PETITION NO. 1 - Connecticut Light and Power Company petition for reconductoring of a section of existing 115-kV transmission line in Norwich. Decision Letter  Staff Report.  Approved 9/8/72

PETITION NO.  2 - Hartford Electric Light Company petition for replacement of structures on a section of the existing Manchester -South Meadow 115-kV transmission line extending approximately 1.5 miles from the vicinity of the Manchester - East Hartford town line westerly to Route 15. Decision Letter  Staff Report.  Approved 10/13/72

PETITION NO.  3 - The Connecticut Light and Power Company petition for reconductoring a portion of an existing 115-kV line between Trumbull Junction and Norwalk Substation and a 115-kV line on same right of way between Old Town Substation and Norwalk Substation and crossing facilities of Penn Central Transportation Company, the Southern New England Telephone Company, and the United Illuminating Company in Trumbull, Bridgeport, Fairfield, Easton, Weston, Wilton, and Norwalk. Approved 10/13/72

PETITION NO.  4 - The City of Groton petition for the construction of 2.94 miles of a 115 kV transmission line and 115/34 kV receiving substation Groton. Withdrawn

PETITION NO.  5 - The Connecticut Yankee Atomic Power Company petition for changes to various systems involved in the collection and treatment of radioactive wastes at the Connecticut Yankee Nuclear Power Station in Haddam.  Staff Report.  Approved 10/13/72

PETITION NO.  6 - United Illuminating Company petition for replacing double circuit, steel lattice structures with double circuit, steel monopole structures, reconductoring, and temporarily rerouting sections of an existing 115-kV transmission line from Derby Substation, Roosevelt Drive, Derby to a Connecticut Light and Power Company tap, off Route 108, Shelton. Tabled 12/4/72 Denied 1/26/73

PETITION NO.  7 - Connecticut Light and Power Company petition for reconductoring and replacing the structures of two existing 69-kV transmission lines in Lebanon to Mansfield Substation off North Eagleville Road in Mansfield.  Staff Report.  Approved 12/15/72

PETITION NO.  8 - Northeast Utilities Service Company petition for reconductoring two existing 115-kV transmission line circuits extending approximately 4.9 miles from Berlin Substation off Beckley Road, Berlin to Reservoir Road Junction off Reservoir Road, New Britain.  Approved 12/11/72

PETITION NO.  9 - Northeast Utilities Service Company petition for relocating and replacing single circuit, double wood pole structures with single circuit, single load monopole structures along sections of an existing 69-kV transmission line near Gray’s Bridge Road, Brookfield and between Route 133 and Silvermine Road, in Brookfield.  Staff Report.  Approved 12/1/72

PETITION NO.  10 - Connecticut Light and Power Company petition for the changes to the existing 69-kV line from Rocky River hydroelectric plant to the Bulls Bridge hydro electric plant in Brookfield.  Staff Report.  Approved 12/1/72

PETITION NO.  11 - Connecticut Light and Power Company petition for reinsulating existing sections of 69-kV line from Brookfield Junction and from West Brookfield Junction northerly to the Rocky River hydro plant in New Milford.  Staff Report.  Approved 12/1/72

PETITION NO. 12 - Connecticut Light and Power Company petition for reconductoring and replacing the structures on the two existing 69-kV circuits from the Carmel Hill Substation in Woodbury westerly to the Rocky River Substation in New Milford. (Washington)  Staff Report.  Approved 1/26/73

PETITION NO.  13 - Algonquin Gas Transmission Company petition for the construction of an underground natural gas transmission pipeline in Wallingford and New Haven. Approved 4/27/73

PETITION NO.  14 - Northeast Utilities Service Company petition for the replacement of double circuit wood pole structures with double circuit steel monopole structures and the reconductoring of two 115-kV circuits extending approximately 6.16 miles from Southington Substation, Southington to Forestville Substation, Bristol, and about 0.8 miles from Forestville Junction, Southington to Bristol Substation, Bristol.  Staff Report. Approved 2/23/73

PETITION NO.  15 - Connecticut Light and Power Company, Hartford Electric Light Company and Western Massachusetts Electric Company petition for a reinforced concrete building at Millstone Nuclear Power Station, Unit 1, in Waterford.  Staff Report.  Approved 4/27/73

PETITION NO.  16 - Hartford Electric Light Company petition for reconductoring one circuit, removing the second circuit and replacing supporting structures on the 115-kV transmission line from Berlin Substation northeasterly to Rocky Hill Substation in Rocky Hill and Berlin.  Staff Report.  Approved 11/27/73

PETITION NO.  17 - Hartford Electric Light Company petition to construct an underground 115-kV transmission line between South Meadow generating station and a proposed new substation at New Park Avenue and Kane Street in Hartford. Approved 6/24/73

PETITION NO.  18 - Connecticut Light and Power Company petition for the construction of a double-circuit 115-kV underground transmission line from the Triangle Substation, on Triangle Street, northerly and westerly to the proposed Middle River Substation, on Middle River Road in Danbury.  Staff Report.  Approved 7/27/73

PETITION NO.  19 - Northeast Utilities Service Company petition for replacing existing steel lattice structures with steel monopole structures and reconductoring two existing 115-kV circuits extending about 5.3 miles from North Bloomfield Substation, Duncaster Road, to Bloomfield Tap Point near Blue Hills Avenue, in Bloomfield. Approved 9/14/73

PETITION NO.  20 - Connecticut Light and Power Company petition for the installation of a 115-kV circuit on an existing double circuit single steel pole line from the Massachusetts -Connecticut state line to Scitico Substation, in Enfield.  Staff Report.  Approved 10/26/73

PETITION NO.  21 - City of Groton, Department of Utilities petition for the construction of a single circuit 115-kV transmission line  from the Groton-Ledyard town line to Buddington Substation, in Groton.  Staff Report.  Approved 11/30/73

PETITION NO.  22 - Connecticut Light and Power Company petition for the construction of a single circuit 115-kV transmission line from the Groton town line to Whipple Junction substation in Ledyard.  Staff Report.  Approved 11/30/73

PETITION NO.  23 - Hartford Electric Light Company petition for the construction of a single-circuit 115-kV underground transmission line, in Hartford. Approved 11/30/73

PETITION NO.  24 -Connecticut Light and Power Company petition for proposed route changes for an overhead transmission line in the vicinity of Toby Hill Rd and Route 153, in Westbrook. Denied-Application to modify Cert. required. 12/13/73

PETITION NO.  25 - Connecticut Light and Power Company petition for proposed route changes for an overhead transmission line in the vicinity of Jefferson Park Rd in Madison. Denied-Application to modify Cert. reqired. 12/13/73

PETITION NO.  26 - The Hartford Electric Light Company petition for the construction of a 115-kV line crossing facilities of the Connecticut Light and Power Company, Penn Central Transportation Co., and the Southern New England Telephone Company in Canaan, Goshen, Cornwall, and Torrington.  Staff Report.  Approved 3/29/74

PETITION NO.  27 - The Connecticut Light and Power Company petition for construction of a 115-kV line from Frost Bridge Substation to Bunker Hill Substation and crossing facilities of the Penn Central Transportation Company and the Southern New England Telephone Company in Watertown and Waterbury.  Staff Report.  Approved 5/19/74

PETITION NO.  28 - The Hartford Electric Light Company petition for reconductoring and replacing supporting structures in the 115-kV transmission line from Rocky Hill Substation in Rocky Hill to an existing tower north of Hartford Avenue in Wethersfield.  Staff Report.  Approved 6/14/74

PETITION NO.  29 - The Hartford Electric Light Company petition for reconductoring and replacing the structures on the easterly of two existing 115-kV circuits from the Berlin Substation in the Town of Berlin to Newington Substation in the Town of Newington. Approved 10/18/74

PETITION NO.  30 - Northeast Utilities Service Company petition for the purchase of available, privately-owned property section of a proposed transmission line in the Amston section of Hebron. Denied 1/10/75

PETITION NO.  31 - Northeast Utilities Service Company petition for a 115-kV transmission line through the Town of Norwalk, Darien and Stamford.   Staff Report.  Approved 11/10/75 Rev. Approv. 7/13/77

PETITION NO.  32 - Northeast Utilities Service Company petition for replacing existing wood pole tap structures with steel lattice structures to reconnect existing 115-kV transmission line conductors and to temporarily relocate a portion of the line into wood pole structures at Cook Hill Junction in Cheshire.  Staff Report.  Approved 3/11/75

PETITION NO.  33 - Northeast Utilities Service Company petition for the removal of two existing transmission line steel structures, construction of two new steel monopole transmission structures, and installation of a temporary wood pole double circuit extending about 0.4 miles in length along a portion of an existing double circuit 115-kV transmission line between Devon and Norwalk in Trumbull.  Staff Report.  Approved 11/25/75

PETITION NO.  34 - Northeast Utilities Service Company petition for modifications to two 115 kV transmission lines in Newington.  Staff Report.  Approved 2/20/76

PETITION NO.  35 - Northeast Utilities Service Company petition for construction of a 120-foot by 120-foot warehouse building with attached 60-foot long by 30-foot wide exterior platform, a new 54-foot by 42-foot guard house, and a fish diversion and trench deflection structure at an existing circulating water intake in the Connecticut River, at Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 9/3/76

PETITION NO.  36 - The Connecticut Light and Power Company petition for construction of a double circuit 115-kV line at the Mianus River, in Greenwich.  Staff Report.  Approved  5/15/77 Rev. Approv. 1/11/80

PETITION NO.  37 -Connecticut Light and Power Company petition for the construction of a 69-kV line to supply the Skungamaug Substation crossing facilities of the Southern New England Telephone Company, in Coventry. Approved 6/23/77  Staff Report.  Rev. Approv. 9/25/77

PETITION NO.  38 - Connecticut Light and Power Company petition for construction of a 27.6-kV line capable of operation at 115-kV from Enfield Substation to Windsor Locks, crossing facilities of the Consolidated Rail Corporation (Conrail) and the National Railroad Passenger Corporation (Amtrak), in Enfield and Windsor Locks.  Staff Report.  Approved 9/28/77

PETITION NO.  39 - Hartford Electric Light Company petition to construct a 115-kV line from Canton Substation, in Canton to North Bloomfield Substation, in Bloomfield, crossing facilities of the Southern New England Telephone, in Canton, Simsbury, and Bloomfield.  Staff Report.  Approved 12/13/77

PETITION NO.  40 - United Illuminating Company petition for modifications to UI’s electric generating station on the west shore of Bridgeport Harbor, in Bridgeport.  Staff Report.  Approved 11/16/77

PETITION NO.  41 - The Connecticut Light and Power Company petition for a Microwave Telecommunication Tower on Aunt Patty’s Lane, in Bethel.  Denied 11/29/77 - SEE DOCKET 13

PETITION NO.  42 - Northeast Utilities petition for the installation of one wood pole structure and minor conductor additions required to tap an existing 115-kV line and supply the proposed Brooklyn Substation, in Brooklyn.  Staff Report.  Approved 5/17/78

PETITION NO.  43 - Town of Wallingford petition for the retro fitting of three coal-fired furnaces with four low-excess air oil burners in four steam generators at Alfred L. Pierce Station, East St., in Wallingford. Approved 9/25/78

PETITION NO.  45 - Haystack Cable Vision petition for the construction of a tower, in Salisbury. Approved - No Certificate Required 12/1/78

PETITION NO.  46 - Waterbury Community Antenna, Inc. petition to construct an earth station receiver, on East Aurora St., in Waterbury. Approved 1/8/79

PETITION NO.  47 - National Passenger Corporation (Amtrak) petition for four 100-foot high steel monopole telecommunications towers within Amtrak’s right-of-way located off Hallock Avenue, New Haven; off Whitfield Street, Guilford, east of the Boston Post Road overpass, Old Saybrook; and near Hamilton Street and Smith Street, New London. Denied 11/30/79

PETITION NO.  48 - The Connecticut Light and Power Company petition for installation of wood structures and associated guys along its 115-kV transmission line from East Meriden Substation to Haddam Substation, in Haddam and Middletown.  Staff Report.  Approved 11/30/79

PETITION NO.  49 - Southern New England Telephone Company petition for construction of a replacement microwave tower on Birch Mountain Road, in Glastonbury.  Staff Report.  Approved 1/11/80

PETITION NO.  50 - Coastal Cable TV Company petition to place a receiving dish on the Department of Public Safety’s tower, on Vinegar Hill Road, in Ledyard. Approved 2/22/80

PETITION NO. 51 - Coastal Cable TV Company CTI Towers, Inc. petition for the modification of a tower site, in Stonington to transmit to the State Police tower, in Ledyard. Approved 3/19/80 Notice of Ownership dated 02/28/17

