218 - GB II Connecticut LLC  PSEG Power Connecticut LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a new 485 megawatt (MW) dual fuel combined-cycle electric generating facility at the existing Bridgeport Harbor Station located at 1 Atlantic Street, Bridgeport, Connecticut. (Findings of Fact) (Opinion) (Decision and Order) Approved 07/21/16.

PETITION NO. 1219 -    Quantum Biopower Southington, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1.1 megawatt anaerobic digestion and combined heat and power electric generating facility located at 49 DePaolo Drive, Southington, Connecticut. Approved 04/14/16

PETITION NO. 1220Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and one 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located at 1219 and 1240 Voluntown Road, Griswold, Connecticut. Approved 06/23/16

PETITION NO. 1221  -  Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of two 1.0 Megawatt and one 1.5 Megawatt Solar Photovoltaic Electric Generating facilities located at 91 Plainfield Pike Road, Plainfield, Connecticut.  Denied 07/21/16

PETITION NO. 1222 -  Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and four 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located southeast of Hartford Turnpike and south of Fisk Road, Hampton, Connecticut.  Approved in part and Denied in part, 07/21/16.

PETITION NO. 1222A - Windham Solar LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and four 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located southeast of Hartford Turnpike and south of Fisk Road, Hampton, Connecticut. Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).  Approved 4/22/21 Link to PETITION NO. 1222

PETITION NO. 1223 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 3.9 Megawatt Solar Photovoltaic Electric Generating facility located on municipally-owned property off Old Forge Road, Rocky Hill, Connecticut. Approved 05/12/16.

PETITION NO. 1224  - Woods Hill Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 17.61 Megawatt AC Solar Photovoltaic Electric Generating facility located at 90 and 101 Woods Hill Road, Pomfret, Connecticut. Approved 05/12/16.

PETITION NO. 1225  - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed rebuilding and reconductoring of approximately two miles of its existing No. 1682 115-kV transmission line within existing right of way from the Wilton Substation at 53 Old Danbury Road, Wilton to Norwalk Junction at 111 Danbury Road, Wilton, Connecticut. Semi-annual Status of Construction Report, 07/03/17 Approved 05/26/16.

PETITION NO. 1226 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of the new 115-kV Towantic Switching Station to be located adjacent to the Towantic Generating Station on Woodruff Hill Road, Oxford, Connecticut and the proposed modifications within existing right-of-way to its existing 1575 and 1585 115-kV electric transmission line extending 6.1 miles from Bunker Hill Substation, located at Clough Road, Waterbury, south through Middlebury to the proposed Towantic Switching station and reconductoring of its existing 1575 115-kV electric transmission line extending one mile from the proposed new switching station south to Structure 1446 (Oxford Tap) located near the Oxford Substation, Commerce Drive, OxfordSemi-annual Status of Construction Report, 07/03/17 Approved 05/26/16.

PETITION NO. 1227  - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of electric transmission line structures within approximately .8 miles of existing right of way along its existing No. 1975 115-kV transmission line traversing the municipalities of Middlefield, Durham and Middletown, Connecticut, and related transmission line structure improvements. 
Approved 05/26/16

PETITION NO. 1228  - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Pootatuck Substation located at 14 Old Stratford Road in Shelton, Connecticut and related modifications to adjacent 115-kV transmission lines within existing Eversource Energy right-of-way. Approved 07/07/16

PETITION NO. 1229  - Bloom Energy Corporation, as an agent for Ikea, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the Ikea store, 450 Sargent Drive, New Haven, Connecticut.  Approved 06/23/16

PETITION NO. 1230 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Stony Hill Substation including the installation of a new access road to the substation on Eversource’s property located at 49 Stony Hill Road, Brookfield, Connecticut.  Semi-annual Status of Construction Report, 07/03/17 Approved 06/23/16

PETITION NO. 1231   -  Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal and replacement of existing double-circuit lattice Structure 6-101 with two proposed single-circuit monopole structures to separate the existing 115-kilovolt (kV) 1572 and 1620 electric transmission lines located at NRG Energy, Inc.’s existing Middletown Power, LLC electric generating facility located at 1866 River Road, Middletown, Connecticut and related transmission line structure improvements.  Approved 06/23/16

PETITION NO. 1232  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing telecommunications facility located at 167 Coccomo Circle (a/k/a Lester Street), New Britain, Connecticut. Approved 06/23/16

PETITION NO. 1233   - Dominion Energy Nuclear Connecticut, Inc. Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that neither a new Certificate of Environmental Compatibility and Public Need(Certificate) nor a modification of the existing Certificate is required for the proposed construction, maintenance and operation of an on-site horizontal storage module fabrication area at the Millstone Power Station, Rope Ferry Road, Waterford , Connecticut.  Approved 07/21/16. Name Change 07/31/17

PETITION NO. 1234   -  SolarCity Corporation  DG Connecticut Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 2.8 Megawatt Solar Photovoltaic Electric Generating facility located at Becton, Dickinson & Company, 7 Grace Way, North Canaan, Connecticut. Approved 07/21/16

PETITION NO. 1235Doosan Fuel Cell America, Inc. Constellation New Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility to be located at Middletown High School, 200 La Rosa Lane, Middletown, Connecticut. Approved 07/21/16

PETITION NO. 1236   -  Doosan Fuel Cell America, Inc. Constellation New Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility to be located at New Britain High School, 110 Mill Street, New Britain, Connecticut.  Approved 07/21/16

PETITION NO. 1237  -  Doosan Fuel Cell America, Inc. Constellation New Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility to be located at Shelton High School, 120 Meadow Street, Shelton, Connecticut. Approved 07/21/16

PETITION NO. 1238   - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the 1779 transmission line traversing the municipalities of Hartford, East Hartford, and South Windsor, Connecticut, and related transmission line structure improvements. Approved 10/27/16

PETITION NO. 1239  – Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the planned addition of an impressed current cathodic protection system to the Iroquois pipeline located parallel to Webb Circle, Monroe, Connecticut.  Determination of FERC Jurisdiction 8/4/16

PETITION NO. 1240 - Wallingford Energy, LLC, on behalf of the Town of Wallingford Electric Division, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the town’s existing Wallingford 13M substation located at 195 East Street in Wallingford and modifications to several existing town-owned 115-kV electric transmission lines including the reconductoring and extension of the 1305 line, the circuit-separation of the 1630 and 1640 lines and the potential re-routing of the 1208 line located in Wallingford, Connecticut.  Approved 08/04/16.

PETITION NO. 1241 - Cellco Partnership d/b/a Verizon Wireless Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of a telecommunications facility to the northerly façade of an existing building located at 1247 New Haven Road, Naugatuck, Connecticut.  Approved 8/4/16

PETITION NO. 1242 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing office building located at 330 Market Street, Hartford, Connecticut. Approved 8/4/16 Will Not Complete

PETITION NO. 1243 -   The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Ansonia Substation located at 24 Franklin Street and 4 Riverside Drive in Ansonia, Connecticut. Approved 8/4/16

PETITION NO. 1244 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing commercial building located at 2985-3017 Berlin Turnpike, Newington, Connecticut. Approved 9/1/16.

PETITION NO. 1245  - T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of an additional rooftop wireless telecommunications facility located at the Connecticut Post Mall, 1201 Boston Post Road, Milford, Connecticut. Approved 9/1/16

PETITION NO. 1246  - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of one existing 69-kV dead-end wood electric transmission line structure, replacement of two existing 69-kilovolt (kV) wood H-frame tap angle electric transmission line structures (Line 100 and Line 400) with two 3-pole weathering steel angle electric transmission line structures, relocation of the conductors from the existing electric transmission line structures to the proposed electric transmission line structures located at Gales Ferry Substation, 301 Whalehead Road, Ledyard, Connecticut and related transmission line and substation improvements.  Semi-annual Status of Construction Report, 07/03/17 Approved 9/6/16

PETITION NO. 1247 – C-TEC Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a 3.75 MW solar photovoltaic electric generating facility located at   1 Ballard Road  65 Thompson Road, Thompson, Connecticut. Approved 9/1/16

PETITION NO. 1248   - TRS Fuel Cell, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 3.7 megawatt combined heat and power fuel cell facility to be located at 64 Triangle Street, Danbury, Connecticut. Approved 9/1/16

PETITION NO. 1249 - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the planned addition of a launcher and a mainline valve along the existing Iroquois pipeline right of way located off of Canterbury Lane in Newtown, Connecticut, and an above ground receiver and fuel cell generator to power the cathodic protection system along the existing Iroquois pipeline right of way located off of Stonebridge Trail in Newtown, Connecticut.  Approved 9/1/16.

PETITION NO. 1250 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of existing fence sections and the installation of grounding conductor within and outside the fence line at its existing New Congress Substation located at 55 Congress Street in Bridgeport, Connecticut. Approved 10/13/16.

 

PETITION NO. 1251     - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed rebuilding and reconductoring of approximately 3.8 miles of its existing No. 900 69-kV transmission line within existing right of way between Skungamaug Substation and Mansfield Junction in Coventry, Connecticut, and related transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17  Approved 11/10/16.

PETITION NO. 1252 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing 70-foot tall telecommunications facility with a new 120-foot tall telecommunications facility at property owned by Eversource Energy used as a service center and maintenance yard located at 22 East High Street, East Hampton, Connecticut. Semi-annual Status of Construction Report, 07/03/17 Approved 11/10/16

PETITION NO. 1253 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 99 Hamilton Avenue, Stamford, Connecticut. Approved 10/27/16.

 

PETITION NO. 1254 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility to be attached to the existing sign structure on the roof of the Kingdom Alliance Corp. building located at 327 Huntington Street, New London, Connecticut. Approved 11/10/16.

 

PETITION NO. 1255 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Branford Double-Circuit Tower Split Project that includes modifications to the existing electric transmission line structure No. 4800, installation of a new electric transmission line structure No. 4782 and the separation of two existing 115-kilovolt (kV) electric transmission line circuits located within existing Eversource electric transmission line right of way between Interstate 95 and Eversource’s Branford Substation facility, East Main Street, Branford, Connecticut. Semi-annual Status of Construction Report, 07/03/17Approved 11/10/16.

