Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Due to a mandatory IT upgrade on January 10, 2026, any documents posted to the Council’s website between December 22, 2025 and January 10, 2026 must be completely reposted to the respective webpages. During this transition, upon request, the Council can provide electronic copies of any document that was posted to the website prior to the effective date of the upgrade. We appreciate your patience.

PETITION NO. 1344 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of approximately 11 miles of its existing No. 1342 115-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right of way between the existing Green Hill Substation located at 775 Green Hill Road in Madison and the existing Bokum Substation located at 49 Bokum Road in Old Saybrook, Connecticut, traversing Madison, Killingworth, Clinton, Westbrook, Essex and Old Saybrook, and related electric transmission line structure improvements.

 

Petition Filing, (received 5/10/18)

 

PROCEDURAL CORRESPONDENCE
DECISION