PETITION NO.  52 - Connecticut Light and Power Company petition for the replacement of thirteen transmission line structures with taller structures along sections of the existing Plumtree Substation to Peaceable Substation 115-kV line in Bethel and Redding.  Staff Report.  Approved 3/13/80

PETITION NO.  53 - Connecticut Light and Power Company petition for the installation of 115-kV transmission line conductor, line taps, and associated equipment on an existing lattice steel structure located at Stony Hill Substation, Stony Hill Road, in Brookfield.  Staff Report.  Approved 3/13/80

PETITION NO.  54 - Northeast Cablevision, Inc. petition for the installation of a lattice-type, parabolic signal reflector and microwave receiving antenna at a head-end facility located on Platt Hill, off Route 263. (Winchester)  Staff Report.  Denied 4/10/80

PETITION NO.  55 - Connecticut Department of Transportation petition for the construction of a telecommunications tower, antenna, associated equipment, and equipment building at an existing tower site located on Vinegar Hill off Vinegar Hill Road, in Ledyard.  Staff Report.  Approved 4/18/80

PETITION NO.  56 - Northeast Utilities Service Company petition for the construction of a low-level, radioactive waste storage facility at Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 11/6/80

PETITION NO.  57 - Northeast Utilities Service Company petition for the construction of a 1.1 acre parking area addition to an existing parking lot at the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 4/18/80

PETITION NO.  58 - Northeast Utilities Service Company petition for the construction of a one-story, concrete Emergency Operations Center building at the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 6/19/80

PETITION NO.  59 - Northeast Utilities Service Company petition for the construction of a one-story concrete Emergency Operations Center building and parking lot at Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 6/19/80

PETITION NO.  60 - Northeast Utilities Service Company petition for construction of a one-story concrete low-level solidified radioactive waste storage building within Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 11/6/80

PETITION NO.  61 - Connecticut Department of Transportation petition for the construction of a self-supporting lattice tower and antennas to replace an existing tower located at State Police Troop F Barracks, in Westbrook.  Staff Report.  Approved 9/16/80

PETITION NO.  62 - Connecticut Light and Power Company petition for the construction of a steel lattice structure associated equipment and relocation of a portion of an existing 115-kV transmission line at the intersection of a Penn Central railroad right-of-way and Beachside Avenue, in Westport.  Staff Report.  Approved 2/25/81

PETITION NO.  63 - Connecticut Department of Transportation petition for the construction of a telecommunications tower, microwave antenna, and associated equipment to replace an existing tower located on a bus service center building located at 93 Vernon Street, in Hartford.  Staff Report.  Denied 2/25/81

PETITION NO.  64 - Connecticut Department of Transportation petition for the construction of a telecommunications tower, microwave antenna, and associated equipment to replace an existing tower located at 470 James Street, New Haven.  Staff Report.  Denied 2/25/81

PETITION NO.  65 - Connecticut Light and Power Company petition for reconductoring and replacing the supporting structures of the existing 115-kV transmission line from Plumtree Substation, in Bethel to Ridgefield Junction, in Redding.   Staff Report.  Denied 3/11/81

PETITION NO.  66 - Connecticut Department of Transportation petition for the installation of telecommunications antennas on an existing telecommunications tower owned by Northeast Utilities located on Goose Hill ,off Porkorny Road, in Haddam.  Staff Report.  Approved 3/11/81

PETITION NO.  67 - Southern New England Telephone Company petition for the construction of an 80-foot tall square lattice steel tower antenna and associated equipment, concrete equipment building, and fuel storage tank at an existing tower facility in Wolcott; construction of a concrete equipment building and installation of microwave antennas and associated equipment on an existing tower in Waterbury; installation of microwave antennas and associated equipment on existing towers in Meriden; and in Bridgeport, Shelton, and Norwalk.  Staff Report.  Approved 4/1/81

PETITION NO.  68 - Algonquin Gas Transmission Company petition for the installation of a 50-foot tall monopole telecommunications antenna at its Meter Station site on Arch Street, Putnam.  Staff Report.  Approved 5/20/81

PETITION NO.  69 - Connecticut Department of Transportation petition for the installation of a microwave parabolic antenna on an existing telecommunications tower located on West Rock in New Haven and two microwave antennas on an existing telecommunications tower located on Buckley Hill Road, in Colchester.  Staff Report.  Approved 7/2/81

PETITION NO.  70 - Northeast Utilities Service Company petition for the construction of a training facility consisting of a building, parking area, and septic system within Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 7/2/81

PETITION NO.  71 - Southwire Company petition for the construction of a new power house and repairs to an existing hydroelectric facility at the Wyre Wynd Plant, located on the Quinebaug River, in Jewett City.  Staff Report.  Approved 9/27/81

PETITION NO.  72 - Eveready Machinery Company petition for the refurbishment of an existing lowhead hydroelectric plant located on the east bank of the Housatonic River south of the Derby Dam, in Derby.  Staff Report.  Tabled 10/9/81, No Other Record of Action.

PETITION NO.  73 - Connecticut Natural Gas Company petition for the construction of a wood pole telecommunication tower and equipment enclosure at an existing gate station off Dekraft Road, in Greenwich.  Staff Report.  Approved 10/1/81

PETITION NO.  74 - Connecticut State Police petition for proposed modifications to the existing two-way radio communications system, in Westport and Wilton.  Staff Report.  Approved 9/24/81

PETITION NO.  75 - -Storer Communications of Clinton, Inc. CTI Towers , Inc. petition for the construction of an equipment building and additional microwave earth station receiver at an existing CATV telecommunications facility located off Route 81, in Killingworth. Approved 10/22/81 Staff Report.  Notice of Ownership dated 02/28/17

PETITION NO.  75 - Storer Communications of Clinton, Inc. petition for the construction of an equipment building and additional microwave earth station receiver at an existing CATV telecommunications facility located off Route 81, in Killingworth.  Staff Report.  Approved 10/22/81

PETITION NO.  76 - Algonquin Gas Transmission Company petition for the installation of a compressor at its Cromwell regulator station located off Route 3, in Cromwell. Approved 12/10/81

PETITION NO.  77 - Connecticut Light and Power Company petition for the construction of two double circuit steel pole transmission line structures and relocation of a segment of an existing 115-kV transmission line in the Stamford Railroad Station right-of-way, in Stamford.  Staff Report.  Approved 1/28/82

PETITION NO.  78 - Cablevision of Connecticut petition for the installation of CATV microwave antennas and associated head-end equipment on the roof of a building located at 50 Fairview Avenue, in Norwalk.  Approved 3/1/82

PETITION NO.  79 - Southern New England Telephone Company petition for the placement of microwave antennas on the roofs of existing buildings at 85 Main Street, Bristol, and 239 Prospect Street, Torrington, and on an existing telecommunications tower located on Wildcat Hill, off Wildcat Hill Road, in Harwinton.  Staff Report.   Decision LetterApproved 3/1/82

PETITION NO.  80 - Connecticut Light and Power petition for the rebuilding of an 115 kV lattice tower line in the Town of Manchester.  Staff Report.  Approved 3/1/82

PETITION NO.  81HW - McKesson Chemical Company petition for a ruling on the Siting Council’s (HW) jurisdiction under Public Act 81-369 as applied to the 309 State Street plant, in North Haven. Approved 9/8/82

PETITION NO.  82 - The Connecticut Light and Power Company petition for rebuilding and relocating a section of the 115-kV transmission line in the vicinity of Forbes Street, in East Hartford and Spencer Street, in Manchester.  Staff Report.  Approved 5/13/82

PETITION NO.  83 - The Hartford Electric Light Company petition for the relocation of a section of the 115-kV transmission line in the vicinity of Forbes Street and Roberts Street, in East Hartford.  Staff Report.  Approved 4/23/82

PETITION NO.  84 - United Illuminating Company petition for the reconversion of Bridgeport Harbor Station , Unit No. 3, in Bridgeport, for the capability to burn either low sulfur coal or oil.  Staff Report.  DENIED, became Docket No. 27.

PETITION NO.  85 - Century Norwich Corporation petition for the removal of four 40-foot high wooden poles supporting antennas and one 80-foot high CATV tower, and the construction one 300-foot high CATV tower at Plane Hill Road, in Norwich. Denied 6/4/82, became Docket No. 30

PETITION NO.  86 - Hale Manufacturing Company petition for the redevelopment of the Cargill Falls 1.3 MW hydroelectric generating project, in Putnam.  Staff Report.  Approved 8/12/82

PETITION NO.  87 - Southern New England Telephone Company petition for implementation of SNET’s 1983 microwave digital signal plan with improvements to facilities in Canaan and Norfolk.  Staff Report.  Approved 11/5/82

PETITION NO.  88 - Northeast Utilities petition for a proposed 115 kV line modification in Redding.  Staff Report.  Approved 11/12/82

PETITION NO.  89 - The Connecticut Light and Power Company petition for modifications to the 115-kV, Plumtree Substation - Newtown Substation, transmission line in Bethel and Newtown.  Staff Report.  Approved 12/13/82

PETITION NO.  90 - Northeast Utilities petition for modifications to the 115-kV transmission line between Whipple Junction, Mystic Junction, and Mystic Substation in Stonington, Ledyard, and Groton.  Staff Report.  Approved 12/13/82

PETITION NO.  91 - The Connecticut Light and Power Company petition for removal of the de-energized Skungamaug Substation-Rockville Junction, 69-kV transmission line in Vernon, Tolland, and Coventry.  Staff Report.  Approved 12/22/82

PETITION NO.  92 - The Connecticut Light and Power Company petition for modifications and additions to two Schwab Junction-Beseck Junction 115-kV transmission lines to the North Wallingford Substation, in Wallingford.  Staff Report.  Approved 5/24/83

PETITION NO.  93 - The Connecticut Light and Power Company petition for modifications to the Frost Bridge Substation-Southington Substation 345-kV transmission line, in Southington and Wolcott.  Staff Report.  Approved 6/20/83

PETITION NO.  94 - The United Illuminating Company petition for reconstructing a section of the Grand Avenue Substation - Sackett Point Substation 115-kV transmission line in New Haven and North Haven.  Staff Report.  Approved 6/20/83

PETITION NO.  95 - Northeast Utilities Service Company petition for the construction of a simulation training facility building at the Millstone Point nuclear facility, in Waterford.  Staff Report.  Approved 7/12/83

PETITION NO.  96 - Northeast Utilities petition for modifications to sections of the Southington Substation - Wallingford Substation, Southington Substation - Hanover Substation, Southington Substation - East Meriden Substation, 115-kV transmission lines located in Meriden.  Staff Report.  Approved 8/23/83

PETITION NO.  97 - Northeast Utilities petition for the addition of a transformer and associated equipment in the Norwalk Substation, in Norwalk.  Staff Report.  Approved 11/4/83

PETITION NO.  98 - Northeast Utilities petition for modifications to the Frost Bridge Substation-Long Mountain Substation, 345-kV transmission line off Fenn Hill Road, in Watertown.  Staff Report.  Approved 2/10/84

PETITION NO. 99 - The Connecticut Department of Transportation petition for a proposed 60 Hz railroad electrical supply station off Increase La., in Westport.   Staff Report.  Approved 2/10/84

PETITION NO.  100 - Northeast Utilities petition for the addition of a microwave transmitter/receiver at its existing telecommunication facility located off Porkorny Road, in Haddam. Withdrawn 2/6/84

PETITION NO.  101 - Northeast Utilities petition for modifications to the Sasco Creek Substation-Ash Creek Substation (UI) 115-kV transmission line at Sasco Creek Substation, in Westport.  Staff Report.  Approved 2/10/84

PETITION NO.  102 - The Connecticut Light and Power Company petition for the addition of a microwave transmitter/receiver dish and associated equipment at its existing telecommunications facility off Porkorny Road, in Haddam.  Staff Report.  Approved 2/24/84

PETITION NO.  103 - Northeast Utilities petition for additions to the Manchester Substation, in Manchester.  Staff Report.  Approved 3/14/84

PETITION NO.  104 - The United Illuminating Company petition for the residing of its New Haven Harbor generating Station, in New Haven.  Staff Report.  Approved 4/11/84

PETITION NO.  105 - Arco Metals Company petition for hydroelectric project on the Naugatuck River, in Ansonia. Staff Report.  Approved 5/7/84

PETITION NO.  106 - The Southern New England Telephone Company petition for a declaratory ruling that no Certificate is required for its proposed replacement of its microwave tower, in Norfolk.  Staff Report.  Approved 7/24/84