 

PETITION NO. 1256 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of approximately 8 miles of its existing No. 1620/1975 115-kilovolt electric transmission line structures with new transmission line structures within existing right of way between Haddam Substation and Oxbow Junction in Haddam, Connecticut, and related transmission line structure improvements.     Semi-annual Status of Construction Report, 07/03/17Approved 12/08/16.

 

PETITION NO. 1257 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing customer-side 400-kW fuel cell with a 440-kW customer-side combined heat and power fuel cell located at the Eastern Connecticut State University Science Building, 83 Windham Street, Willimantic, Connecticut.  Approved 12/8/16.

 

PETITION NO. 1258 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing rooftop telecommunications facility and for the proposed construction, operation and maintenance of an additional rooftop telecommunications facility on an existing medical office building located at 1389 West Main Street, Waterbury, Connecticut.  Approved 12/08/16

 

PETITION NO. 1259 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Thames River Crossing Structure Replacement Project that includes replacement and re-conductoring of four double-circuit electric transmission line structures along approximately .5 miles of existing Eversource right of way between Montville and Ledyard, Connecticut, and related transmission line structure improvements.  Semi-annual Status of Construction Report, 07/03/17Approved 12/8/16.

 

PETITION NO. 1260 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 400-Kilowatt Fuel Cell Facility to be located at the Frontier building, 2 Washington Street, Norwalk, Connecticut. Approved 12/08/16.

 

PETITION NO. 1261 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing Verizon Wireless retail store building located at 70 Buckland Road, South Windsor, Connecticut.  Approved 12/8/16.

PETITION NO. 1262 - Doosan Fuel Cell America, Inc. Doosan Energy Solutions America, Inc. declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of 1380-kilowatt customer-side combined heat and power fuel cell facility to be located at the Borough of Naugatuck Waste Water Treatment Plant, 500 Cherry Street Extension, Naugatuck, Connecticut. Approved 2/16/17.

 

PETITION NO. 1263 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing customer-side 400 kilowatt (kW) fuel cell facility with a 440-kW customer-side fuel cell facility located at Mount Sinai Hospital, 500 Blue Hills Avenue, Hartford, Connecticut. Approved 03/02/17.

 

PETITION NO. 1264 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 400-Kilowatt Fuel Cell Facility to be located at the Frontier building, 25 Butler Street, Meriden, Connecticut. Approved 1/19/17.

 

PETITION NO. 1265 - Doosan Fuel Cell America Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a customer-side 460-kilowatt fuel cell facility to be located at the Norwich Inn and Spa, 607 West Thames Street, Norwich, Connecticut. Approved 03/16/17.

 

PETITION NO. 1266 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1840-kilowatt customer-side fuel cell facility to be located at the Waterbury Water Pollution Control Plant, 210 Municipal Road, Waterbury, Connecticut. Approved 2/16/17.

 

PETITION NO. 1267 - Doosan Fuel Cell America Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a customer-side 460-kilowatt combined heat and power fuel cell facility to be located at the Glastonbury High School, 330 Hubbard Street, Glastonbury, Connecticut. Withdrawn.

 

PETITION NO. 1268 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 460-kilowatt customer-side combined heat and power fuel cell facility to be located at the Unilever Research and Development Center building, 20 Merritt Boulevard, Trumbull, Connecticut. Approved 03/16/17.

 

PETITION NO. 1269 - Doosan Fuel Cell America Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a customer-side 920-kilowatt combined heat and power fuel cell facility to be located at the Zygo Corporation, Laurel Brook Road, Middlefield, Connecticut.  Withdrawn.

 

PETITION NO. 1270 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing customer-side 200-kilowatt fuel cell facility with a 460-kilowatt customer-side combined heat and power fuel cell facility to be located at the Fairfield Wastewater Treatment Facility, 183 Richard White Way, Fairfield, Connecticut. Approved 03/16/17.

 

PETITION NO. 1271 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the Hyllier dormitory building located at the University of Hartford, 200 Bloomfield Avenue, West Hartford, Connecticut. Approved 1/19/17.

 

PETITION NO. 1272- Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 1.4-Megawatt Fuel Cell Facility to be located at the Frontier building, 310 Orange Street, New Haven, Connecticut. Approved 1/19/17.

 

PETITION NO. 1273 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on a new approximately 38-foot Eversource-owned utility pole that is not used principally for electric distribution service located in a public right of way adjacent to 264 Metcalf Road, Tolland, Connecticut. Approved 12/22/16.

 

PETITION NO. 1274 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Frontier building, 39 West Street, Danbury, Connecticut. Approved 1/19/17.

 

PETITION NO. 1275 - Bloom Energy Corporation, as an agent for Stanley Black& Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Stanley Access Technologies building, 65 Scott Swamp Road, Farmington, Connecticut. Approved 2/16/17.

 

PETITION NO. 1276 - Bloom Energy Corporation, as an agent for Stanley Black& Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Stanley Engineered Fastening building, 4 Shelter Rock Lane, Danbury, Connecticut. Approved 1/19/17.

 

PETITION NO. 1277- Bloom Energy Corporation, as an agent for Stanley Black& Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the Stanley Black & Decker World Headquarters, 1000 Stanley Drive, New Britain, Connecticut. Approved 2/16/17.

 

PETITION NO. 1278 - Bloom Energy Corporation, as an agent for Medtronic Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at 20 Middletown Avenue and a Customer-Side 300 Kilowatt Fuel Cell Facility to be located at 195 McDermott Road, both located at the Medtronic campus in North Haven, Connecticut. Approved 2/16/17.Link to Petition 1278A

 

PETITION NO. 1278A - Bloom Energy Corporation, as an agent for Medtronic Inc., request to amend its declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Phase II construction, operation and maintenance of a Customer-Side 2000-Kilowatt fuel cell facility to be located at 86 Middletown Road and a second Customer-Side 2000-Kilowatt Fuel Cell Facility to be located at 195 McDermott Road, both located at the Medtronic campus in North Haven, Connecticut. Approved 12/05/19Link to Petition No. 1278

PETITION NO. 1278B - Bloom Energy Corporation, as an agent for Medtronic Inc., second request to amend to its declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, operation and maintenance of an additional customer-side 2,000-kilowatt fuel cell facility to be located at the Medtronic campus, 195 McDermott Road, North Haven, Connecticut.  Link to Petition No. 1278  Link to Petition No. 1278A  Approved 10/12/23

PETITION NO. 1279 - Bloom Energy Corporation, as an agent for The TJX Companies Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 500-Kilowatt Fuel Cell Facility to be located at the TJX building, 1415 Blue Hills Avenue, Bloomfield, Connecticut. Approved 2/16/17.

 

PETITION NO. 1280 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 35-37 Danbury Road, Ridgefield, Connecticut. Approved 1/19/17.

 

PETITION NO. 1281 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 35-kilowatt propane-fueled back-up generator and a 1,000 gallon propane tank at an existing wireless telecommunication facility located at 21 Acorn Road, Branford, Connecticut.  Approved 1/19/17.

 

PETITION NO. 1282 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a wireless telecommunications facility on the roof of the existing office building located at 208 Harbor Drive, Stamford, Connecticut. Approved 03/16/17.

PETITION NO. 1283  - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Southington Substation located at 315 Belleview Avenue, Southington, Connecticut.  Approved 2/16/17.

PETITION NO. 1284 - Bloom Energy Corporation, as an agent for FedEx Ground, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the FedEx Ground building, 40 Kennedy Road, South Windsor, Connecticut. Approved 2/16/17.

PETITION NO. 1285 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on a replacement light pole located at Samuel M. Peretz Park, 221 West Main Street, Niantic (East Lyme), Connecticut. Approved 2/16/17.

 

PETITION NO. 1286 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed West Brookfield Reliability Project that includes reconductoring of approximately 1.4 miles of its existing No. 1887 115-kilovolt (kV) electric transmission line within existing Eversource electric transmission line right of way between the existing West Brookfield Substation located at 83 Prange Road and the existing West Brookfield Junction near Pocono Road in Brookfield, Connecticut, installation of two 14.4 Megavolt Ampere Reactive (MVAR) capacitor banks at the West Brookfield Substation located at 83 Prange Road, Brookfield, Connecticut and related substation and transmission line structure improvements.  Approved 03/16/17.

 

PETITION NO. 1287 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Redding to Wilton Project that includes structure and conductor replacements of approximately 5 miles of its existing No. 1470 115-kilovolt electric transmission line within existing Eversource electric transmission line right of way between the existing Peaceable Substation located at 520 Peaceable Street in Redding, Connecticut and the existing Wilton Substation located at 53 Old Danbury Road in Wilton, Connecticut, and related substation and transmission line structure improvements.   Approved 03/02/17.

PETITION NO. 1288 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility to be attached to an existing chimney on the roof of the YWCA building located at 19 Franklin Square, New Britain, Connecticut. Approved 03/16/17.

 

PETITION NO. 1289 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Green Hill Substation located at 775 Green Hill Road, Madison, Connecticut.  Approved 03/30/17.

 

PETITION NO. 1290 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility to be attached to an existing facade on the roof of The Pavilion Restaurant building located at 85 Swan Avenue, Old Lyme, Connecticut. Approved 03/16/17.

PETITION NO. 1291 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the Towantic Line Upgrades Project that includes rebuilding and reconductoring approximately 4.4 miles of its existing 115-kilovolt electric transmission lines within existing Eversource right of way  between Devon 7R Substation and East Devon Junction both located in the City of Milford, Connecticut; between the West Devon Junction located in the Town of Stratford, Connecticut and Trumbull Junction located in the Town of Trumbull, Connecticut; and between Devon 7R Substation located in the City of Milford, Connecticut and West Devon Junction located in the Town of Stratford, Connecticut and related transmission line structure improvements.  Approved 04/27/17.

 
PETITION NO. 1292 - Bloom Energy Corporation, as an agent for Digital Realty, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 2 Megawatt Fuel Cell Facility to be located at the Digital Realty building, 80 Merritt Boulevard, Trumbull, Connecticut. Approved 04/27/17.

