PETITION NO. 1287 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Redding to Wilton Project that includes structure and conductor replacements of approximately 5 miles of its existing No. 1470 115-kilovolt electric transmission line within existing Eversource electric transmission line right of way between the existing Peaceable Substation located at 520 Peaceable Street in Redding, Connecticut and the existing Wilton Substation located at 53 Old Danbury Road in Wilton, Connecticut, and related substation and transmission line structure improvements.
PROCEDURAL CORRESPONDENCE
DECISION
Council Decision on Minor Project Change, 9/18/19
Construction Completion Letter, 08/28/20
Semi-Annual Status Report (multiple projects), 02/08/21
Construction Completion Letter, 08/28/20
Semi-Annual Status Report (multiple projects), 02/08/21