PETITION NO.  107 - The Connecticut Resources Recovery Authority petition for a processing plant within the Mid-Connecticut Refuse-to-Energy project, in Hartford.  Staff Report.  Denied 11/24/84

PETITION NO.  108 - The Connecticut Resources Recovery Authority petition for the repowering of the existing Connecticut Light and Power South Meadows Generating Station, in Hartford.  Staff Report.  Denied 11/24/84

PETITION NO.  109 - The United Illuminating Company petition for an interim alteration in coal transport procedure at Steel Point Station, in Bridgeport. Approved 7/3/84

PETITION NO.  110 - The Department of Environmental Protection petition for a declaratory ruling that no Certificate is required for facilities to be used for automated flood warning in the State of Connecticut. Approved 9/14/84

PETITION NO.  111 - New Milford Cablevision Company petition for a declaratory ruling that no Certificate is required for the modification of CATV headend facility, in New Milford.   Staff Report.  Approved 9/23/84

PETITION NO.  112 - Storer Cable Communications petition for replacement of a CATV tower and expansion of a service building ,off Route 81, in Killingworth.  Staff Report.  Denied 10/9/84

PETITION NO.  113 - The United Illuminating Company petition for fluid filling underground cables at its Grand Avenue to West River Substation, in Bridgeport.  Staff Report.  Approved 10/9/84

PETITION NO.  114 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for reconfiguration of its West River Substation,  in New Haven.  Staff Report.  Approved 10/9/84

PETITION NO.  115 - The United Illuminating Company petition for reconductoring and reinsulating approximately 11.8 miles of 115-kV line between its West River and Baird Substation, excluding the Mildale Substation to Devon Substation section, in New Haven.  Staff Report.  Approved 10/9/84

PETITION NO.  116 - Northeast Utilities Service Company petition for a low-level radioactive waste reduction building at Connecticut Yankee and Millstone Nuclear Power Stations, in Haddam and Waterford respectively.  Staff Report.  Approved 10/9/84

PETITION NO.  117 - Northeast Utilities Company petition for addition of a 47 MVA, 11- to 23-kV transformer and two 23-kV feeders within Enfield 12C Substation, in Enfield.  Staff Report.  Approved 10/9/84

PETITION NO.  118 - Northeast Utilities Service Company petition for declaratory ruling that no Certificate is required for certain additions to the South End 1G Substation, in Stamford.  Staff Report.  Approved 11/16/84

PETITION NO.  119HW - The Hitchcock Gas Engine Company petition regarding storage of hazardous waste oils, in Bridgeport. Denied 11/16/84

PETITION NO.  120HW - CECOS Treatment Corporation petition for the proposed storage of containerized waste on Broderick Road, in Bristol. Approved 12/7/84

PETITION NO.  121 - Haystack Corporation petition for a declaratory ruling that no Certificate is required for modification of CATV head-end facility, in Salisbury.  Staff Report.  Approved 12/20/84

PETITION NO.  122 - Northeast Utilities Service Company petition for an Oil Drum Storage Building at the Montville Generating Station, in Monteville.  Staff Report.  Approved 2/1/85

PETITION NO.  123 - Northeast Utilities Service Company petition for replacement of the Devon Station Unit 10 Emergency Combustion Turbine, in Milford.  Staff Report.  Approved 2/27/85

PETITION NO.  124 - Storer Cable Communications petition for a replacement tower and expansion of a service building at the existing headend structure, off Route 81, in Killingworth.  Staff Report.  Approved 4/12/85

PETITION NO.  125 - Algonquin Gas Transmission Company petition to construct a natural gas transmission line between Cheshire and Farmington. Approved 3/26/85

PETITION NO.  126 - The Connecticut Light and Power Company petition for the addition of a fourth generating unit at the Falls Village hydroelectric project, in Canaan.  Approved 5/29/85

PETITION NO.  127 - 108 Radio Company Limited Partnership petition to place an FM transmission antenna and associated equipment on the existing Unit No. 3 smokestack of the Bridgeport Harbor, United Illuminating Company facility, in Bridgeport.  Staff Report.  Approved 4/12/85  Notification of Retirement 10/29/21 Council Acknowledgement of Retirement

PETITION NO.  128 - Southern New England Telephone Company petition for the proposed addition of an antenna to a microwave tower at 555 Main Street, in Stamford.   Staff Report.  Approved 5/29/85

PETITION NO.  129 - Northeast Utilities Service Company petition for modifications to the Southington-Hanover 115-kV line in Southington and Meriden.  Staff Reports for Petitions 129 - 136.  Approved 8/20/85

PETITION NO.  130 - Northeast Utilities Service Company petition for modifications to the Southington-Wallingford Junction 115-kV line in Southington, Meriden, and Cheshire.  Staff Report.  Approved 8/20/85

PETITION NO.  131 - Northeast Utilities Service Company petition for modification of the Southington-Glen Lake Junction 115-kV line in Southington, Meriden, Wallingford, Cheshire, Hamden, and Bethany.  Staff Report.  Approved 8/20/85

PETITION NO.  132 - Northeast Utilities Service Company petition for modifications to Cook Hill Junction-Devon 115-kV line in Hamden and Orange.  Staff Report.Approved 8/20/85

PETITION NO.  133 - Northeast Utilities Service Company petition for modifications to the Hanover-Devon Substation 115-kV line in Cheshire, Bethany, Woodbridge, Orange, and Milford.  Staff Report.  Approved 8/20/85

PETITION NO.  134 - Northeast Utilities Service Company petition to reconductor the Southington-Schwab Junction 115-kV line in Southington, Cheshire, Meriden, and Wallingford.  Staff Report.Approved 8/20/85

PETITION NO.  135 - Northeast Utilities Service Company petition for the construction of the Southington-Lucchini Junction 115-kV line in Southington, Meriden, Wallingford, and Cheshire.  Staff Report.  Approved 8/20/85

PETITION NO.  136 - Northeast Utilities Service Company petition for modifications to the Hanover Substation, in Meriden.  Staff Report.  Approved 8/20/85

PETITION NO.  137HW - Solvents Recovery Service of New England, Inc. petition to replace and relocate tank storage, replace equipment, reduce storage capacity and install groundwater treatment system, in Southington. Approved 9/26/85

PETITION NO.  138 - Northeast Utilities Service Company petition for modifications to three 115-kV lines, in Wolcott. Staff Report.  Approved 9/9/85

PETITION NO.  139 - The Connecticut Resources Recovery Authority Petition regarding facility status of the Refuse-to-Energy Cogeneration Project, in Wallingford. Approved 8/29/85

PETITION NO.  140HW - United Oil Recovery, Inc. petition regarding proposed modifications to its existing facility, in Meriden.  Staff Report.  Approved 9/26/85

PETITION NO.  141 - The Department of Environmental Protection petition for proposed changes to existing telecommunications facilities in Oxford, Cornwall, Hartford, Sterling, Ledyard, and Colchester.  Staff Report.  Approved 10/8/85

PETITION NO.  142 - Tele-Media Company of Northeastern Connecticut petition for proposed changes to an existing tower at its facility located on Perrin Road in Woodstock.  Staff Report.  Approved 10/8/85

PETITION NO.  143HW - CECOS Treatment Corporation petition for changes to its Connecticut Discharge Permit by lowering waste concentration, in Bristol. Partial Approval 11/26/85

PETITION NO.  144HW - CECOS Treatment Corporation petition for replacement of tanks, processes and equipment and addition of storage capacity, in Bristol. Partial Approval 11/26/85

PETITION NO.  145 - Northeast Utilities Service Company petition for the proposed modification of the Berlin to West Side 115-kV line, in Berlin.  Staff Report.  Approved 12/23/85

PETITION NO.  146 - Northeast Utilities Service Company petition for the proposed modification of the Canton to Weingart Road Junction 115-kV line in Canton, New Hartford, and Harwinton.  Staff Report.  Approved 12/23/85

PETITION NO.  147 - The Connecticut Resources Authority petition for the switchyard and interconnection line of the Refuse-to-Energy Cogeneration Project, in Wallingford.  Staff Report.  Approved 12/23/85

PETITION NO.  148 - Northeast Utilities Service Company petition for proposed modifications to 115-kV lines, in Norwalk.  Staff Report.Approved 1/27/86

PETITION NO.  149 - The Connecticut Light and Power Company petition to add a seventh hydroelectric generating unit to its existing Bulls Bridge Development on the Housatonic River, in Kent.    Approved 1/27/86

PETITION NO.  150 - Northeast Utilities Service Company petition to install two new auxiliary steam boilers at the Montville Generating Station.  Staff Report.  Approved 2/19/86

PETITION NO.  151 - The Connecticut Light and Power Company petition for modifications of the Norwalk-Peaceable 115-kV line, in Norwalk and Wilton.  Staff Report.  Approved 3/12/86

PETITION NO.  152 - Flagg Development Corporation petition for the Hartford Hospital Cogeneration project, in Hartford.  Staff Report.  Denied 2/19/86

PETITION NO.  153 - The Connecticut Light and Power Company petition for modification of the Frost Bridge-Campville 115-kV line in Watertown, Thomaston, Litchfield, and Harwinton.  Staff Report.  Approved 4/9/86

PETITION NO.  154 - The Southern New England Telephone Company (SNET) and SONECOR petition for the proposed addition of cellular antennas to a SNET rooftop facility at 555 Main St., in Stamford.  Staff Report.  Approved 2/14/86

PETITION NO.  155 - The Connecticut Yankee Atomic Power Company petition for the proposed addition to the administration building at Connecticut Yankee Nuclear Power Station, in Haddam. Approved 3/12/86

PETITION NO.  156HW - Envirite Corporation petition to place new tanks and new equipment, construct new waste pits and add temporary container storage.  Staff Report.  Partial Approval 4/9/86

PETITION NO.  157 - Northeast Utilities petition for a proposed addition and associated equipment within Rocky Hill 3R Substation, in Rocky Hill.  Staff Report.  Approved 6/16/86

PETITION NO.  158HW - Uniroyal Chemical petition for use of an existing Elm Street building as a staging area for bulking of packaged waste into larger containers, in Naugatuck. Denied 7/11/86

PETITION NO.  159 - Northeast Utilities petition for the proposed modifications of a 115-kV line substation bus at Southington Substation, in Southington.  Staff Report.  Approved 8/4/86

PETITION NO.  160 - Northeast Utilities Service Company petition for proposed modifications to a 345/115-kV line and a 115-kV line, in Windsor.  Staff Report.  Approved 9/10/86

PETITION NO.  161 - United Illuminating Company petition for a natural gas fired heating boiler system at English Station, in New Haven.  Staff Report.  Approved 10/6/86

PETITION NO.  162 - Northeast Utilities Service Company petition for proposed installation of an Emergency Satellite Office Trailer at Manchester 3A Substation, in Manchester.  Staff Report.  Approved 9/22/86

PETITION NO.  163 - Northeast Utilities Service Company petition for installation of an emergency satellite office trailer and associated equipment within Rocky Hill Substation, in Rocky Hill.  Staff Report.  Approved 9/22/86

PETITION NO.  164 - Northeast Utilities Service Company petition for the addition of a 47-MVA, 110-13.8-kV transformer, a 115-kV circuit breaker, and the replacement of an existing 5.4 MVAR capacitor bank within the Forestville 12A Substation, in Bristol.  Staff Report.  Approved 10/6/86

PETITION NO.  165 - Northeast Utilities Service Company petition for the proposed removal of a 69-kV tower line from New Britain to Bristol.  Staff Report.  Approved 11/10/86

PETITION NO.  166- Northeast Utilities petition for a  proposed addition to the existing Millstone Unit No.3 maintenance shop, in Waterford.  Staff Report. Approved 11/10/86

PETITION NO.  167 - Cablevision of Connecticut Limited Partnership, petition for the addition of a microwave dish antenna at its head-end facility on Fairview Avenue, in Norwalk.  Staff Report.  Approved 11/10/86

PETITION NO.  168 - Northeast Utilities Service Company petition to construct a new switchgear building at the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 12/22/86

PETITION NO.  169 - Northeast Utilities petition for proposed outage support facilities at Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 12/22/86

PETITION NO.  170 - CRRA, SCRRA, and American Refuel petition for an electric generating facility fueled by mass-burning municipal solid waste, in Preston. Withdrawn  12/1/86

PETITION NO.  171 - The Connecticut Resources Recovery Authority petition for the Refuse-to-Energy Cogeneration Project, in Wallingford.  Staff Report.  Approved 12/22/86