 

PETITION NO. 1293 – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements to comply with the updated National Electric Safety Code clearance requirements. Approved 03/30/17.

 

PETITION NO. 1294 – LSE Canes Venatici LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0 megawatt AC Solar Photovoltaic Electric Generating facility located at East Windsor Tax Assessor Map 037, Block 65, Lot 027A, Wapping Road, East Windsor, Connecticut. (NORCAP North).  Approved 05/25/17.

 

PETITION NO. 1295 – LSE Coma Berenices LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0 megawatt AC Solar Photovoltaic Electric Generating facility located at East Windsor Tax Assessor Map 027, Block 65, Lot 031, 90 Wapping Road, East Windsor, Connecticut. (NORCAP South). Approved 05/25/17.

 

PETITION NO. 1296 - Bloom Energy Corporation, as an agent for Home Depot, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200 Kilowatt Fuel Cell Facility and a 100 Kilowatt Auxiliary Battery Storage Facility to be located at the Home Depot building, 111 Universal Drive North, North Haven, Connecticut. Approved 05/11/17.

 

PETITION NO. 1297 - Bloom Energy Corporation, as an agent for Home Depot, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200 Kilowatt Fuel Cell Facility and a 100 Kilowatt Auxiliary Battery Storage Facility to be located at the Home Depot building, 115 Putnam Boulevard, Glastonbury, Connecticut. Approved 05/11/17.

 

PETITION NO. 1298 - Bloom Energy Corporation, as an agent for Home Depot, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200 Kilowatt Fuel Cell Facility and a 100 Kilowatt Auxiliary Battery Storage Facility to be located at the Home Depot building, 440 Boston Post Road, Orange, Connecticut. Approved 05/26/17.  

PETITION NO. 1299 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of the existing commercial building located at 777 Boston Post Road, Darien, Connecticut.  Approved 5/30/2017.

 

PETITION NO. 1300 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and relocation of an existing rooftop telecommunications facility installed at the front of the building with a new rooftop telecommunications facility to be installed at the rear of the building located at 1 Circular Avenue, Hamden, Connecticut. Approved 7/20/2017.

 

PETITION NO. 1301 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the Masonicare Health Center building located at 22 Masonic Avenue, Wallingford, Connecticut Approved 6/22/2017
 
PETITION NO. 1302 -   The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing West Side Substation located at 52 Columbus Avenue, Middletown, Connecticut.   Approved 7/20/2017.

PETITION NO. 1303 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 1069 East Main Street, Stamford Connecticut. Approved 07/20/17.

PETITION NO. 1304 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Stratford 115-kV Transmission Line Upgrade Project consisting of the removal and relocation of northern and southern sections of existing 115-kilovolt (kV) transmission line structures from Connecticut Department of Transportation (ConnDOT) catenary structures within the Metro-North Railroad corridor to new 115-kV transmission line structures to be located within the existing ConnDOT right of way and upgrade of 115-kV conductors extending approximately 1.9 miles from UI’s Baird Substation to just west of the Housatonic River in Stratford, Connecticut, and related substation improvements. Approved 07/20/17.

PETITION NO. 1305 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of a commercial building located at 1280 Hartford Turnpike, Vernon, Connecticut. .Approved 7/20/2017

PETITION NO. 1306 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 597 Farmington Avenue in Bristol, Connecticut.. Approved 07/20/17

PETITION NO. 1307 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing banquet center building located at Ocean Beach Park, 98 Neptune Avenue, New London, Connecticut. Approved 7/20/2017.

PETITION NO. 1308 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of two existing radio telecommunications facilities with a new 63.6-foot telecommunications facility on the roof of its existing Danielson Work Center used as a service center and maintenance yard located on property owned by Eversource Energy at 173 Mechanic Street, Killingly, Connecticut. Approved 7/20/2017.
 
PETITION NO. 1309  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a telecommunications facility located at 93 North Airline Road, Wallingford, Connecticut. Approved 7/20/2017.

 

PETITION NO. 1310  - Quinebaug Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 50 megawatt AC solar photovoltaic electric generating facility on approximately 561 acres comprised of 29 separate and abutting privately-owned parcels located generally north of Wauregan Road in Canterbury and south of Rukstela Road and Allen Hill Road in Brooklyn, Connecticut.  Findings of Fact Opinion Decision and Order Denied Without Prejudice 12/7/17  Motion to Reopen

PETITION NO. 1310A – Quinebaug Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 50 megawatt AC solar photovoltaic electric generating facility on approximately 561 acres comprised of 29 separate and abutting privately-owned parcels located generally north of Wauregan Road in Canterbury and south of Rukstela Road and Allen Hill Road in Brooklyn, Connecticut. Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). Findings of Fact  Opinion   Decision and Order  Approved 04/23/20

PETITION NO. 1311 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of the existing Yarnall Athletic Center and Bookstore at Mitchell College located at 40 Debiasi Drive, New London, Connecticut. Approved 8/31/2017

PETITION NO. 1312 - Candlewood Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 20 megawatt AC (26.5 megawatt DC) solar photovoltaic electric generating facility located on a 163 acre parcel at 197 Candlewood Mountain Road and associated electrical interconnection to Eversource Energy’s Rocky River Substation on Kent Road in New Milford, Connecticut. Findings of Fact Opinion Decision and Order Approved 12/21/17 Court-ordered Remand Regarding Visibility Remand Findings of Fact Remand Opinion

 

PETITION NO. 1313 – DWW Solar II, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 26.4 megawatt AC solar photovoltaic electric generating facility on approximately 289 acres comprised of 5 separate and abutting privately-owned parcels located generally west of Hopmeadow Street (US 202/CT 10), north and south of Hoskins Road, and north and east of  County Road and associated electrical interconnection to Eversource Energy’s North Simsbury Substation west of Hopmeadow Street in Simsbury, Connecticut.  Findings of Fact Opinion  Decision and OrderApproved 12/21/17
 

PETITION NO. 1314 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 1555 Line Rebuild Project consisting of the structure and conductor replacements on its existing 115-kilovolt electric transmission line extending approximately 6.6 miles within existing Eversource electric transmission line right-of-way between the existing Bulls Bridge Substation located at 781 Kent Road and the existing Rocky River Junction located off Boardman Road in New Milford, Connecticut. Approved 8/31/2017

 

PETITION NO. 1315 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing community antenna television (CATV) tower located at 7 Colburn Road, Canterbury, Connecticut. Approved 8/31/2017

 
PETITION NO. 1316 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located 1245 Farmington Avenue, West Hartford, Connecticut. Approved 9/28/2017
 

PETITION NO. 1317 – Broad Street Fuel Cell, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 1.4 megawatt customer-side combined heat and power fuel cell facility to be located adjacent to and south of the Ferris Athletic Center at Trinity College, 300 Summit Street, Hartford, Connecticut.  Approved 09/14/2017

PETITION NO. 1318  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 3039 Main Street, Glastonbury, Connecticut. Approved 09/14/2017

PETITION NO. 1319 – New Cingular Wireless, PCS, LLC (AT&T), as agent for American Tower Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed extension of an existing telecommunications facility located at 585 South Main Street, Naugatuck, Connecticut. Approved 9/28/2017

PETITION NO. 1320 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing wireless telecommunications facility located at 36 Hatchetts Hill Road, Old Lyme, Connecticut. Approved 9/28/2017

 

PETITION NO. 1321- The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing East Shore Substation located at 1 Waterfront Street, New Haven, Connecticut. Approved 10/26/2017

 

PETITION NO. 1322 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing utility pole outside of the public right of way located at Mount Southington Ski Area, 396 and 412 Mount Vernon Road, Southington, Connecticut. Approved 9/28/2017

 

PETITION NO. 1323 - Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt AC and two 1.0 Megawatt AC solar photovoltaic electric generating facilities on an approximate 43 acre parcel located at 134 Bilton Road, Somers, Connecticut. Approved 1/22/2018

 

PETITION NO. 1324 – Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 1.0 Megawatt AC solar photovoltaic electric generating facilities located at Plainfield Pike Road, Plainfield, Connecticut. Withdrawn 10/04/17

PETITION NO. 1325 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing telecommunications facility on electric transmission line structure No. 9950, owned by Eversource Energy within an existing Eversource Energy electric transmission line right-of-way, located at the Birchwood Condominium Complex, 27 Crows Nest Lane, Danbury, Connecticut. Approved 1/19/2018
 

PETITION NO. 1326- Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 1385 Post Road East, Westport, Connecticut. Approved 11/09/17

PETITION NO. 1327 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 623 Pine Street, Bridgeport, Connecticut.   Approved 10/26/2017

PETITION NO. 1328 – Windham Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of one 1-megawatt (MW) and one .99-MW solar photovoltaic electric generating facilities located at 481 Mashamoquet Road, Pomfret, Connecticut. Approved 01/18/18  EXPIRED

PETITION NO. 1329- Doosan Energy Solutions America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 440 kilowatt fuel cell facility to be located at the West Haven Water Pollution Control Authority Complex, 2 Beach Street, West Haven, Connecticut. Doosan Fuel Cell America, Incorporated Approved 11/09/17

    

PETITION NO. 1330- MCM Communications, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a temporary tower facility and associated equipment to be located on Connecticut Water Company property at 1542 Boston Post Road, Westbrook, Connecticut.Approved 12/07/2017

 

PETITION NO. 1331– Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of two small cell telecommunications facilities at Lime Rock Park, 497 Lime Rock Road, Lakeville, Connecticut.    Approved 12/07/2017

PETITION NO. 1332 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side one-megawatt fuel cell facility to be located at the FedEx Ground building, Middle Street, Middletown, Connecticut.  Approved 12/07/2017

 

PETITION NO. 1333 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell telecommunications facility on the façade of the existing Enfield Fire District 1 building located at 200 Phoenix Avenue, Enfield, Connecticut.  Approved 12/21/2017

 

PETITION NO. 1334 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell telecommunications facility on the roof of an existing the Residence at Brookside building located at 117 Simsbury Road, Avon, Connecticut. Approved 12/21/2017

