PETITION NO. 1240 - Wallingford Energy, LLC, on behalf of the Town of Wallingford Electric Division, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the town’s existing Wallingford 13M substation located at 195 East Street in Wallingford and modifications to several existing town-owned 115-kV electric transmission lines including the reconductoring and extension of the 1305 line, the circuit-separation of the 1630 and 1640 lines and the potential re-routing of the 1208 line located in Wallingford, Connecticut.
PROCEDURAL CORRESPONDENCE
Petitioner's Responses to Interrogatories, 07/25/2016
The Department of Transportation Comments (no comments), 07/19/16
DECISION
Decision Letter and Staff Report 08/05/16
Minor Changes to Routing & Structures and Notice of Start of Construction, 10/20/2016
Petition Revision Decision Letter, 10/25/2016
Revision Condition Compliance, 11/22/16
Council Decision on Minor Relocation of Structure 1640-2, 11/25/16
Letter from Wallingford Energy to the Council re construction, 12/20/16
Minor Changes to Transmission Structure, 01/19/2017