PETITION NO.  172 - Connecticut Natural Gas Corporation petition for the construction and operation of temporary towers and associated equipment in New Britain, Bloomfield, Glastonbury, and Rocky Hill.   Staff Report.  Denied 1/28/87

PETITION NO.  173 - Northeast Utilities petition to relocate a section of wood pole 34-kV and 115-kV lines around a sanitary landfill, in New Milford.  Staff Report.  Approved 1/12/87

PETITION NO.  174 - Northeast Utilities petition for the addition of equipment to the Newtown 12M substation, in Newtown.  Staff Report.  Approved 2/4/87

PETITION NO.  175 - Northeast Utilities petition for the proposed addition of equipment to the existing 14-kV Substation, in Windsor Locks.  Staff Report.  Approved 2/18/87

PETITION NO.  176 - Cablevision Systems of Southern Connecticut Limited Partnership petition to install additional head-end equipment, at 120 Huntington Turnpike, in Bridgeport.  Staff Report.  Approved 2/18/87

PETITION NO.  177 - Northeast Utilities petition for proposed addition of equipment to the existing Bloomfield 3B Substation, in Bloomfield.  Staff Report.  Approved 3/11/87

PETITION NO.  178 - Iroquois Natural Gas Transmission System petition on Siting Council jurisdiction over the proposed Iroquois pipeline. Council has some jurisdiction 8/4/87

PETITION NO.  179 - The Connecticut Light and Power Company petition for the construction of a 115-kV line tap to an existing transmission line, in Windsor Locks.  Staff Report.  Denied 4/1/87

PETITION NO.  180 - Metro Mobile CTS of Fairfield County, Inc. and Cablevision Systems of Southern Connecticut, Limited Partnership petition for the addition of cellular antennas and related equipment to an existing tower, in Shelton. Withdrawn 4/3/87

PETITION NO.  181HW - Envirite Corporation petition for  the proposed addition of a new pump, five new tanks, and an increase in floor space at their Thomaston facility.  Staff Report.  Approved 5/13/87

PETITION NO.  182 - Connecticut Light and Power Company petition for a proposed addition of a new 115-kV underground cable termination, two 115-kV circuit breakers and associated equipment at Montville Substation, in Montville.  Staff Report.  Approved 5/13/87

PETITION NO.  183 - Connecticut Light and Power Company petition to construct a proposed 115-kV underground line from the AES Thames Cogenerator to Montville Substation, in Montville. See Pet. 185, Denied 5/13/87

PETITION NO.  184 - Connecticut light and Power Company petition for the proposed addition of one 115-kV transformer, two 23-kV feeder positions, and a looped-line arrangement at the Canal 15Q Substation, in Southington.  Staff Report.  Approved 6/19/87

PETITION NO.  185 - Connecticut Light and Power Company petition to construct a proposed 115-kV underground line from the AES Thames Cogenerator to Montville Substation, in Montville.  Staff Report.  Denied 5/13/87

PETITION NO.  186 - Connecticut Light and Power Company petition for proposed modifications to the Thomaston 2B Substation, in Thomaston.  Staff Report.  Approved 6/19/87

PETITION NO.  187 - Connecticut Light and Power Company petition for the addition of transformers associated equipment at Devon 7R Substation, in Milford.  Staff Report.  Approved 6/19/87

PETITION NO.  188 - Connecticut Light and Power Company petition for proposed underground interconnection between the Capitol District Energy Center Cogeneration Project and the existing 115-kV northwest Hartford - Southwest Hartford underground transmission line. Denied 8/4/87

PETITION NO.  189 - Connecticut Light and Power Company petition to relocate two 69-kV lines at Montville Substation, in Montville.  Staff Report.  Approved 8/25/87

PETITION NO.  190 - Northeast Utilities petition for an addition to a 115-kV Glenbrook Substation off Lincoln Ave., in Stamford.  Staff Report.  Approved 9/10/87

PETITION NO.  191 - Northeast Utilities petition for a proposed modification of a mobile transformer position within the West Brookfield Substation, in Brookfield.  Staff Report.  Approved 10/6/87 Rev. Approv. 3/22/88

PETITION NO.  192 - Northeast Utilities petition for a proposed addition of two 115-kV circuit switches within the Cedar Heights Substation, in Stamford.  Staff Report.  Approved 10/6/87

PETITION NO.  193HW - The Connecticut Light and Power Company petition for replacement of a single lined impoundment with a two-cell concrete tank at Norwalk Harbor Station, in Norwalk.  Staff Report.  Approved 10/22/87

PETITION NO.  194 - The Connecticut Light and Power Company petition for the construction on an above ground concrete tank and the closing of a surface impoundment at the Norwalk Harbor Station, in Norwalk.  Staff Report.  Approved 10/22/87

PETITION NO.  195HW - Environmental Waste Resources, Inc., petition for an increase in permitted discharge flows for non-hazardous waste to the Waterbury POTW, in Waterbury.  Staff Report.  Approved 11/5/87

PETITION NO.  196HW - Environmental Waste Resource, Inc., petition for the removal and replacement of existing storage tanks and addition of a new mixer and dryer at their facility, in Waterbury.  Staff Report.  Approved 11/5/87

PETITION NO.  197HW - Environmental Waste Resources, Inc. petition to accept additional types of waste, and accept transformers containing PCB’s for short-term storage at their facility, in Waterbury.  Staff Report.  Approved 11/5/87

PETITION NO.  198 - The United Illuminating Company petition for an alternative coal transport procedure at its Bridgeport Harbor Station No. 3, in Bridgeport.  Staff Report.  Approved 12/16/87  Notification of Retirement 10/29/21 Council Acknowledgement of Retirement

PETITION NO.  199 - Northeast Utilities petition for a proposed addition of a mobile transformer position within the Triangle Substation, in Danbury.  Staff Report.  Approved 1/14/88

PETITION NO.  200 - The Connecticut Light and Power Company petition for modifications to transmission lines between West Side Substation in Middletown through Berlin Substation, to Newington Substation.  Staff Report.  Approved 1/28/88

PETITION NO.  201- The Connecticut Light and Power Company petition for proposed modifications to three 115-kV circuits between Manchester, South Windsor, and Barbour Hill Substations, in Manchester and South Windsor.  Staff Report.  Approved 2/17/88

PETITION NO.  202 - The United Illuminating Company petition for proposed lightning protection at East Shore Substation, in New Haven.  Staff Report.  Approved 3/3/88

PETITION NO.  203HW - The Connecticut Light and Power Company petition for the construction of an aboveground concrete tank at Middletown Station, in Middletown.  Staff Report.  Approved 3/22/88

PETITION NO.  204HW - The Connecticut Light and Power Company petition for the construction of an aboveground concrete tank at Montville Generating Station, in Montville.  Staff Report.  Approved 3/22/88

PETITION NO.  205HW - The Connecticut Light and Power Company petition for replacement of a single lined surface impoundment with a two cell concrete tank at Montville Generating Station, in Montville.  Staff Report.  Approved 3/22/88

PETITION NO.  206HW - Connecticut Light and Power Company petition for changes to existing hazardous waste facility, including replacement of a concrete tank, at Middletown Station, in Middletown.  Staff Report.  Approved 3/22/88

PETITION NO.  207 - The Connecticut Light and Power Company petition for the construction of an aboveground concrete tank and the replacement of a surface impoundment at Devon Station, in Milford.  Staff Report.  Approved 4/27/88

PETITION NO.  208HW - The Connecticut Light and Power Company petition for changes to the existing hazardous waste facility at Devon Station, in Milford.  Staff Report.  Approved 4/27/88

PETITION NO.  209 - Northeast Utilities Service Company petition for a proposed switchyard at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/27/88

PETITION NO.  210 - The Connecticut Light and Power Company petition for proposed modifications to two 115-kV lines, in Hartford and East Hartford.  Staff Report.Approved 5/3/88

PETITION NO.  211 - United Illuminating Company petition for a determination that no Certificate is required for the proposed construction of a control building adjacent to its East Main Street Substation and the relocation of 115-kV/13.8-kV transformers, connectors, and associated controls from the Steel Point Generating Plant building to the East Main Street Substation, in Bridgeport.  Staff Report.  Approved 5/19/88

PETITION NO.  212HW - Connecticut Light and Power Company petition for the proposed construction of an aboveground wastewater clarifier at Devon Station, in Milford.  Staff Report.  Approved 7/19/88

PETITION NO.  213HW - Connecticut Light and Power Company petition requesting a determination that no Certificate is required for proposed changes to the existing hazardous waste facility at Devon Substation, in Milford.  Staff Report.  Approved 7/19/88

PETITION NO.  214 - The Connecticut Light and Power Company petition for construction of two above ground steel fuel tanks in a concrete containment area at its Norwalk Harbor Station, in Norwalk.  Staff Report.  Approved 8/19/88

PETITION NO.  215 - The Connecticut Light and Power Company petition for the proposed addition of 345 kv current transformers and motor operators for disconnect switches within the Southing 4C substation, in Southington.  Staff Report.  Approved 8/19/88

PETITION NO.  216 - DENIED 8/19/88 , became Docket No. 96.

PETITION NO.  217 - Northeast Utilities petition for proposed modifications for replacement of the existing 13 MVA, 69- to 13.8-kV transformer within the North Canaan Substation, in North Canaan.  Staff Report.  Approved 9/27/88

PETITION NO.  218 - The Connecticut Light and Power Company petition for modifications to the Barbour Hill-Enfield and Enfield-Windsor Locks 115-kV lines.  Staff Report.  Approved 10/27/88

PETITION NO.  219 - The Stone Paperboard Corporation petition for a proposed 2.2 megawatt steam turbine cogeneration facility to be installed at its manufacturing plant, in Uncasville.  Staff Report.  Approved 11/21/88

PETITION NO.  220 - The Connecticut Yankee Atomic Power Company petition for proposed plant support buildings at Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 11/21/88

PETITION NO.  221HW - Statewide Environmental Services petition for short-term storage of polychlorinated biphenyl contaminated electrical capacitors at a proposed “White Goods” scrap decontamination center located in New Haven County.  Staff Report.  Approved 11/21/88

PETITION NO.  222 - The Connecticut Light and Power Company petition for the removal of four lattice towers and conductors from the Rocky Hill to Middletown 69-kV lines, in Rocky Hill.  Staff Report.  Approved 11/21/88

PETITION NO.  223 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment within Manchester Substation, in Manchester.  Staff Report.  Approved 12/19/88

PETITION NO.  224 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment within North Bloomfield Substation, in Bloomfield.  Staff Report.  Approved 12/29/88

PETITION NO.  225 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment within Plumtree Substation, in Bethel.  Staff Report.  Approved 12/19/88

PETITION NO.  226 - The Connecticut Light and Power Company petition for proposed changes to the fuel, stack height, and project schedule at Montville Generating Station, in Montville.  Staff Report.  Approved 12/19/88

PETITION NO.  227 - The Connecticut Light and Power Company petition for proposed additions to Windsor Locks Substation, in Windsor Locks.  Staff Report.  Approved 12/19/88

PETITION NO.  228 - The Connecticut Light and Power Company petition for proposed additions at Uncasville 1Q Substation, in Montville.  Staff Report.  Approved 2/14/89

PETITION NO.  229 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment at the Frost Bridge Substation, in Watertown.  Staff Report.  Approved 3/27/89

PETITION NO.  230 - Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment, in Berlin.  Staff Report.  Approved 4/24/89

PETITION NO.  231HW - The United Industrial Services petition that no Certificate is required for proposed changes at its hazardous waste facility, in Meriden.  Staff Report.  Approved 4/24/89

PETITION NO.  232 - The United Illuminating Company petition for modification to an electric generating facility at Ansonia Copper & Brass, in Ansonia.  Staff Report.  Approved 5/15/89

PETITION NO.  233 - The Connecticut Light and Power Company petition for an addition to an existing 115-kV Substation on Stony Hill Road, in Brookfield.  Staff Report.  Approved 5/15/89

PETITION NO.  234 - Connecticut Light and Power Company and O’Brien Energy Systems, Inc. petition for the proposed 115-kV underground electric transmission line interconnecting the Hartford Steam Company Cogeneration Project and CL&P’s existing South Meadow-Southwest Hartford 115-kV line as a “transmission line tap”, in Hartford. Staff Report.  Approved 6/5/89

PETITION NO.  235 - Northeast Utilities Service Company petition for the proposed construction of an east access building at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 7/6/89

PETITION NO.  236 - Killingly Energy Limited Partnership (KELP) petition for a proposed interconnection line from the KELP facility to the Connecticut Light and Power Company electrical system, in Killingly.  Staff Report.  Approved 11/22/89

PETITION NO.  237 - The Connecticut Light and Power Company petition that General Statute 16-50z does not apply to electric substations.  Staff Report.  Approved 7/25/89

PETITION NO.  238 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment to Norwalk Substation, in Norwalk.  Staff Report.  Approved 10/3/89

PETITION NO.  239 - Metro Mobil petition to dismiss SNET Doc. 119 application without prejudice. Dismissed 11/22/89 (See Doc 119.)