PETITION NO. 1335- Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell telecommunications facility on the façade of an existing commercial building located at 1187 East Main Street (Route 66), Meriden, Connecticut.  Approved 12/21/2017

 

PETITION NO. 1336 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to an existing wireless telecommunications facility located at 8 Custom Drive, Old Saybrook, Connecticut. Approved 12/21/2017

 

PETITION NO. 1337 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Stepstone to Green Hill Substation Upgrade Project that includes replacement of approximately 5.6 miles of its existing No. 1508 115-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right of way between Stepstone Substation located at 50 Stepstone Road, Guilford, Connecticut and Green Hill Substation located at 775 Green Hill Road, Madison, Connecticut, and related electric transmission line structure improvements. Approved 2/2/2018

 

PETITION NO. 1338 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 150 Danbury Road, Ridgefield, Connecticut. Approved 2/1/2018   Project Withdrawn 12/8/21

PETITION NO. 1339 – Wallingford Renewable Energy LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 19.99 MW AC ground-mounted solar photovoltaic electric generating facility located on approximately 158 acres of 3 contiguous parcels consisting of the former Wallingford Landfill and 2 parcels owned by the Materials Innovation and Recycling Authority west of Pent Road and associated electrical interconnection to Wallingford Electric Division’s Wallingford Substation in Wallingford, Connecticut.  Approved 03/29/2018

 

PETITION NO. 1340 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to an existing wireless telecommunications facility located at 623 Honeyspot Road, Stratford, Connecticut. Approved 03/15/18

 

PETITION NO. 1341  - The Durham Manufacturing Company petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.215-megawatt AC solar photovoltaic electric generating facility located at the Durham Manufacturing Company, 201 Main Street, Durham, Connecticut.  Approved 06/7/18.

PETITION NO. 1342 –  GRE GACRUX LLC CF North Haven LLC Clean Focus Yield LLC petition for declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.98-megawatt AC solar photovoltaic electric generating facility located at 232 Rimmon Road and 700 Middletown Avenue, North Haven, Connecticut.  Approved 06/7/18.

PETITION NO. 1343 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed PSEG Bridgeport Harbor Unit 5 Line Reconductoring Project consisting of conductor replacements on its existing No. 1670 115-kilovolt (kV) electric transmission line extending approximately 5.2 miles within existing Eversource electric transmission line right-of-way between the Southington Substation located at Belleview Avenue in Southington, Connecticut and Reservoir Junction located at Reservoir Road in New Britain, Connecticut, and related substation and electric transmission line structure improvements.  Approved 06/7/18.

PETITION NO. 1344 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of approximately 11 miles of its existing No. 1342 115-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right of way between the existing Green Hill Substation located at 775 Green Hill Road in Madison and the existing Bokum Substation located at 49 Bokum Road in Old Saybrook, Connecticut, traversing Madison, Killingworth, Clinton, Westbrook, Essex and Old Saybrook, and related electric transmission line structure improvements.  Approved 7/19/18

PETITION NO. 1345 –  Pawcatuck Solar Center LLC   North Stonington Solar Center, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 15 MW AC solar photovoltaic electric generating facility on approximately 353 acres comprised of four abutting parcels located east of Pendleton Hill Road, north of the Pawcatuck River and south of Interstate-95 with proposed access from Ella Wheeler Road, and associated electrical interconnection to Eversource Energy’s Shunock Substation west of Pendleton Hill Road in North Stonington, Connecticut. Approved 10/25/18

PETITION NO. 1345A –  North Stonington Solar Center, LLC declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 15 MW AC solar photovoltaic electric generating facility on approximately 353 acres comprised of four abutting parcels located east of Pendleton Hill Road, north of the Pawcatuck River and south of Interstate-95 with proposed access from Ella Wheeler Road, and associated electrical interconnection to Eversource Energy’s Shunock Substation west of Pendleton Hill Road in North Stonington, Connecticut.  Request for 1) an amendment to the declaratory ruling; and 2) approval of a Development and Management Plan. Approved 08/27/20 Link to Petition No. 1345 

PETITION NO. 1346 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and relocation of an existing telecommunications facility and an existing relay and control enclosure located at Manchester Substation, 250 Olcott Street, Manchester, Connecticut, and related substation improvements.Approved 7/19/18

PETITION NO. 1347– GRE GACRUX LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 16.78-megawatt AC solar photovoltaic electric generating facility located at 117 Oil Mill Road and associated electrical interconnection to Eversource Energy’s existing substation at 325 Waterford Parkway North in Waterford, Connecticut. Denied 10/25/18  Petition for Reconsideration Denied 12/06/18. Motion to Reopen

PETITION NO. 1347A – GRE GACRUX LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 16.78-megawatt AC solar photovoltaic electric generating facility located at 117 Oil Mill Road and associated electrical interconnection to Eversource Energy’s existing substation at 325 Waterford Parkway North in Waterford, Connecticut. Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).  Findings of Fact   Opinion   Decision and Order  Approved 11/05/20

PETITION NO. 1348 – Safari Energy, LLC, as agent for West Farms Mall, LLC, petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 2.019-megawatt AC solar photovoltaic electric generating facility located at West Farms Mall, 1500 New Britain Avenue, West Hartford and 500 South Road, Farmington, Connecticut. Approved 9/27/18

PETITION NO. 1349 - New Cingular Wireless PCS, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed extension of an existing wireless telecommunications facility located at 250 Meriden Waterbury Turnpike, Southington, Connecticut. Approved  10/25/18

PETITION NO. 1350 -  EIP Investment LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 19.98-megawatt combined heat and power fuel cell facility and associated equipment to be located within Building 107 on the corner of Curtis Street and the Pan Am Southern, LLC railroad tracks at the Stanley Black & Decker Campus, 480 Myrtle Street, New Britain, Connecticut. Approved 10/25/18

PETITION NO. 1350A EIP Investment LLC Generate NB Fuel Cells, LLC declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 19.98-megawatt combined heat and power fuel cell facility and associated equipment to be located within Building 107 on the corner of Curtis Street and the Pan Am Southern, LLC railroad tracks at the Stanley Black & Decker Campus, 480 Myrtle Street, New Britain, Connecticut. Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).  Link to PETITION NO. 1350  Approved 12/16/21

PETITION NO. 1351 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Wallingford to Branford Upgrade Project consisting of the replacement of approximately 10 miles of its existing No. 1655 115-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right of way between the existing East Wallingford Junction located at Traditions Golf Course in Wallingford and the existing Branford Substation located at 272 East Main Street in Branford, Connecticut, traversing Wallingford, North Haven, East Haven, North Branford and Branford, and related electric transmission line structure improvements. Approved 12/06/18

PETITION NO. 1352  - Nutmeg Solar, LLC, petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 19.6-megawatt AC solar photovoltaic electric generating facility on approximately 162 acres comprised of 9 separate parcels located generally south of Bailey Road and east of Route 191 (Broad Brook Road), and associated electrical interconnection to Eversource Energy’s Scitico Substation at 20 Bailey Road in Enfield, Connecticut.   Findings of Fact Opinion Decision and Order Approved 04/25/19

PETITION NO. 1353 - The United Illuminating Company petition for a declaratory ruling pursuant to Connecticut General Statutes §4-176 and §16-50k for the proposed modifications to the existing Seaview Tap Substation located at 1677 Seaview Avenue, Bridgeport, Connecticut.  Approved 12/06/18

PETITION NO. 1354 – Chatfield Solar Fund, LLC, petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.98-megawatt AC solar photovoltaic electric generating facility on approximately 25 acres located generally south of Route 80 (North Branford Road) and east of Chestnut Hill Road in Killingworth, Connecticut, and associated electrical interconnection to Eversource Energy’s Green Hill Substation located at 775 Green Hill Road, Madison, Connecticut. Findings of Fact Opinion Decision and Order Denied with Prejudice 05/09/19

PETITION NO. 1355 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility to be located at Carla’s Pasta, 50 Talbot Lane, South Windsor, Connecticut. Approved 12/06/18

PETITION NO. 1356 - T-Mobile Northeast, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility on the roof of the existing Ruth Haas Library at Western Connecticut State University located at 181 White Street, Danbury, Connecticut. Approved 12/06/18

PETITION NO. 1357 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to an existing wireless telecommunications facility located at 1052 Boston Post Road, Milford, Connecticut. Approved 02/14/19

PETITION NO. 1358 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on a new approximately 34-foot Eversource-owned utility pole that is not used principally for electric distribution service located in a public right of way adjacent to 53 Goodwives River Road, Darien, Connecticut. Approved 02/14/19  Project Withdrawn 12/08/21

PETITION NO. 1359 – Crown Castle  Crown Castle Towers 06-02 LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a temporary tower facility and associated equipment to be located at 445 Putnam Avenue, Hamden, Connecticut.  Approved 02/14/19  Expired - Not Completed

PETITION NO. 1360 – Sprint Spectrum Realty Company, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a temporary rooftop tower facility and associated equipment to be located at 201 High Ridge Road, Stamford, Connecticut. Approved 02/14/19

PETITION NO. 1361 - New Cingular Wireless PCS, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility and associated equipment on the roof of an existing building located at 500 Newfield Avenue, Stamford, Connecticut. Approved 03/28/19

PETITION NO. 1362 – Town of New Milford petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176, for a determination that the January 28, 2019 Development and Management Plan submitted by Candlewood Solar, LLC in Petition No. 1312 conflicts and/or is inconsistent with the Connecticut Siting Council’s December 21, 2017 final decision on Petition No. 1312.  Link to Petition No. 1312Denied 04/25/19

PETITION NO. 1363 – T-Mobile Northeast, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modification of an existing rooftop wireless telecommunications facility and associated equipment located at the Connecticut Post Mall, 1201 Boston Post Road, Milford, Connecticut.  Approved 04/25/19

PETITION NO. 1364 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial and residential building located at 192 Main Street, Norwich, Connecticut.  Approved 04/25/19Link to Petition No. 1364A

