Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Due to a mandatory IT upgrade on January 10, 2026, any documents posted to the Council’s website between December 22, 2025 and January 10, 2026 must be completely reposted to the respective webpages. During this transition, upon request, the Council can provide electronic copies of any document that was posted to the website prior to the effective date of the upgrade. We appreciate your patience.

PETITION NO. 1376 – The Connecticut Light and Power Company d/b/a Eversource Energy (Eversource) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed electrical interconnection between its existing Scitico Substation located at 20 Bailey Road, Enfield, Connecticut and Nutmeg Solar, LLC’s 19.6 megawatt solar photovoltaic electric generating facility located generally south of Bailey Road and east of Route 191 (Broad Brook Road) in Enfield, Connecticut consisting of modifications to the Scitico Substation, relocation of the existing No. 1976 electric transmission line that terminates at Scitico Substation, the construction, operation and maintenance of a new approximately 330-foot 115-kilovolt (kV) underground transmission line, and related substation and electric transmission line structure improvements.

 

PETITION
  
PROCEDURAL CORRESPONDENCE
SCHEDULE
SERVICE LIST
DECISION