PETITION NO.  240 - Metro Mobil petition to dismiss SNET Doc. 127 application without prejudice. Dismissed 11/22/89 (See Doc 127.)

PETITION NO.  241 - Aetna Life & Casualty Company petition to install four 1.25 MW emergency generators off Addison Road, in Windsor.  Staff Report.  Approved 3/12/90

PETITION NO.  242 - The Connecticut Light and Power Company petition for the proposed addition of a 69 to 27.6-kV transformer and associated equipment within Rockville Substation, in Vernon.  Staff Report.  Approved 12/13/89

PETITION NO.  243 - The United Illuminating Company petition for the proposed installation of four transmission shunt capacitor banks at substations in North Haven and New Haven.  Staff Report.  Approved 1/16/90

PETITION NO.  244 - Connecticut Natural Gas Corporation petition for a proposal to install, own, and operate a natural gas line in Bloomfield, West Hartford, and Hartford.  Findings of Fact.  Opinion.  Decision and Order.Approved 5/30/90

PETITION NO.  245 - The Connecticut Light and Power Company petition for modifications of a 115-kV transmission lines from its Barbour Hill Substation to Windsor Locks Junction, to Enfield Substation .   Staff Report.  Approved 2/26/90

PETITION NO.  246 - The Connecticut Light and Power Company petition for proposed modifications to the Frost Bridge-Stevenson 115-kV line in Watertown, Waterbury, Middlebury, Oxford, and Monroe.  Staff Report.  Approved 3/26/90

PETITION NO.  247 - The Connecticut Light and Power Company petition for proposed modifications to the Connecticut River crossing of the South Meadow-Manchester and South Meadow-East Hartford 115-kV transmission lines in Hartford, and East Hartford.  Staff Report.  Approved 3/26/90

PETITION NO.  248 - The Connecticut Light and Power Company petition for proposed modifications to the Montville-Dudley-Bean Hill 115-kV lines, in Montville and Norwich.  Staff Report.  Approved 2/25/91

PETITION NO.  249 - The Connecticut Light and Power Company petition for the proposed addition of a second 115-kV to 23-kV, 47 MVA transformer, and associated equipment within Hopewell 22R Substation, in Glastonbury.  Staff Report.  Approved 3/26/90

PETITION NO.  250 - The City of Norwich Department of Public Utilities petition for proposed modifications within the Tenth Street Substation, in Norwich.  Staff Report.  Approved 4/30/90

PETITION NO.  251 - Northeast Nuclear Energy Company petition for a steam generator replacement project building at Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/30/90

PETITION NO.  252 - The South Norwalk Electric Works petition for an electric generator at its State Street facility, in South Norwalk.  Staff Report.  Approved 5/21/90

PETITION NO.  253 - United Illuminating Company petition for a proposed addition at Pequonnock Substation, in Bridgeport.  Staff Report.  Approved 7/25/90

PETITION NO.  254 - Connecticut Yankee Atomic Power Company petition for the proposed reconstruction of a boat dock at Connecticut Yankee Nuclear Power Station, in Haddam.   Staff Report.  Approved 7/25/90

PETITION NO.  255 - The Connecticut Light and Power Company petition for a proposed addition to its 4C Substation, in Southington.  Staff Report.  Approved 8/22/90

PETITION NO.  256 - The Connecticut Light and Power Company petition for an addition to the 3R Substation, in Rocky Hill.  Staff Report.  Approved 8/22/90

PETITION NO.  257 - The Windham Energy Recovery Facility petition whether changes in operation would constitute a “modification” requiring a Certificate, in Windham. Voted not to Rule. 9/5/90

PETITION NO.  258 - The Connecticut Light and Power Company petition for proposed modifications to the Horton Cove Crossing of the Montville-Whipple Junction 115-kV transmission line, in Montville.  Staff Report.  Approved 9/26/90

PETITION NO.  259 - United Illuminating Company petition for temporary transformer installation project at Mix Avenue Substation, in Hamden.  Staff Report.  Approved 11/14/90

PETITION NO.  260 - Metro Mobile CTS of the Northeast, Inc., Metro Mobile CTS of Hartford, Inc., Metro Mobile CTS of New London, Inc., Metro Mobile CTS of New Haven, Inc., and Metro Mobile CTS of Fairfield County, Inc. petition to amend Section 16-50j-72 (c) of the Regulations of Connecticut State Agencies.  Staff Report.  Denied 11/14/90

PETITION NO.  261 - The Connecticut Light and Power Company petition for proposed modifications to the Glenbrook - South End - Waterside 115-kV transmission lines, in Stamford.  Staff Report.  Approved 11/14/90

PETITION NO.  262HW - Safety-Kleen Corp. petition for short-term storage of containerized hazardous waste on Community Avenue, in Plainfield.  Staff Report.  Approved 1/10/91

PETITION NO.  263 - The Connecticut Light and Power Company petition for modifications to the Sasco Creek Substation to Ely Avenue Junction 115-kV line, in Westport.  Staff Report.  Approved 2/15/91

PETITION NO.  264 - The Connecticut Light and Power Company petition for modifications to the Ely Avenue Junction of Glenbrook Substation 115-kV line, in Norwalk, Stamford, and Darien.  Staff Report.  Approved 3/11/91

PETITION NO.  265 - The Connecticut Light and Power Company petition for removal of 69-kV lattice towers in Rocky Hill, Cromwell, Berlin, and Middletown.  Staff Report.  Approved 2/11/91

PETITION NO.  266 - The Connecticut Light and Power Company petition for modifications to the Brookfield Junction to Stony Hill Substation 115-kV line, in Brookfield.  Staff Report.  Approved 3/11/91

PETITION NO.  267 - Northeast Nuclear Energy Company petition for two proposed Steam Generator Replacement Project Buildings at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/1/91

PETITION NO.  268 - The Connecticut Light and Power Company petition for a proposed addition to the Tomac Substation and an associated modification to a 115-kV transmission line, in Greenwich.  Staff Report.  Approved 4/18/91

PETITION NO.  269 - The Connecticut Light and Power Company petition for proposed modifications to Meekville Junction to South Windsor Junction 115-kV transmission line, in South Windsor.  Staff Report.  Approved 5/13/91

PETITION NO.  270HW - Ballast Disposal Incorporated petition for storage of fluorescent light ballasts and small electrical capacitors containing PCB’s, in Waterbury.   Staff Report.  Approved 5/13/91

PETITION NO.  271HW - Clean Harbors Inc. petition for a proposed transloading facility, in Plainfield. Withdrawn 7/24/91

PETITION NO.  272 - Northeast Utilities Service Company petition for proposed modifications to Barbour Hill Substation, Rockville Substation, and a 115-kV circuit from Barbour Hill Substation to Rockville Substation, in South Windsor and Vernon.  Staff Report.  Approved 7/16/91

PETITION NO.  273 - Yankee Gas Services Company petition for the proposed construction of natural gas regulating facilities associated with the Iroquois Gas Transmission System, L.P. sales meter station site at the intersection of Old Coram Road and Murphy’s Lane, in Shelton.  Staff Report.  Approved 7/31/91

PETITION NO.  274 - The Connecticut Light and Power Company petition for proposed modifications at two pole locations east of Circle Drive and two pole locations west of the intersection of Route 5 and Route 71, in conjunction with connecting the new Colony Substation to and existing CL&P Hanover to North Wallingford 115-kV transmission line, in Wallingford. Approved 9/18/91

PETITION NO.  275 - The Connecticut Light and Power Company petition for proposed modification at four pole locations, along two existing 115-kV transmission lines from Manchester Substation to Northwest Hartford Substation and Bloomfield Substation to Northwest Substation (circuits 1751 and 1756), west of Goodman Street and Lincoln Terrace on Cottage Grove Road, in Bloomfield.  Staff Report.  Approved 9/18/91

PETITION NO.  276 - Northeast Utilities Service Company petition for a transmission line interconnection between the Lisbon Resource Recovery facility, located on a 276 acre parcel owned by Philip C. Armetta, approximately 1,000 feet east of the intersection of Route 97 and 169, and an existing Connecticut Light and Power Company 115-kV electrical transmission line, in Lisbon.  Staff Report.  Approved 6/23/92

PETITION NO.  277 - The Connecticut Light and Power Company petition for the removal of unused 69-kV lattice steel towers along nine miles of right-of-way, in Thomaston and Litchfield.  Staff Report.  Approved 11/20/91

PETITION NO.  278 - Northeast Utilities Service Company and the City of Groton Department of Utilities petition for proposed modifications to existing 69-kV transmission lines and substations, in Montville, Ledyard, Preston, and Groton.  Staff Report.  Approved 1/6/92

PETITION NO.  279 - The Connecticut Light and Power Company petition for proposed modifications to a 115-kV transmission line from the Branford Substation to the North Haven Substation, in North Branford.  Staff Report.  Approved 12/11/91

PETITION NO.  280 - The United Illuminating Company petition for the proposed Bridgeport Viaduct Transmission Line Relocation Project, in Bridgeport.  Staff Report.  Approved 10/28/92

PETITION NO.  281 - Northeast Utilities Service Company petition for proposed modifications to the southwest Hartford-northwest Hartford 115-kV underground electric transmission line, for the Connecticut Department of Transportation to realign Route 44 (Albany Ave.) and Scarborough Street, in Hartford.  Staff Report.  Approved 4/1/92

PETITION NO.  282 - Concerned Citizens of Lisbon petition regarding wether the Certificate issued in Docket 110 to the Lisbon Resource Recovery facility, in Lisbon, remains applicable. Certificate remains applicable. 7/15/92

PETITION NO.  283 - Metro Mobile CTS of Hartford, Inc. petition for the installation of telecommunications antennas and other equipment on top of an existing building located at 155 Myrtle Street, in New Britain.  Staff Report.  Approved 6/23/92

PETITION NO.  284 - Metro Mobile CTS of Fairfield County, Inc. petition for the installation of cellular telecommunications antennas and associated equipment on an existing water tank located at 177 West Rocks Road, in Norwalk.  Staff Report.  Approved 7/15/92

PETITION NO.  285 - The Connecticut Light and Power Company (CL&P) petition for the proposed modification of an existing CL&P 345-kV line adjacent to the New Milford landfill west of Route 7, in New Milford.  Staff Report.  Approved 9/4/92

PETITION NO.  286 - The Connecticut Light and Power Company petition for proposed modifications to one 345-kV and one 115-kV line along Interstate Highway 291, in South Windsor and Manchester.  Staff Report.  Approved 9/4/92

PETITION NO.  287HW - Connecticut Treatment Corporation petition for proposed improvements at an existing hazardous waste facility located on Broderick Road, in Bristol.  Staff Report.  Approved 9/16/92

PETITION NO.  288 - Metro Mobile CTS of New Haven, Inc. petition for the installation of telecommunications antennas and associated equipment to a building at 20 Alexander Dr., in Wallingford.  Staff Report.  Approved 9/18/92

PETITION NO.  289 - The Connecticut Yankee Atomic Power Company petition for the proposed construction of a warehouse within the developed area of the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 9/9/92

PETITION NO.  290 - The United Illuminating Company (UI) petition for reconductoring and reinsulating approximately 1.4 miles of 115-kV double circuit overhead transmission line situated along the northeast corridor railroad tracks from UI’s Milvon Substation to Devon Substation, in Milford.  Staff Report.  Approved 9/9/92

PETITION NO.  291 - The United Illuminating Company petition for the installation of an optical fiber ground wire system between Ash Creek Substation in Bridgeport and structure No. B714 on the railroad catenary system of the Northeast Railroad Corridor, in Fairfield.  Staff Report.  Approved 9/9/92

PETITION NO.  292 - Springwich Cellular Limited Partnership petition that no Certificate is required for the installation of cellular telecommunications antennas on top of the Southern New England Telephone Company building at 27 Butler Street,  in Meriden.  Staff Report.  Approved 10/14/92

PETITION NO.  293 - The Town of Middlefield petition prohibiting the Department of Public Safety, Division of State Police, or any agents of the State Police, from the construction, maintenance, and operation of a telecommunications tower atop Mount Beseck, in Middlefield. Denied 10/14/92

PETITION NO.  294HW - United Oil Recovery, Inc. petition for proposed improvements and activities to a facility located at 136 Gracey Avenue, in Meriden.  Staff Report.  Approved 12/2/92

PETITION NO.  295 - The United Illuminating Company petition for proposed modifications to the existing Derby Substation Rebuild Project located at Roosevelt Drive near the intersection of B Street, Derby, and to the existing Ansonia Substation, at 24 Franklin Avenue, Ansonia.  Staff Report.  Approved 12/16/92

PETITION NO.  296 - The Connecticut Light and Power Company petition for proposed modifications to a 115-kV transmission line located between the Rocky Hill Substation on West Street, Rocky Hill to the Berlin Substation on Beckley Road, in Berlin.  Staff Report.  Approved 12/2/92

PETITION NO.  297 - The Connecticut Light and Power Company petition for proposed modifications of the Devon Substation to Pease Road Junction 115-kV transmission line,  in Milford, Orange and Woodbridge.  Staff Report.  Approved 2/25/93

PETITION NO.  298 - Springwich Cellular Limited Partnership petition for the installation of telecommunications antennas at 52 East Center Street, in Manchester.  Staff Report.  Approved 2/11/93

PETITION NO.  299 - The United Illuminating Company petition for proposed modifications to an existing control/switchgear building at 324 Woodmont Road, in Milford.  Staff Report.  Approved 3/4/93

PETITION NO.  300 - The Northeast Utilities Service Company petition for a proposed office building at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/7/93

PETITION NO.  301 - The Northeast Utilities Service Company petition for a proposed fire training facility at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/7/93 .