PETITION NO. 1364A - Cellco Partnership d/b/a Verizon Wireless request to amend its declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial and residential building located at 192 Main Street, Norwich, Connecticut. Approved 12/05/19Link to Petition No. 1364

PETITION NO. 1365 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 1.2-megawatt fuel cell facility and associated equipment to be located at Connecticut College, 5 Reservoir Street, New London, Connecticut. Approved 5/9/19

PETITION NO. 1366 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a telecommunications facility on the roof of an existing commercial building located at 276 New Britain Avenue, Plainville, Connecticut.  Approved 5/9/19

PETITION NO. 1367 - CP Middletown Solar I, LLC and CP Middletown Solar II, LLC, petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.0-megawatt AC solar photovoltaic electric generating facility and a 0.986-megawatt solar photovoltaic electric generating facility on approximately 30 acres comprised of six abutting parcels located northeast of the intersection of Higby Road and Meriden Road (Route 66), west of Ballfall Road (Route 217) and south of Sisk Street in Middlefield and Middletown, Connecticut, and associated electrical interconnection.  Approved 05/23/19

PETITION NO. 1368 - Bloom Energy Corporation, as agent for the City of Milford, petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 900-kilowatt fuel cell facility and associated equipment to be located at the Beaverbrook Wastewater Treatment Plant, 75 Deerwood Avenue, Milford, Connecticut.   Approved 05/23/19

PETITION NO. 1369 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 440-kilowatt fuel cell facility and associated equipment to be located at the City of Bristol Water Pollution Control Facility, 75 Battisto Road, Bristol, Connecticut. Approved 06/06/19

PETITION NO. 1370 - The United Illuminating Company (UI) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for replacement of its existing No. 1720 Line Relay in order to comply with the Northeast Power Coordinating Council’s Implementation Plan on the ISO New England, Inc. Bulk Power System between Connecticut Light and Power Company d/b/a Eversource Energy’s Norwalk Substation in Norwalk, Connecticut and UI’s Hawthorne Substation located at 180 Hawthorne Drive, Fairfield, Connecticut and related substation improvements. Approved 06/06/19

PETITION NO. 1371 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 667 Line Rebuild Project consisting of the replacement and reconductoring of approximately 6.1 miles of its existing No. 667 69-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right-of-way between Falls Village Substation in Falls Village (Canaan) and Salisbury Substation in Salisbury, Connecticut, traversing Canaan, Sharon and Salisbury, and related substation and electric transmission line structure improvements. Approved 06/06/19

PETITION NO. 1372 – Derby Fuel Cell, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 14.0-megawatt fuel cell facility and associated equipment to be located at 200 Roosevelt Drive, Derby, Connecticut.  Approved 07/18/19

PETITION NO. 1373 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to an existing wireless telecommunications facility at the Simsbury Volunteer Fire Department located at 345 Bushy Hill Road, Simsbury, Connecticut. Approved 08/15/19

PETITION NO. 1374 – Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility and associated equipment to be located at Carla’s Pasta, 280 Nutmeg Road, South Windsor, Connecticut. Approved 08/15/19

PETITION NO. 1375 – Cellco Partnership d/b/a Verizon Wireless, T-Mobile Northeast, LLC and New Cingular Wireless PCS, LLC joint petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a temporary telecommunications facility and associated equipment located at 1052 Boston Post Road, Milford, Connecticut.  Approved 08/15/19

PETITION NO. 1376 – The Connecticut Light and Power Company d/b/a Eversource Energy (Eversource) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed electrical interconnection between its existing Scitico Substation located at 20 Bailey Road, Enfield, Connecticut and Nutmeg Solar, LLC’s 19.6 megawatt solar photovoltaic electric generating facility located generally south of Bailey Road and east of Route 191 (Broad Brook Road) in Enfield, Connecticut consisting of modifications to the Scitico Substation, relocation of the existing No. 1976 electric transmission line that terminates at Scitico Substation, the construction, operation and maintenance of a new approximately 330-foot 115-kilovolt (kV) underground transmission line, and related substation and electric transmission line structure improvements. Approved 09/12/19

PETITION NO. 1377   – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on an approximately 34-foot Eversource-owned replacement utility pole located outside of the public right of way adjacent to 195 Main Street, Norwalk, Connecticut.  Approved 08/15/19

PETITION NO. 1378 – Greenskies Renewable Energy, LLC (GRE)  CF Taugwonk, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 5.0-megawatt AC solar photovoltaic electric generating facility on approximately 16.5 acres located generally east of Taugwonk Road and Taugwonk Spur Road and north of Interstate 95 in Stonington, Connecticut and associated electrical interconnection. Approved 10/10/19 

PETITION NO. 1379  – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k,for the proposed installation of a wireless telecommunications facility on the roof of an existing building located at 1270 North High Street (a/k/a State Route 100), East Haven, Connecticut. Link to Petition No. 1096 Approved 10/24/19

PETITION NO. 1380  – LSE Delphinus, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.992-megawatt AC solar photovoltaic electric generating facility on approximately 9.86 acres located generally east of Powder Hill Road north of the intersection with Monroe Road and Abbe Road in Enfield, Connecticut and associated electrical interconnection.   Approved 11/21/19

PETITION NO. 1381  – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 600-kilowatt fuel cell facility and associated equipment to be located at the Hospital for Special Care, 2150 Corbin Avenue, New Britain, Connecticut. Approved 10/24/19

PETITION NO. 1382 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1355 Line Rebuild Project consisting of the replacement and reconductoring of approximately 1.38 miles of its existing No. 1355 115-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right-of-way between a location just east of the existing Schwab Junction off of Chimney Hill Road and Colony Substation off of Old Colony Road in Wallingford, Connecticut, and related substation and electric transmission line structure improvements. Approved 10/24/19 

PETITION NO. 1383 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 750-kilowatt fuel cell facility and associated equipment to be located at Charlotte Hungerford Hospital, 540 Litchfield Street, Torrington, Connecticut. Approved 10/24/19

PETITION NO. 1384 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of electric transmission line structures along approximately 18 miles of its existing No. 1505/1607 115-kilovolt (kV) double-circuit electric transmission line within existing Eversource electric transmission line right-of-way between the existing Tunnel Substation in Preston, the existing Fry Brook Substation in Plainfield and the existing Brooklyn Substation in Brooklyn, Connecticut, traversing Preston, Canterbury, Plainfield and Brooklyn, and related electric transmission structure improvements.Approved 11/21/19

PETITION NO. 1385 -Power Lines Solar LLC Cobb Road, LLC declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.95-megawatt AC solar photovoltaic electric generating facility on approximately 11.16 acres located at 20-1 Short Hills Road, Old Lyme, Connecticut and associated electrical interconnection. Approved 01/02/20

PETITION NO. 1386 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility at an existing Eversource-owned electric transmission line structure (#917) within an existing Eversource electric transmission line right-of-way located at 5 Tall Pines Drive, Weston, Connecticut. Approved 01/30/2020

PETITION NO. 1387 – Bloom Energy Corporation Generate C&I Warehouse, LLC Generate Colchester Fuel Cells, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a grid-side 10-megawatt (MW) fuel cell facility and associated equipment to be located at Eversource Energy’s existing Judd Brook electric distribution substation, 160 Old Amston Road, Colchester, Connecticut. Approved 01/02/20

PETITION NO. 1388  – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to an existing wireless telecommunications facility at the Old Lyme Volunteer Fire Department located at 189 Boston Post Road, Old Lyme, Connecticut. Approved 01/02/20

PETITION NO. 1389  – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on an approximately 34-foot Eversource-owned replacement utility pole located outside of the public right of way at the West Bank Shopping Center, 221 Post Road West, Westport, Connecticut. Approved 01/02/20

PETITION NO. 1390  – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility and associated equipment on the roof of an existing commercial building located at 951 Bank Street, New London, Connecticut. Approved 01/16/20

PETITION NO. 1391 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 550-kilowatt fuel cell facility and associated equipment to be located at the Altice USA (formerly Cablevision) building, 28 Cross Street, Norwalk, Connecticut. Approved 01/16/20

PETITION NO. 1392 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 300-kilowatt fuel cell facility and associated equipment to be located at the Town of Southington Water Treatment Plant, 999 Meriden Waterbury Turnpike, Southington, Connecticut. Approved 02/27/20

PETITION NO. 1393 – Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 440-kilowatt customer-side fuel cell facility and associated equipment to be located at Cherry Street Lofts, 375 Howard Avenue, Bridgeport, Connecticut. Approved 05/21/20

PETITION NO. 1394 – VFS, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 460-kilowatt customer-side fuel cell facility and associated equipment to be located at the Town of Montville Water Pollution Control Facility, 83 Pink Row, Montville (Uncasville), Connecticut. Approved 03/26/20

PETITION NO. 1395 – Windham Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of three 1.0-megawatt (MW) solar photovoltaic electric generating facilities located at 31 Benz Street, Ansonia, Connecticut. Rejected as Incomplete 04/17/20

PETITION NO. 1395A – Windham Solar LLC amended petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of one 1.0-megawatt (MW) and one 0.99 MW solar photovoltaic electric generating facilities located at 31 Benz Street, Ansonia, Connecticut. Denied with Prejudice 03/11/21 Link to Petition No. 1395

PETITION NO. 1395A – Windham Solar LLC amended petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of one 1.0-megawatt (MW) and one 0.99 MW solar photovoltaic electric generating facilities located at 31 Benz Street, Ansonia, Connecticut. Motion to Vacate, and in the Alternative, to Reconsider the Council Decision of March 12, 2021. Link to Petition No. 1395 Approved 06/17/21

PETITION NO. 1396 - NJR Clean Energy Ventures III Corporation (formerly CP East Hampton Solar I, LLC and CP East Hampton Solar II, LLC) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.0-megawatt AC solar photovoltaic electric generating facility and a 0.975-megawatt AC solar photovoltaic electric generating facility on an approximately 27 acre parcel located generally west of Skinner Street (Route 196) and south of Forest Street in East Hampton, Connecticut and associated electrical interconnection. Approved 05/21/20

