PETITION NO. 1384 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of electric transmission line structures along approximately 18 miles of its existing No. 1505/1607 115-kilovolt (kV) double-circuit electric transmission line within existing Eversource electric transmission line right-of-way between the existing Tunnel Substation in Preston, the existing Fry Brook Substation in Plainfield and the existing Brooklyn Substation in Brooklyn, Connecticut, traversing Preston, Canterbury, Plainfield and Brooklyn, and related electric transmission structure improvements.
PETITION
PROCEDURAL CORRESPONDENCE
DECISION