PETITION NO.  302 - The Connecticut Resources Recovery Authority petition for proposed changes in facility design, transfer of the Certificate, and compliance with conditions for waste fuel to the Lisbon Resource Recovery Facility, in Lisbon. Denied 4/22/93

PETITION NO.  303 - The Northeast Utilities Service Company petition for proposed modifications to the Baldwin Junction to Stevenson Substation 115-kV lines, in Middlebury.  Staff Report.  Approved 5/6/93

PETITION NO.  304 - Metro Mobile CTS of Fairfield County, Inc. petition for proposed installation of antennas on an existing water tank and construction of an equipment building off Black Rock Turnpike, in Fairfield. Approved 5/6/93

PETITION NO.  305 - Metro Mobile CTS of Fairfield County, Inc. petition for proposed installation of antennas on an existing water tank and construction of an equipment building off Filbert Street, in Norwalk.  Staff Report.  Approved 5/6/93

PETITION NO.  306 - Metro Mobile CTS of Hartford, Inc. petition for proposed installation of antennas and associated equipment on an existing building at 129 Coles Road, in Cromwell.  Staff Report.  Approved 6/8/93

PETITION NO.  307 - Metro Mobile CTS of Hartford, Inc. petition for proposed installation of antennas and an equipment room within the American School for the Deaf, 139 North Main St., in West Hartford.  Staff Report.  Approved 8/23/93

PETITION NO.  308 - Springwich Cellular Limited Partnership petition for a declaratory ruling that no Certificate is required for the replacement of an existing communications tower and equipment building and for the installation of cellular antennas on the replacement tower located in Oxford.  Staff Report.  Approved 6/6/94

PETITION NO.  309 - Connecticut Resource Recovery Authority petition for rulings concerning the notice of intent to commence construction filed by Riley Energy Systems of Lisbon, Inc.  Staff Report.  Council felt issues raised by CRRA were moot given Council action dated 10/4/93. 10/20/93

PETITION NO.  310HW - Safety-Kleen Corporation petition for a declaratory ruling that no Certificate is required for proposed changes at its existing facility located at 24 Brixton Street, in West Hartford, (March 17, 1997).  Staff Report.  Approved 4/2/97

PETITION NO.  310HW - Safety-Kleen Corp., petition that no Certificate is required for proposed changes at its existing facility located at 24 Brixton Street, in West Hartford.  Approved 7/14/93 5/10/95 5/4/96

PETITION NO.  311 - Metro Mobile petition that no Certificate is required for the proposed installation of antennas on an existing wind power tower at 80 Lonetown Road, in Redding.  Staff Report.  Approved 11/9/93

PETITION NO.  312 - Iroquois Gas Transmission System and Iroquois Pipeline Operating Company petition for construction of a lateral line from the Iroquois main line to the Connecticut Light and Power Company Devon Generating Station, in Milford.  Staff Report.  Approved 1/12/94

PETITION NO.  313 - Northeast Utilities Service Company petition for proposed addition of gas-firing capability at Devon Station Units 7 and 8, in Milford.  Staff Report.  Approved 1/12/94

PETITION NO.  314 - Springwich cellular Limited Partnership petition for installation of a new monopole and cellular antennas at an existing tower site off Willis Street, in Bristol.  Staff Report.  Approved 12/15/93

PETITION NO.  315 - Northeast Utilities Service Company petition for proposed additions to the Uncasville Substation off Haley Road, in Montville.  Staff Report.  Approved 1/12/94

PETITION NO.  316 - Springwich Cellular Limited Partnership petition for the proposed addition of antennas to an existing tower at 975 Mix Avenue, in Hamden.  Staff Report.  Approved 1/12/94

PETITION NO.  317 - City of Norwich Department of Public Utilities petition for replacement of equipment at Dudley Street Substation, in Norwich.  Staff Report.  Approved 3/11/94

PETITION NO.  318 - Metro Mobile CTS of Hartford, Inc. petition for installation of panel antennas on a steel pole at 133 Coles Road, in Cromwell.  Staff Report.  Denied 4/18/94

PETITION NO.  319 - Metro Mobile CTS of New Haven, Inc. petition for installation of cellular antennas, support pole and associated equipment off Route 8 on land owned by the Hamden Sand and Gravel Company, in Beacon Falls.  Staff Report.  Denied 4/18/94

PETITION NO.  320 - Metro Mobile CTS of New Haven, Inc. petition for the installation of cellular antennas, support pole, and associated equipment at 921 East Main Street, in Meriden.  Staff Report.  Approved 4/18/94

PETITION NO.  321 - Metro Mobile CTS of Hartford, Inc., Metro Mobile CTS of Fairfield County, Inc., Metro Mobile CTS of New Haven, Inc., Metro Mobile CTS of New London, Inc., and Metro Mobile CTS of Windham, Inc., petition for a declaratory ruling that a low-power microcell installed completely within an existing building is not subject to Council jurisdiction.  Staff Report (with Petition 323 Staff Report).  Approved 9/19/94

PETITION NO.  322 - Metro Mobile CTS of Hartford, Inc. petition for installation of cellular antennas, support pole, and associated equipment at 133 Coles Road,  in Cromwell.  Staff Report.  Approved 5/23/94

PETITION NO.  323 - Metro Mobile CTS of Hartford, Inc. and Metro Mobile CTS of Fairfield County, Inc. petition for installation of low-power microcells completely within existing Bell Atlantic Stores at 71 Newtown Road, in Danbury; 82 Buckland Street, in Manchester; and at 48 Westport Ave, in  Norwalk.  Staff Report (with Petition 321 Staff Report).  Approved 6/6/94

PETITION NO.  324 - Metro Mobile CTS of Hartford, Inc. petition for proposed installation of cellular antennas on an existing building at 886 Main, in East Hartford.  Staff Report.  Approved 8/9/94

PETITION NO.  325 - Metro Mobile CTS of Hartford, Inc. petition for proposed installation of antennas on an existing building at 590 Asylum Street, in Hartford.  Staff Report.  Approved 8/9/94

PETITION NO.  326 - Springwich Cellular Limited Partnership petition to replace an existing tower and install antennas on the replacement tower at the University of Connecticut Health Center, 263 Farmington Avenue,  in Farmington.  Staff Report.  Approved 7/26/94

PETITION NO.  327 - Metro Mobile CTS of Hartford, Inc., petition for a declaratory ruling on the need to obtain a Certificate of Environmental Compatibility and Public Need is required for the proposed installation of cellular antennas and associated equipment on an existing chimney stack on a building located at 2 Ferry Place, in Old Saybrook.  Staff Report.  Approved 8/9/94

PETITION NO.  328 - Metro Mobile CTS of Hartford, Inc., petition for a declaratory ruling on the need to obtain a Certificate for the proposed installation of cellular antennas and associated equipment on and adjacent to an existing repair/office building located at Pilot’s Point Marina, South Yard, Building #4, 63 Pilot’s Point Drive, in Westbrook.  Staff Report.  Approved (No Certificate Required) 8/9/94

PETITION NO.  329 - Metro Mobile CTS of New Haven, Inc., petition for a declaratory ruling that no Certificate is required for the proposed installation of cellular telephone antennas and associated equipment on an existing building located at 153 Forbes Avenue, in New Haven.  Staff Report.  Approved 8/30/94

PETITION NO.  330 - Metro Mobil CTS of New Haven petition for the installation of a microcell in a communications store, in Orange. Withdrawn 9/21/94

PETITION NO.  331 - Northeast Utilities Service Company petition for proposed modifications to existing transmission line towers at the Thames River in Montville, and at the Housatonic River in the Towns of Stratford and Milford.  Staff Report.  Approved 10/20/94

PETITION NO.  332HW - Envirite Corporation petition for a declaratory ruling that Approved of Public Safety and Necessity is required for certain changes at its existing facility located at 198 Old Waterbury Road, in Thomaston.  Staff Report.  Approved 11/1/94

PETITION NO.  333 - Metro Mobile CTS of Fairfield County, Inc. petition for a declaratory ruling that no Certificate is required for the installation of cellular telecommunications antennas and equipment on an existing five-story storage/warehouse building located at 370 West Main Street, in Stamford.  Staff Report.  Petition not CSC Jurisdiction -  10/20/94

PETITION NO.  334 - Metro Mobile CTS of Fairfield County, Inc. petition for proposed installation of cellular antennas and equipment on the Danbury Hilton Hotel at 18 Old Ridgebury Road, in Danbury. Decision  Staff Report.  Approved 10/20/94

PETITION NO.  335 - Department of Public Safety, Division of State Police petition for the proposed replacement of an existing tower at 76 Tower Road,  in Brookfield.  Staff Report.  Denied 10/28/94

PETITION NO.  336 - Northeast Utilities Service Company petition for proposed modifications to the Black Pond Junction to Connecticut Yankee 345-kV line, in Haddam.  Staff Report.  Approved 12/5/94

PETITION NO.  337 - The Connecticut Light and Power Company petition for modifications to existing 115-kV transmission lines at Stony Hill Substation, in Brookfield.  Staff Report.  Approved 2/9/95

PETITION NO.  338HW - Logano Transportation Company, Inc. petition for a declaratory ruling that no Certificate is required for a proposed recycling facility at 203 Pickering Street, in Portland.  Staff Report.  Approved 4/25/95

PETITION NO.  339 - The Connecticut Light and Power Company petition that no Certificate is required for placement of a fiber optic shield wire and certain structural changes along several 115-kV and 345-kV transmission corridors in Connecticut.  Staff Report.  Approved 7/6/95

PETITION NO.  339A - Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in the Towns of Berlin, Bethany, Cheshire, Hamden, Meriden, Milford, Orange, Wallingford, and Woodbridge, Connecticut. Request for Amendment.  Staff Report.  Approved 4/2/98

PETITION NO. 339B - Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in the City of Norwalk, and Towns of Middletown and Berlin.   Staff Report.  Approved 10/8/98

PETITION NO. 339C - Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in Connecticut.  Staff Report.Approved 12/17/98

PETITION NO. 339D - Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in Connecticut.  Staff Report.  Approved 4/25/02

PETITION NO.  340 - The Connecticut Light and Power Company petition that no Certificate is required for the proposed modifications to the 115-kV lines between South End Substation and Glenbrook Substation, in Stamford.  Staff Report.  Approved 7/6/95

PETITION NO.  341HW - Logano Transportation Co., Inc., petition that no Certificate is required for short-term storage of fluorescent light ballasts and small electrical capacitors at its existing facility located at 203 Pickering Street, in Portland.  Staff Report.  Approved 6/20/94

PETITION NO.  342 - Arlene Barra petition for a declaratory ruling regarding the Council’s acknowledgment of a notice of intent to modify an existing telecommunications tower and associated equipment at 76 Tower Road, in Brookfield.  Findings of Fact.   Opinion.  Withdrawn 11/14/95

PETITION NO.  343 - Springwich Cellular Ltd. Partnership petition that no Certificate is required for the replacement of an existing communications tower and for the installation of cellular antennas on the replacement tower located at 55 Walls Drive, in Fairfield.  Staff Report.  Approved 10/10/95