PETITION NO. 1397 - Constitution Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 20-megawatt AC solar photovoltaic electric generating facility on approximately 149 acres comprised of four separate parcels located off of Cornell Road in Plainfield, Connecticut and associated electrical interconnection. Approved 07/16/20  Withdrawn 10/06/23

PETITION NO. 1398 - LSE Pictor, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility on an approximately 104 acre parcel located off of Platt Hill Road, Winchester, Connecticut and associated electrical interconnection. Denied without Prejudice 09/24/20

PETITION NO. 1398A - LSE Pictor, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility on an approximately 104 acre parcel located off of Platt Hill Road, Winchester, Connecticut and associated electrical interconnection.  Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).Approved 05/06/21 Link to Petition No. 1398

PETITION NO. 1399 – Iroquois Gas Transmission System, L.P. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and 16-50k, that modifications to its existing natural gas compressor stations located in the Towns of Brookfield and Milford, Connecticut (“Enhancement by Compression Project”) are under the exclusive jurisdiction of the Federal Energy Regulatory Commission.  Determination of FERC Jurisdiction 05/21/20

PETITION NO. 1400 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1150-kilowatt customer-side fuel cell facility and associated equipment to be located at Eastern Connecticut State University, 165 Windham Street, Windham, Connecticut. Approved 05/21/20

PETITION NO. 1401 
- Revity Energy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 12.25-megawatt AC solar photovoltaic electric generating facility on approximately 74.9 acres located at 424 Snake Meadow Road, Plainfield, Connecticut and 0 Valley Road, Sterling, Connecticut, and associated electrical interconnection to Eversource Energy’s Fry Brook Substation. Approved 07/16/20

PETITION NO. 1402 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 350-kilowatt customer-side fuel cell facility and associated equipment located at Western Connecticut State University, 7 University Boulevard, Danbury, Connecticut. Approved 05/21/20

PETITION NO. 1403 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 600-kilowatt customer-side fuel cell facility and associated equipment to be located at Southern Connecticut State University, North Campus, 201 Wintergreen Avenue, New Haven, Connecticut.  Approved 06/04/20

PETITION NO. 1404 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1350-kilowatt customer-side fuel cell facility and associated equipment to be located at Southern Connecticut State University, East Campus, 501 Crescent Street, New Haven, Connecticut.  Approved 06/04/20

PETITION NO. 1405 -  The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Horton Cove Circuit Separation Project consisting of a partial rebuild and separation of approximately 1 mile of its existing No. 100 69-kilovolt (kV) and Nos. 1410, 1280, and 1355 115-kV electric transmission line structures within existing Eversource electric transmission line right-of-way between a location east of Depot Road to a point east of Point Breeze Road, Montville, Connecticut, and related electric transmission line structure improvements. Approved 07/16/20

PETITION NO. 1406 -  Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a grid-side 9.66-megawatt fuel cell facility and associated equipment to be located at 600 Iranistan Avenue, Bridgeport, Connecticut, and associated electrical interconnection to the United Illuminating Company's existing Congress Street Substation. Denied without Prejudice 12/17/20

PETITION NO. 1406A Doosan Fuel Cell America, Inc. Charter Oak Borrower, LLC Declaratory Ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the construction, maintenance and operation of a grid-side 9.66-megawatt fuel cell facility and associated equipment to be located at 600 Iranistan Avenue, Bridgeport, Connecticut, and associated electrical interconnection to the United Illuminating Company's existing Congress Street Substation. Approved 10/07/21

PETITION  NO. 1407 -  DG Connecticut Solar III, LLC (formerly Torrington Solar One LLC and VCP, LLC d/b/a Verogy)  petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.975-megawatt AC solar photovoltaic electric generating facility on an approximately 66.4 acre parcel located generally south of East Pearl Road and east of Torringford Street (Route 183) in Torrington, Connecticut and associated electrical interconnection. Approved 08/13/20

PETITION NO. 1408 – FairWindCT, Inc., et al petition, pursuant to Connecticut General Statutes §4-176, for a declaratory ruling that: (a) the January 9, 2020 Development and Management Plan (D&M Plan) Modification submitted by BNE Energy, Inc. in Petition No. 983 conflicts with the Connecticut Siting Council’s (Council) June 2, 2011 final decision on Petition No. 983; (b) the Council did not have jurisdiction over the D&M Plan Modification; (c) the Council did not have statutory authority to approve the D&M Plan Modification; (d) the D&M Plan Modification violated due process rights; and (e) the D&M Plan Modification violates the Connecticut Environmental Protection Act. Denied 12/17/20


PETITION NO. 1409 
– New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on a new approximately 30-foot privately-owned light pole to be located at the western edge of the parking lot at 880 Wethersfield Avenue, Hartford, Connecticut. Approved 8/13/20

PETITION NO. 1410 - Greenskies Clean Energy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.0-megawatt-AC solar photovoltaic electric generating facility on two parcels at the Elmridge Golf Course located to the east and west of North Anguilla Road at the intersection with Elmridge Road, Stonington, Connecticut, and associated electrical interconnection. (Findings of Fact)  (Opinion)  (Decision and OrderApproved 02/11/21  Project Withdrawn 12/23/21

PETITION NO. 1411 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing commercial building located at 132 Greenwood Avenue, Bethel, Connecticut. Approved 08/13/20

PETITION NO. 1412 - LSE Phoenix, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99 megawatt AC solar photovoltaic generating facility on an approximately 23-acre parcel located at 100 Sand Road, North Canaan, Connecticut, and associated electrical connection. Approved 08/27/20


PETITION NO. 1413 
– New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on a new approximately 30-foot privately-owned light pole to be located at the southeast edge of the parking lot at 242 Hope Street, Stamford, Connecticut. Approved 08/13/20

PETITION NO. 1414 -  The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of an existing 25.5-foot wall-mounted steel pipe-mast with a new 34-foot wall-mounted galvanized steel pipe mast and associated radio communications equipment located at its East Windsor Area Work Center, 112 Prospect Hill Road, East Windsor, ConnecticutApproved 08/27/20

PETITION NO. 1415 - CF Boombridge LLC Greenskies Clean Energy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 5.0-megawatt-AC solar photovoltaic electric generating facility on approximately 27 acres comprised of 3 abutting parcels located generally northeast of the intersection of Boom Bridge Road and Anthony Road and south of Interstate 95 in North Stonington, Connecticut and associated electrical interconnection. Approved 10/08/20

PETITION NO. 1416 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 150-kilowatt customer-side fuel cell facility and associated equipment to be located at the Home Depot, 89 Interstate Park Drive, Southington, Connecticut. Approved 08/27/20

PETITION NO. 1417 – DG Connecticut Solar III, LLC Watertown Solar One, LLC and VCP, LLC d/b/a Verogy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.975 megawatt AC solar photovoltaic generating facility located at 669 Platt Road, Watertown, Connecticut, and associated electrical interconnection. Approved 12/03/20

PETITION NO. 1418 -   Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 150-kilowatt fuel cell facility and associated equipment to be located at the Home Depot, 1816 Meriden-Waterbury Turnpike, Southington, Connecticut. Approved 09/10/20

PETITION NO. 1419 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 150-kilowatt fuel cell facility and associated equipment to be located at the Home Depot, 114 Federal Road, Danbury, Connecticut. Approved 09/10/20

PETITION NO. 1420  - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 150-kilowatt fuel cell facility and associated equipment to be located at the Home Depot, 225 Berlin Turnpike, Berlin, Connecticut. Approved 10/08/20

PETITION NO. 1421 -  DG Connecticut Solar III, LLCBristol Solar One, LLC petition for a  declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.25 megawatt AC solar photovoltaic generating facility located at 399 Hill Street, Bristol, Connecticut, and associated electrical interconnection.  Approved 11/05/20

PETITION NO. 1422 - Greenskies Clean Energy, LLC petition for a CF Mulnite LLC Declaratory Ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.99-megawatt AC solar photovoltaic electric generating facility to be located at Mulnite Farms, Inc. off Barber Hill Road west of the intersection with Rockville Road, East Windsor, Connecticut and associated electrical interconnection. (Findings of Fact)  (Opinion)  (Decision and Order)  Approved 04/22/21

PETITION NO. 1422A
- CF Mulnite LLC Declaratory Ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the construction, maintenance and operation of a 4.99-megawatt AC solar photovoltaic electric generating facility to be located at Mulnite Farms, Inc. off Barber Hill Road west of the intersection with Rockville Road, East Windsor, Connecticut and associated electrical interconnection. Link to Petition No. 1422 Approved 02/29/24

PETITION NO. 1423 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 150-kilowatt fuel cell facility and associated equipment to be located at the Home Depot, 90 Monroe Turnpike, Trumbull, Connecticut. Approved 10/08/20

PETITION NO. 1424 - Southington Solar One, LLC  DG Connecticut Solar III, LLC  declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.725-megawatt AC solar photovoltaic electric generating facility located at 1012 East Street, Southington, Connecticut, and associated electrical interconnection.  Approved 05/20/21

PETITION NO. 1425 – Gaylord Mountain Solar Project 2019, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.9-megawatt AC solar photovoltaic electric generating facility located at 360 Gaylord Mountain Road in Hamden, Connecticut, and associated electrical interconnection.  (Findings of Fact)  (Opinion)  (Decision and Order)  Denied 03/25/21

PETITION NO. 1426  - East Windsor Solar One, LLC petition for a DG Connecticut Solar III, LLC declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.9-megawatt AC solar photovoltaic electric generating facility located west of the Ellington town boundary at 341 East Road, East Windsor, Connecticut and associated electrical interconnection.(Findings of Fact)     (Opinion)     (Decision and Order)   Approved 5/6/21

PETITION NO. 1427 – TRITEC Americas, LLC SunJet Energy, LLC notice of election to waive exclusion from Connecticut Siting Council jurisdiction, pursuant to Connecticut General Statutes §16-50k(e), and petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.0-megawatt or less AC solar photovoltaic electric generating facility and associated electrical interconnection located at 0 Matthews Street and 125 Hill Street, Bristol, Connecticut.  Approved 01/14/21

