PETITION NO. 1201 - Eversource Energy petition
for a declaratory ruling that no Certificate of
Environmental Compatibility and Public Need is required for the proposed
reconductoring of approximately 1.75 miles of its existing No. 1810 115-kV
transmission line from Forestville Junction in Southington to Lake Avenue
Junction in Bristol, rebuilding and reconductoring of approximately 1.85 miles
of its existing Nos. 1800 and 1810 115-kV transmission lines from Southington
Substation in Southington to Structure No. 1815 in Southington, reinforcement of
an existing transmission structure at Southington Substation in Southington, and
related substation and transmission line structure improvements.