PETITION NO.  344 - CL&P petition that no Certificate is required for a proposed addition to the CL&P’s Canton Substation, in Canton. Council Decision and Staff Report    Approved 11/15/95

PETITION NO.  345 - The Connecticut Light and Power Company petition that no Certificate is required for a proposed rebuild of Connecticut Light and Power Company’s Compo Substation, in Westport.  Opinion.  Approved 2/8/86

PETITION NO.  346 - The Connecticut Light and Power Company petition that no Certificate is required for a proposed temporary installation of a mobile transformer and associated equipment in the Sasco Creek Substation, in Westport. Staff Report.  Approved 2/8/86

PETITION NO.  347 - The Connecticut Light and Power Company petition for proposed modifications to the Cook Hill Junction to Wallingford Junction 115-kV-transmission line in the Towns of Cheshire and Wallingford.  Staff Report.  Approved 3/13/96

PETITION NO.  348 - The Connecticut Light and Power Company petition for proposed modifications to the Cook Hill Junction to Glen Lake Junction 115-kV transmission line, in Cheshire and Hamden.  Staff Report.  Approved 3/13/96

PETITION NO.  349 - The Connecticut Light and Power Company petition for the modification to the 115 kV lines beween North Wallingford Substation and Schwab Junction, in Wallingford.  Staff Report.  Approved 3/13/96

PETITION NO.  350 - Cellco Partnership petition that for the construction of an upgraded telecommunications tower at the Groton Police Headquarters, Groton Long Point Road, in Groton.  Staff Report.  Denied 3/28/96

PETITION NO.  351 - The Connecticut Light and Power Company petition for proposed modifications to the Barbour Hill to Enfield 115-kV line, in East Windsor.  Staff Report.  Approved 5/9/96

PETITION NO.  352 - The Connecticut Light and Power Company petition that no Certificate is required for the emergency installation of four gas turbine generating units at Devon Station, in Milford.  Staff Report 1.   Staff Report 2.  Findings of Fact.  Opinion.  Decision & Order.  Approved 6/30/97

PETITION NO.  353 - The Minnesota Methane, L.L.C. petition that no Certificate is required for a 1630 kW electric generating unit powered by landfill gas to be located adjacent to the Yaworski Regional Sanitary Landfill, in Canterbury.  Findings of Fact.  Opinion.  Decision & Order.  Denied 8/28/96

PETITION NO.  354 - The Connecticut Light and Power Company petition that no Certificate is required for the emergency installation of one gas turbine generating unit, a step-up power transformer, and a 115-kV tap to the South Meadow-Bloomfield transmission line at South Meadow Station, in Hartford.  Staff Report.  Findings of Fact.  Opinion.  Decision & Order.  Approved 5/21/96 Reopen Record 6/30/97

PETITION NO.  355 - Cellco Partnership d/b/a Bell Atlantic NYNEX Mobile petition that no Certificate is required for the installation of certain telecommunications antennas, the construction of a second equipment building and the installation of an emergency generator and fuel tank at BANM’s existing telecommunications facility on land of the Connecticut Water Company, off South Street, in Vernon.  Staff Report.  Approved 6/18/96

PETITION NO.  356 - The United Illuminating Company petition that no Certificate is required for the relocation and change of ten transmission line towers on the existing Pequonnock to Ash Creek and Pequonnock to Darien 115-kV lines to accommodate an I-95 highway reconstruction project, in Bridgeport.  Staff Report.  Approved 7/2/96

PETITION NO.  357 - The Connecticut Light and Power Company petition that no Certificate is required for the proposed addition of gas-firing capability to CL&P’s Middletown Station, in Middletown.  Staff Report.  Approved 8/8/96

PETITION NO.  358 - The Connecticut Light and Power Company petition that no Certificate is required for proposed modification to existing transmission line towers in Hartford and East Hartford.  Staff Report.  Approved 8/8/96

PETITION NO.  359 - The Connecticut Light and Power Company petition that no Certificate is required for proposed modifications to the East New Britain - Newington - Farmington 115-kV electric transmission line, in Newington.  Staff Report.Approved 9/9/96

PETITION NO.  360 - Minnesota Methane, L.L.C. petition that no Certificate is required for a 1630-kW electric generating unit to be powered by landfill gas located adjacent to the Town of Manchester Landfill, in Manchester.  Staff Report.  Approved 9/30/96

PETITION NO.  361 - CL&P petition that no Certificate is required for the modification of one structure located off Jobs Hill Road, in Somers, on the Ludlow, Massachusetts to Meekville Junction 345-kV electric transmission line.  Staff Report.  Approved 11/21/96

PETITION NO.  362 - CL&P petition that no Certificate is required for the modification of a 115-kV electric transmission line extending from North Bloomfield Substation to the Silver and Agawam Substations, in Agawam, Massachusetts.  Staff Report.  Approved 1/22/97

PETITION NO.  363 - The Connecticut Light and Power Company petition that no Certificate is required for proposed additions to CL&P's Southington Substation, in Southington.  Staff Report.  Approved 11/21/96

PETITION NO.  364 - CL&P petition that no Certificate is required for proposed additions to the CL&P’s Montville Substation, in Montville.  Staff Report.  Approved 11/21/96

PETITION NO.  365 - CL&P petition that no Certificate is required for proposed additions to the CL&P’s Manchester Substation, in Manchester.  Staff Report.  Approved 11/21/96

PETITION NO. 366 - Central Connecticut State University (CCSU) petition that no Certificate is required to modify an existing rooftop tower on the top of Vance Hall within the CCSU Campus, in New Britain.  Staff Report.  Approved 11/21/96

PETITION NO.  367 - Connecticut Light and Power Company (CL&P) petition that no Certificate is required for a proposed addition to CL&P’s Glenbrook Substation, in Stamford.  Staff Report.  Approved 2/5/97

PETITION NO.  368 - Connecticut Light and Power Company (CL&P) petition that no Certificate is required for a proposed addition to CL&P’s Frost Bridge Substation, in Watertown.  Staff Report.  Approved 2/5/97

PETITION NO. 369 - Connecticut Light and Power Company (CL&P) petition that no Certificate is required for a proposed addition to CL&P’s Waterside Substation, in Stamford.  Staff Report.  Approved 2/5/97

PETITION NO.  370 - CL&P petition that no Certificate is required for a proposed addition to CL&P’s Darien Substation, in Darien.  Staff Report.  Approved 2/5/97

PETITION NO.  371 - Sprint PCS petition that no Certificate is required for proposed modifications to the Manchester-North Bloomfield-Northwest Hartford High voltage transmission line, in Windsor.  Staff Report.  Approved 4/23/97

PETITION NO.  372HW - Uniroyal Chemical Company petition for a declaratory ruling that no Certificate is required for changes to the existing Uniroyal Chemical facility, in Naugatuck. Staff Report.  Approved 6/3/97

PETITION NO.  373 - The Connecticut Light and Power Company petition that no Certificate is required for proposed modifications to the Wawecus Junction to Bean Hill 115-kV lines, in Norwich.  Staff Report.  Approved 6/16/97

PETITION NO.  374 - Cellco Partnership d/b/a Bell Atlantic NYNEX Mobile petition that no Certificate is required for the modification of an existing telecommunications facility at an Amoco gasoline station, 921 East Main Street, in Meriden. Staff Report.  Approved 6/16/97

PETITION NO.  375 - Cellco Partnership d/b/a Bell Atlantic NYNEX Mobile petition that no amendment to the Certificate (Docket No. 139) is required to accommodate tower sharing at an existing telecommunications facility located off of Forbes Street, in East Hartford.  Staff Report.  Approved  6/16/97

PETITION NO.  376 - Hamilton Standard Division of United Technology Corporation (Hamilton Standard) petition that no Certificate is required for modification of an existing emergency generating system at Hamilton Standard’s Data Center, in Windsor Locks.  Staff Report.  Approved 6/30/97

PETITION NO.  377 - The United Illuminating Company (UI) petition that no Certificate is required for modifications to United Illuminating’s Bridgeport Harbor Station for constructing a 520 MW combined cycle gas turbine generating project, in Bridgeport.  Findings of Fact.  Opinion.  Decision & Order  Site Ownership Changed and Council Acknowledgement  Approved 8/6/97

PETITION NO. 377A - Bridgeport Energy, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the approval modification in Petition No. 377 for the existing Bridgeport Harbor Station 520 MW combined cycle gas turbine generating facility, in Bridgeport, Connecticut.  RecordFindings of FactOpinionDecision and Order  Site Ownership Changed and Council Acknowledgement  Approved 4/28/11.

PETITION NO.  378 - Aetna Life Insurance Company petition that no Certificate is required for the installation of emergency generating devices at their offices at 1000 Middle Street, in Middletown, and 570 Pigeon Hill Road, in Windsor.  Staff Report.  Approved 7/16/97.  Approved modification 12/19/00.  Amendment Approved 03/13/07.

PETITION NO.  379 - Northeast Utilities Service Company petition that no Certificate is required for the proposed removal and replacement of the Unit 1 oil, diesel, and jet fuel tank facility at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Conditionally Approved 8/20/97

PETITION NO.  380HW - Logano Transportation Co., Inc. petition that no Certificate is required for the management of hazardous and non-hazardous wastes in approved DOT containers to a transfer facility located at 203 Pickering Street, in Portland.  Staff Report.  Approved 9/10/97

PETITION NO.  381 - Southern Connecticut Gas Company petition that no Certificate of Environmental Compatibility and Public Need is required for a distribution line to transport natural gas to the Bridgeport Harbor Station.  Findings of Fact.   Opinion.   Decision & Order.  Approved 11/12/97

PETITION NO.  382HW - Advanced Environmental Technical Services (AETS) petition that no Certificate of Public Safety and Necessity is required for short-term storage of hazardous waste at 60 Peter Court, in New Britain.  Staff Report.  Approved 11/19/97

PETITION NO.  383 - Sprint PCS petition that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to a Connecticut Light and Power (CL&P) 115-kv electric transmission line support structure, in Fairfield.  Staff Report.  Findings of Fact.  Opinion.  Decision & Order.  Approved 12/18/97

PETITION NO.  384 - Sprint PCS petition regarding the applicability of Connecticut General Statutes § 16-50i (a).  Opinion.  Denied 12/10/97

PETITION NO.  385 - The Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for the proposed temporary installation of a transmission line tap, mobile transformer, and associated equipment on the south side of an existing electric transmission line approximately 1500 feet west of Hopmeadow Street, in Simsbury.  Staff Report.  Approved 1/8/98

PETITION NO.  386 - Sprint Spectrum L.P. d/b/a Sprint PCS petition that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to a Connecticut Light and Power Company high-voltage electric transmission line support structure (#924) located approximately 800 feet east of the intersection of Timber Mill Lane and Weston Road (Rt. 57), in Weston.  Staff Report.  Findings of Fact.  Opinion and Decision & Order.  Approved 1/22/98

PETITION NO.  387 - Cellco Partnership d/b/a Bell Atlantic Mobile petition for declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required to replace an existing telecommunications tower and accommodate tower sharing located at 281 Woodhouse Road, in Fairfield.  Staff Report.  Approved 3/16/98

PETITION NO.  388 - The Town of Wallingford petition that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the Electric Division’s East Street (13M) Substation, in Wallingford.  Staff Report 1.   Staff Report 2.  Approved 4/2/98

PETITION NO.  389 - Iroquois Gas Transmission System, L.P. Petition that no Certificate of Environmental Compatibility and Public Need is required for an extension to the Iroquois natural gas pipeline in Shelton and Stratford, Connecticut. Decision.   Staff Report.  Approved 4/9/98

PETITION NO. 390 - Southern New England Telephone (SNET) Personal Vision Petition for a Declaratory Ruling and/or notice to modify an existing facility site for the placement of additional telecommunications antennas located at Five West Service Road, Hartford, Connecticut.  Staff Report.  Approved 7/23/98

PETITION NO.  391 - United Illuminating Company Petition that No Certificate of Environmental Compatibility and Public Need is necessary to replace certain structures on United Illuminating’s 115-kV Mix-Glen Lake overhead transmission line located in Hamden, Connecticut.  Staff Report.  Approved 5/28/98

PETITION NO. 392 - Algonquin Gas Transmission Company Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to install a 1.5 mile extension of Algonquin Gas Transmission Company’s E-System Loop located in Norwich and Montville, Connecticut.  Staff Report.  Approved  6/11/98