PETITION NO. 1428 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of an omni-directional antenna on an existing approximately 50-foot wood pole and associated radio communications equipment located at Eversource-owned Branford 11J substation property, 272 East Main Street, Branford, Connecticut. Approved 10/22/20

PETITION NO. 1429 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1768 Line Lattice Tower Replacement Project consisting of the reconductoring and replacement of electric transmission line structures along approximately 7 miles of its existing No. 1768 115-kilovolt (kV) double-circuit electric transmission line within existing Eversource electric transmission line right-of-way between East Granby Junction in East Granby and the Suffield, Connecticut/Agawam, Massachusetts border, and related electric transmission line structure improvements. Approved 12/17/20

PETITION NO. 1430 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing rooftop telecommunications facility located at 54 Meadow Street, New Haven, Connecticut. Approved 12/03/20

PETITION NO. 1431 – TRITEC Americas, LLC SunJet Energy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility and associated electrical interconnection located at 0, 78 and 84 Thomson Road in Bethlehem, Connecticut.  Approved 04/08/21

PETITION NO. 1432 -  New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on a new approximately 30-foot privately-owned light pole to be located at the Goshen Fair Grounds, 116 Old Middle Street, Goshen, Connecticut. Approved 11/05/20

PETITION NO. 1433 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1191 Line Rebuild Project, consisting of the replacement and reconductoring of electric transmission line structures along approximately 10 miles of its existing No. 1191 115-kilovolt (kV) single-circuit electric transmission line within existing Eversource electric transmission line right-of-way between the existing Frost Bridge Substation in Watertown and the existing Campville Substation in Harwinton, Connecticut, traversing Watertown, Thomaston, Litchfield and Harwinton, Connecticut, and related electric transmission line structure improvements.  Approved 01/28/21

PETITION NO. 1434 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a new 63-foot steel pole and associated radio communications equipment located at the Eversource-owned Old Mountain Road Substation, 29 Old Mountain Road, Farmington, Connecticut. Approved 01/14/21

PETITION NO. 1435 -  The Connecticut Department of Emergency Services and Public Protection (DESPP) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and extension of an existing telecommunications facility located at property owned by the Connecticut Department of Transportation off Leetes Island Road, Branford, Connecticut.  Approved 01/28/21

PETITION NO. 1436 - Groton Utilities petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and reconductoring of electric transmission line structures along approximately 1.7 miles of its existing 115-kilovolt (kV)/69-kV 1410/400 double-circuit electric transmission line and 115-kV 1280 single-circuit electric transmission line within existing Groton Utilities electric transmission line right-of-way between Groton/Ledyard town line and Buddington Substation located north of Gold Star Highway in Groton, Connecticut, and related transmission line and substation improvements.  Approved 02/25/21

PETITION NO. 1437 - Burlington Solar One, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.5-megawatt AC solar photovoltaic electric generating facility and associated electrical interconnection located at Lot 33, Prospect Street, Burlington, Connecticut.  Withdrawn 01/22/21  Refiled as Application for Certificate - See Docket No. 497

PETITION NO. 1438 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation a customer-side 500-kilowatt AC fuel cell facility and associated equipment to be located at 69 (a/k/a 65) Woodland Street and a customer-side 500-kilowatt AC fuel cell facility and associated equipment to be located off of Drake Hill Road, both located at the Dyno Nobel campus in Simsbury, Connecticut. Approved 03/25/21

PETITION NO. 1439 -The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a new 45-foot steel pole and associated radio communications equipment located at the Eversource-owned Canton Substation, 13 Morgan Road, Canton, Connecticut.  Approved 03/25/21

PETITION NO. 1440 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility and associated equipment on an extension of the support structure above the top of an existing billboard located on a commercial property at 115 Peat Meadow Road, New Haven, Connecticut. Approved 5/6/21

PETITION NO. 1441 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 1,750-kilowatt fuel cell facility and associated equipment to be located at Yale New Haven/Lawrence & Memorial Hospital, 412 Ocean Avenue, New London, Connecticut. Approved 5/6/21

PETITION NO. 1442 - SR Litchfield, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 19.8-megawatt AC solar photovoltaic electric generating facility on 6 contiguous parcels located both east and west of Wilson Road south of the intersection with Litchfield Town Farm Road in Litchfield, Connecticut, and both east and west of Rossi Road, south of the intersection with Highland Avenue in Torrington, Connecticut, and associated electrical interconnection. Approved 9/23/21

PETITION NO. 1443  - SR North Stonington, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 9.9-megawatt AC solar photovoltaic electric generating facility on five parcels located north and south of Providence New London Turnpike (State Route 184), west of Boombridge Road and north of Interstate 95 in North Stonington, Connecticut, and associated electrical interconnection. Voted on 9/9/21

PETITION NO. 1443A - SR North Stonington, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 9.9-megawatt AC solar photovoltaic electric generating facility on five parcels located north and south of Providence New London Turnpike (State Route 184), west of Boombridge Road and north of Interstate 95 in North Stonington, Connecticut, and associated electrical interconnection. Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). (Findings of Fact)  (Opinion)  (Decision and Order Approved 05/12/22

PETITION NO. 1444 - CP NB Solar I, LLC and CP NB Solar II, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1-megawatt AC solar photovoltaic electric generating facility and a 0.97-megawatt AC solar photovoltaic electric generating facility located at 127 Forest Road in North Branford, Connecticut, and associated electrical interconnection.  Approved 06/03/21

PETITION NO. 1445 -  The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1588 Line Rebuild Project, consisting of the replacement and reconductoring of electric transmission line structures along approximately 2.65 miles of its existing 115-kilovolt (kV) electric transmission line within existing Eversource transmission line right-of-way (ROW) that extends from Wallingford Electric’s Colony Substation, located at 15 Old Colony Road, Wallingford and Wallingford Electric’s North Wallingford Substation, located at 130 Thorpe Avenue, Wallingford, Connecticut, and related electric transmission line structure improvements. Approved 06/17/21

PETITION NO. 1446 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on a new approximately 34-foot privately-owned pole to be located in the northwest corner of the parking lot at 53 Ella T. Grasso Turnpike, Windsor Locks, Connecticut.  Approved 05/20/21

PETITION NO. 1447 -  New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on a new approximately 25-foot privately-owned light pole to be located at the northeast edge of the parking lot at 11 Lake Avenue Extension, Danbury, Connecticut.  Approved 05/20/21

PETITION NO. 1448 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to its existing Card Substation located at 181 Card Street, Lebanon, Connecticut. Approved 06/03/21

PETITION NO. 1449 -  New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on a new approximately 34-foot privately-owned wood pole to be located at the Woodstock Fair Grounds, 39 North Gate Road, Woodstock, Connecticut.  Approved 05/20/21

PETITION NO. 1450 - ClearCell Power, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the construction, maintenance, and operation of a customer-side 460-kilowatt fuel cell facility and associated equipment to be located at the Best Western Hotel, 490 Saw Mill Road, West Haven, Connecticut. Approved 06/03/21

PETITION NO. 1451 -  C-Tec Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.8-megawatt AC solar photovoltaic electric generating facility and a 2.2-megawatt AC solar photovoltaic electric generating facility located at 277 Sadds Mill Road, Ellington, Connecticut, and associated electrical interconnection. Approved 07/15/21

PETITION NO. 1452 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on a new approximately 38-foot 6-inch Eversource-owned utility pole that is not used principally for electric distribution service to be located in the public right-of-way adjacent to 36 Drinkwater Place, Greenwich, Connecticut.  Approved 06/17/21

PETITION NO. 1453 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to its existing Killingly Substation located at 257 Tracy Road in Killingly, Connecticut. Approved 7/29/21

PETITION NO. 1454 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to its existing Mansfield Substation located at 140 North Eagleville Road, Mansfield, Connecticut and related electric transmission line structure improvements. Approved 7/29/21

PETITION NO. 1455 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to its existing Mystic Substation located at 148 Greenmanville Avenue, Stonington, Connecticut and related electric transmission line structure improvements. Approved 7/29/21

PETITION NO. 1456- The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Card to Willimantic Upgrade Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 0.77 mile of its existing No. 1210 115-kilovolt (kV) line and approximately 0.81 mile of its existing No. 1220 115-kV line within existing Eversource electric transmission line right-of-way between Card Substation in Lebanon and Willimantic Substation in Windham, Connecticut, and related electric transmission line and substation improvements.  Approved 9/09/21

PETITION NO. 1457- The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 690 Line Rebuild Project consisting of: a) replacement and reconductoring of approximately 1.6 miles of its existing No. 690 69-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right-of-way between Salisbury Substation in Salisbury and Central Hudson Gas and Electric Corporation's electric transmission system at the Connecticut/New York state line in Sharon, Connecticut; (b) installation of temporary backup electric generation at Falls Village Substation in Canaan and Salisbury Substation in Salisbury, Connecticut; and (c) related substation and electric transmission line structure improvements.  Approved 9/23/21

PETITION NO. 1458– Homestead Fuel Cell 1, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a grid-side 8.4-megawatt fuel cell facility located at 441 Homestead Avenue, Hartford, Connecticut, and associated electrical interconnection to Eversource Energy’s existing Northwest Hartford Substation.  Approved 12/16/21  Withdrawn 01/03/24

PETITION NO. 1459- The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to its existing Shunock Substation located at 25 Pendleton Hill Road, North Stonington, Connecticut and related electric transmission line structure improvements.  Approved 10/07/21

PETITION NO. 1460– Greenskies Clean Energy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.0-megawatt AC solar photovoltaic electric generating facility located east of the Cornwall town boundary at 129 Bartholomew Hill Road, Goshen, Connecticut and associated electrical interconnection. Approved 10/21/21

PETITION NO. 1461SBA Communications Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and extension of an existing telecommunications facility located at 130 Welles Road, Groton, Connecticut.  Approved 11/18/21

PETITION NO. 1462 – Distributed Solar Operations, LLC and IKEA Property, Inc. notice of election to waive exclusion from Connecticut Siting Council jurisdiction, pursuant to Connecticut General Statutes §16-50k(e), and petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 0.90-megawatt AC solar photovoltaic electric generating facility located at IKEA, 450 Sargent Drive, New Haven, Connecticut and associated electrical interconnection.  Approved 11/18/21

PETITION NO. 1463 – CF Mulnite LLC CF Mulnite Miller LLC Greenskies Clean Energy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.0-megawatt (MW) AC solar photovoltaic electric generating facility located at a Mulnite Farms, Inc. parcel off Wapping Road, and a 4.0 MW AC solar photovoltaic electric generating facility located at a Mulnite Farms, Inc. parcel off Miller Road, East Windsor, Connecticut, and associated electrical interconnection. Approved 1/13/22

PETITION NO. 1463A
– CF Mulnite, LLC Declaratory Ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the construction, maintenance and operation of a 1.0- megawatt (MW) AC solar photovoltaic electric generating facility located at a Mulnite Farms, Inc. parcel off Wapping Road, and a 4.0 MW AC solar photovoltaic electric generating facility located at a Mulnite Farms, Inc. parcel off Miller Road, East Windsor, Connecticut, and associated electrical interconnection. Link to Petition No. 1463 Approved 02/29/24

PETITION NO. 1464 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Rockville Upgrade Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 1.2 miles of its existing No. 1606 and No. 1724 115-kilovolt transmission lines within existing Eversource electric transmission line right-of-way between Rockville Junction and Rockville Substation in Vernon, Connecticut, and related electric transmission line and substation improvements.   Approved 11/18/21

PETITION NO. 1465 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a wireless telecommunications facility located at 499 Mile Lane, Middletown, Connecticut.  Refiled as an Application - See Docket No. 506

PETITION NO. 1466 – CF Orange Old Tavern LLC Greenskies Clean Energy LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 2.5-megawatt AC solar photovoltaic electric generating facility located at Treat Farm, 361 Old Tavern Road, Orange, Connecticut, and associated electrical interconnection. Approved 1/13/22

PETITION NO. 1467 – Barrett Outdoor Communications, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed relocation of existing non-tower antenna arrays from a non-jurisdictional billboard located at 28 Sidney Street to a new telecommunications facility proposed to be constructed, maintained and operated at 200 East Main Street, Rear, Stratford, Connecticut.  Denied 02/24/22  (See Docket No. 511)

PETITION NO. 1468 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Montville to Horton Cove Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 0.6 mile of its existing Nos. 100 69-kilovolt (kV) and No. 1410 115-kV electric transmission lines within existing Eversource electric transmission line right-of-way between Horton Cove and Montville Substation in Montville, Connecticut, and related electric transmission line and substation improvements. Approved 01/27/22

PETITION NO. 1469– LSE Indus, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility located at 81 East Main Street, North Canaan, Connecticut and associated electrical interconnection. Approved 01/27/22

PETITION NO. 1470 – Cellco Partnership d/b/a Verizon Wireless, New Cingular Wireless PCS, LLC and T-Mobile Northeast, LLC joint petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a temporary telecommunications facility and associated equipment located at Sacred Heart University, 5151 Park Avenue, Fairfield, Connecticut. Approved 12/16/21

PETITION NO. 1471 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed extension and modification of an existing telecommunications facility located at 343 Daleville Road, Willington, Connecticut. Approved 02/10/22

PETITION NO. 1472 - Distributed Solar Projects, LLC  Dynamic Energy Solutions, LLC as agent for Stag Industrial Holdings, LLC petition for a  declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.5 megawatt AC solar photovoltaic electric generating facility located at 40 Pepes Farm Road, Milford, Connecticut, and associated electrical interconnection.  Approved 01/27/22

PETITION NO. 1473 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 311 Old Gate Lane, Milford, Connecticut.  Approved 2/24/22

PETITION NO. 1474- T-Mobile Northeast, LLC (T-Mobile) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 52 New Britain Avenue, Rocky Hill, Connecticut.  Approved 02/10/22

PETITION NO. 1475 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Eastern Connecticut Reliability Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 2.1 miles of its existing Nos. 100 and 400 69-kilovolt (kV) and Nos. 1410 and 1280 115-kV electric transmission lines within existing Eversource electric transmission line right-of-way between Montville Junction, Montville and Ledyard Junction, Ledyard, Connecticut, and related electric transmission line and substation improvements. Approved 02/24/22

PETITION NO. 1476 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed extension and modifications to an existing telecommunications facility located at 2627 Day Hill Road, Bloomfield, Connecticut.  Approved 03/10/22

PETITION NO. 1477 – Dish Wireless LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 441 Homestead Avenue, Hartford, Connecticut. Approved 4/21/22

PETITION NO. 1478– T-Mobile Northeast, LLC LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 344 Firetown Road, Simsbury, Connecticut. Approved 02/24/22

PETITION NO. 1479 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 1.5-megawatt fuel cell facility and associated equipment to be located at the NBC Sports Group building, 1 Blachley Road, Stamford, Connecticut Approved 03/10/22

PETITION NO. 1480 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on a new approximately 50-foot Eversource-owned utility pole that is not used principally for electric distribution service to be located in the public right-of-way adjacent to 32 Sasco Creek Road, Westport, Connecticut. Approved 02/24/22

PETITION NO. 1481 - T-Mobile Northeast, LLC (T-Mobile) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 419 Broad Street, Windsor, Connecticut.  Approved 03/10/22

PETITION NO. 1482 Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 700-kilowatt fuel cell facility and associated equipment to be located at Tully Health Center, 32 Strawberry Hill Court, Stamford, Connecticut.  Approved 03/24/22

PETITION NO. 1483 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Dooley Substation to Scoville Rock Substation and Middletown Substation Structure Replacement Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 9 miles of its existing Nos. 387, 362, and 3041 115-kV electric transmission lines within existing Eversource electric transmission line right-of-way in Middletown, Connecticut, and related electric transmission line and substation improvements.  Approved 05/12/22

PETITION NO. 1484 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to its existing Gales Ferry Substation located at 301 Whalehead Road, Ledyard, Connecticut, and related electric transmission line structure improvements. Approved 05/12/22

PETITION NO. 1485 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 2-megawatt fuel cell facility and associated equipment to be located at Stamford Hospital, 1 Hospital Plaza, Stamford, Connecticut.   Approved 04/07/22

PETITION NO. 1486– The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 400/500 Lines Rebuild Project consisting of the upgrade of the existing No. 400 69-kilovolt (kV) electric transmission line to 115-kV and the replacement and reconductoring of electric transmission line structures along 8.6 miles of the existing No. 400 electric transmission line within existing Eversource electric transmission line right-of-way between Ledyard Junction in Ledyard and Tunnel Substation in Preston; and the replacement and reconductoring of electric transmission line structures along approximately 4.9 miles of the existing No. 500 69-kV electric transmission line within existing Eversource electric transmission line right-of-way between Hallville Junction in Ledyard and Tunnel Substation in Preston Connecticut, and related electric transmission line and substation improvements. Approved 05/12/22

PETITION NO. 1487 – TRITEC Americas, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.97 megawatt AC solar photovoltaic electric generating facility located at 254 Putnam Road, Pomfret, Connecticut, and associated electrical interconnection. Approved 06/09/22 

PETITION NO. 1488- T-Mobile Northeast, LLC (T-Mobile) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility on electric transmission line structure No. 3147, owned by Eversource Energy within an existing Eversource Energy electric transmission line right-of-way located at 140 Duncaster Road, Bloomfield, Connecticut. Approved 05/12/22

PETITION NO. 1489 Palm Energy, LLC NRG Curtailment Solutions, Inc.  declaratory ruling, pursuant to Connecticut General Statutes §4-176, §16-50i and §16-50k, that the installation of four 2.46-megawatt natural gas-fired emergency generating devices and associated equipment inside two existing buildings located on the ESPN Campus at 935 Middle Street, Bristol, Connecticut are exempt from Connecticut Siting Council jurisdiction and would not have a substantial adverse environmental effect. Approved 04/22/22

PETITION NO. 1490– New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing commercial building located at 49 Leavenworth Street, Waterbury, Connecticut. Withdrawn 03/18/22

PETITION NO. 1491– Dish Wireless LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 340 Bloomfield Avenue, Windsor, Connecticut. Approved 05/12/22

PETITION NO. 1492 – CT NSB ProjectCo LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility located at 486 Fitch Hill Road, Montville (Uncasville), Connecticut, and associated electrical interconnection.  Approved 06/23/22  

PETITION NO. 1493- Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 1.5-megawatt fuel cell facility and associated equipment to be located at Saint Mary’s Hospital, 56 Franklin Street, Waterbury, Connecticut. Approved 05/12/22

PETITION NO. 1494– Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 38.5-foot wood pole and associated equipment at Durham Fairgrounds, 24 Townhouse Road, Durham, Connecticut.  Approved 04/21/22

PETITION NO. 1495– New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 43-foot Connecticut Department of Transportation-owned utility pole that is not used principally for electric distribution service and associated equipment to be located in the Metro-North Railroad right-of-way adjacent to 97 Hamilton Avenue, Stamford, Connecticut. Approved 05/12/22

PETITION NO. 1496 – Dish Wireless LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 52 New Britain Avenue, Rocky Hill, Connecticut. Approved 05/12/22

PETITION NO. 1497 -Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 2-megawatt fuel cell facility and associated equipment to be located at Bridgeport Hospital, 267 Grant Street, Bridgeport, Connecticut.  Approved 05/12/22

PETITION NO. 1497A – Bloom Energy Corporation amended petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 2-megawatt fuel cell facility and associated equipment to be located at Bridgeport Hospital, 267 Grant Street, Bridgeport, Connecticut. Link to Petition No. 1497  Approved 08/17/23

PETITION NO. 1498 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 2-megawatt fuel cell facility and associated equipment to be located at Americold Logistics LLC, 24 Northwest Drive, Plainville, Connecticut.  Approved 05/26/22

PETITION NO. 1499 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 43-foot AT&T-owned utility pole that is not used principally for electric distribution service and associated equipment to be located in the Metro-North Railroad right-of-way adjacent to 55 Henry Street, Greenwich, Connecticut.  Withdrawn 03/28/22