PETITION NO. 393 - Sprint PCS Petition that no Certificate of Environmental Compatibility and Public Need is required to modify an existing electric transmission line structure located adjacent to 63 Myrtle Avenue, Stamford, Connecticut.  Staff Report.  Approved  6/25/98

PETITION NO. 394 - Springwich Cellular Limited Partnership (Springwich) Petition for a Declaratory Ruling that no Amendment to the Certificate of Environmental Compatibility and Public Need is required to replace the existing tower and expand the site boundaries to accommodate tower sharing at an existing telecommunications facility located on 20 Post Office Lane in Westport, Connecticut. Staff Report.  Findings of Fact.   Opinion.   Decision & Order.  Approved 8/25/98

PETITION NO. 395 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#2997), located in the parking lot of the Wilton Railroad Station near the intersection of Route 7 and Route 33 in Wilton, Connecticut.  Staff Report.  Approved 7/9/98

PETITION NO. 395A - T-Mobile Northeast LLC (T-Mobile) request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to relocate an existing T-Mobile facility attached to an Eversource electric transmission line structure (#2997) onto an approved replacement electric transmission line structure (#2997) within the existing Eversource right-of-way located in the parking lot of the Wilton Railroad Station near the intersection of Route 7 and Route 33 (Old Station Road a/k/a 15 Old Danbury Road) in Wilton, Connecticut. Approved 09/15/16

PETITION NO. 396 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#6076) located near the intersection of Route 161 and I-95 (Exit 74) off of King Arthur Drive, East Lyme, Connecticut.  Staff Report.  Approved 7/9/98

PETITION NO. 397 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#1041) located off of Noroton Road to Heights Road, near the Noroton Heights Railroad Station in Darien, Connecticut.  Staff Report.  Approved 7/9/98

PETITION NO. 398 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#2983) located off of Route 7 and Pimpewauge Road in Wilton, Connecticut.  Staff Report.  Approved 7/23/98

PETITION NO. 399 - Sprint PCS Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to a Connecticut Light and Power (CL&P) 115-kV electric transmission line support structure no. 1281 located off of Sound Shore Drive in Greenwich, Connecticut.  Staff Report.  Approved 7/23/98

PETITION NO. 400 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to a Connecticut Light and Power (CL&P) high voltage transmission line structure located off Rocky Hill Road in Trumbull, Connecticut.  Staff Report.  Approved 7/23/98

PETITION NO. 401 - Hartford Steam Company Petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for replacement of two gas turbines with one gas turbine and an auxiliary boiler at the Hartford Hospital cogeneration facility, Hartford, Connecticut.  Staff Report.  Approved 9/24/98

PETITION NO. 402 - Cellco Partnership d/b/a Bell Atlantic Mobile Petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need (Docket No. 89) is required to replace the existing tower and expand the site boundaries to accommodate tower sharing at an existing telecommunications facility located at the Interstate 84-Route 34 interchange in Newtown, Connecticut.  Staff Report.  Approved 9/24/98

PETITION NO. 403 - Sprint PCS Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the placement of a Fort Worth Tower Power Mount telecommunications pole on an existing Connecticut Light & Power high-voltage electric transmission line support structure located off of Pent Road in Beacon Falls, Connecticut.  Staff Report.  Approved 11/5/98

PETITION NO. 404 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#2384) located off of Johnson Road at the Oak Lane Country Club Association in Woodbridge, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 405 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#1321) located off of Chapel Road in Stratford, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 406 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#860) located off of Oxbrook Road and Travis Drive in Bridgeport, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 407 - Connecticut Light & Power Company Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications at the Norwalk substation located on New Canaan Avenue in Norwalk, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 408 - United Illuminating Company Petition that no Certificate of Environmental Compatibility and Public Need is required for modifications to the Hawthorne Substation facility in Fairfield, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 409 - CoxCom, Inc. d/b/a Cox Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for two earth station satellite dish antennas at 170 Utopia Road in Manchester, Connecticut.  Staff Report.  Approved 2/7/99

PETITION NO. 410 - Hull Forest Products, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction and operation of a 1,200 kW electric generating facility to replace two backup generators located at an existing sawmill plant in Pomfret, Connecticut.  Staff Report.  Approved 3/24/99

PETITION NO. 411 - Springwich Cellular Limited Partnership petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure located off 155 Harvest Ridge Road in Stratford, Connecticut. Decision.Staff Report.  Approved 7/29/99

PETITION NO. 412 - Springwich Cellular Limited Partnership petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure located off 17 Daybreak Lane in Shelton, Connecticut.  Decision Letter and Staff Report  Approved 3/24/99

PETITION NO. 413 - Iroquois Gas Transmission System, L.P. petition that no Certificate of Environmental Compatibility and Public Need is required for the installation of ground beds adjacent to the existing natural gas pipeline located in the Towns of Sherman and Shelton, Connecticut.  Staff Report.  Approved 7/15/99

PETITION NO. 414 - Comcast Cable Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a receive-only satellite dish antenna on the roof of an existing building located at 630 Chapel Street in New Haven, Connecticut.  Staff Report.  Approved 4/27/99

PETITION NO. 415 - Lake Road Generating Company, L.P. petition that no Certificate of Environmental Compatibility and Public Need is required for the installation of the proposed electric interconnection transmission line tap with an existing 345 kV Card Street-Sherman Road electric transmission line in Killingly, Connecticut.  Staff Report.  Approved 5/24/99

PETITION NO. 416 - Algonquin Gas Transmission Company petition that no Certificate of Environmental Compatibility and Public Need is required for the 1.8 mile extension of the proposed electric interconnection interstate natural gas transmission line in the Towns of Putnam and Killingly, Connecticut.  Staff Report 1.   Staff Report 2.  Approved 7/23/99, Reconsidered 8/16/99

PETITION NO. 417HW - Circle of Life, LLC petition that no Certificate of Public Safety and Necessity is required to treat non-RCRA/non-hazardous contaminated soils at its facility located at 158 Middletown Avenue in New Haven, Connecticut.  Staff Report.  Approved 5/25/99

PETITION NO. 418 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for temporary placement of meter-reading equipment in the Town of Stratford, Connecticut.  Staff Report.  Approved 7/15/99

PETITION NO. 419 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power high-voltage electric transmission line support structure located on Chestnut Hill Road in Wilton, Connecticut.  Staff Report.  Approved 7/15/99

PETITION NO. 420 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power high-voltage electric transmission line support structure located off Mechanic Street in Darien, Connecticut.  Staff Report.  Approved 7/15/99

PETITION NO. 421 - Bell Atlantic Mobile petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a telecommunications tower disguised as an agricultural silo located at Lockwood Farm in Hamden, Connecticut.  Staff Report.  Denied 7/15/99

PETITION NO. 422 - Wisvest-Connecticut, LLC petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a new electrical switchyard at Bridgeport Harbor Station in Bridgeport, Connecticut.  Staff Report.  Approved 8/16/99

PETITION NO. 423 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power high-voltage electric transmission line support structure located between Maple Ridge Road and New Britain Avenue in Farmington, Connecticut.  Staff Report.  Approved 8/16/99

PETITION NO. 424 - Wisvest-Connecticut, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of an electrical switchyard at New Haven Harbor Station, 1 Waterfront Street in New Haven, Connecticut.  Staff Report.  Approved 8/16/99

PETITION NO. 425 - City of Norwich Department of Public Utilities petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for an upgrade of equipment at the Dudley Street Substation located on Dudley Street in Norwich, Connecticut.  Staff Report.  Approved 8/31/99

PETITION NO. 426HW - Uniroyal Chemical Company, Inc. petition that no Certificate of Public Safety and Necessity is required to close certain hazardous waste container storage areas and refurbish a hazardous waste storage building located at 280 Elm Street in Naugatuck, Connecticut.  Staff Report.  Approved 8/31/99

PETITION NO. 427 - Aetna Life Insurance Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of emergency back-up electric generating devices at the Aetna Life Insurance Company, 151 Farmington Avenue in Hartford, Connecticut.  Staff Report.  Approved 8/31/99

PETITION NO. 428 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification of the Middle River electric substation off Middle River Road in Danbury, Connecticut.   Staff Report.  Approved 10/8/99

PETITION NO. 429 - PDC-El Paso Milford, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of an electric interconnection transmission line between the Milford Power Project located off Oronoque Road and the Devon substation at Naugatuck Avenue in Milford, Connecticut.  Staff Report.  Approved ONLY the upgrades to the substations 10/8/99; Approved interconnection 11/9/99.

PETITION NO. 430 - Crown Atlantic Company LLC petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications, and for an order to approve tower sharing, at an existing telecommunications facility located off North Main Street in Marlborough, Connecticut. (Docket No. 169).   Staff Report. Approved 10/8/99

PETITION NO. 431 - Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power electric transmission facility located at 705 Andrews Street in Southington, Connecticut.  Staff Report.  Approved 10/8/99

PETITION NO. 432 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to and placement of telecommunications antennas on an existing Connecticut Department of Transportation electric transmission structure located at the Westport Metro-North Rail Station on Ferry Lane in Westport, Connecticut.  Staff Report.  Approved 10/21/99

PETITION NO. 433 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for removal of the East Main Street Substation at 165 East Main Street and modification of the existing Congress Street Substation located at 55 Congress Street in Bridgeport, Connecticut.  Staff Report.  Approved 11/9/99

PETITION NO. 434 - Crown Atlantic Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to and placement of telecommunications antennas on an existing telecommunications facility located on Turkey Hill Road in Haddam, Connecticut. (Docket No. 58 and EM-CROWN-061-990927).  Staff Report.  Approved 10/21/99

PETITION NO. 435 - Crown Atlantic Company LLC petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications, and for an order to approve tower sharing, at an existing telecommunications facility located off Oliver Road in Enfield, Connecticut. (Docket No. 139).  Staff Report.  Approved 10/21/99

PETITION NO. 436 - Crown Atlantic Company LLC petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications, and for an order to approve tower sharing, at an existing telecommunications facility located off Ogg Meadow Road in Orange, Connecticut. (Docket No. 177).  Staff Report.  Approved 10/21/99 .

PETITION NO. 437 - United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications facilities associated with a remote network meter reading system within UI's service area.  Staff Report.   Approved nine of eleven sites 11/9/99. Reconsideration of the Woodbridge site. Approved 3/22/00. Reconsidered and Approved Ansonia site 8/10/00.

PETITION NO. 438 - United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of transmitters and receivers associated with a remote network meter reading system within UI's service area.  Staff Report.  Approved 11/9/99.

PETITION NO. 439 - Farmington River Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of the Black Rock - Burrit electric transmission line located on West Main Street and Corbin Avenue in New Britain.  Staff Report.  Approved 12/8/99

PETITION NO. 440 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification to an existing Connecticut Light and Power high-voltage electric transmission line support structure located at Whitney Avenue (Route 10) in Hamden.  Staff Report.  Approved 12/8/99

PETITION NO. 441 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification to an existing Connecticut Light and Power high-voltage electric transmission line support structure located between Route 7 and Mountain Road in Redding.  Staff Report.  Approved 12/8/99

PETITION NO. 442 - Tennessee Gas Pipeline Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of main line regulation in East Granby and the installation of an additional connection at the Southern Connecticut-Milford delivery point in Orange. Staff Report.   Approved 12/20/99

PETITION NO. 443 - AT&T Wireless PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power high-voltage electric transmission line support structure (no. 1292) located at Sound Shore Drive (Cos Cob) in Greenwich.  Staff Report.  Approved 2/2/00.

PETITION NO. 443A - AT&T request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power high-voltage electric transmission line support structure (no. 1292) located at Sound Shore Drive (Cos Cob) in Greenwich, Connecticut. Decision Letter and Staff ReportTemporary Tower Decision LetterNew Temporary Facility Request Council Decision on New Temporary Facility Request  Extension Request and Council Approval    Notice of Completion  Approved 12/10/15.

PETITION NO. 443B - AT&T request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power high-voltage electric transmission line support structure (no. 1292) located at Sound Shore Drive (Cos Cob) in Greenwich, Connecticut and for the installation of a temporary telecommunications facility at 1 River Road in Greenwich, Connecticut.  Approved 07/07/16.

PETITION NO. 444 - Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located between Meriden-Waterbury Turnpike (State Route 322) and Rahlene Drive in Southington.  Decision and Staff Report  Approved 4/12/00.

PETITION NO. 445 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a power transformer and associated equipment at the Newtown Substation located on Main Street (Route 25) in Newtown.  Staff Report.  Approved 3/1/00.

PETITION NO. 446 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located off Will Russ Court in Norwalk, Connecticut.  Staff Report.  Approved 4/12/00.

PETITION NO. 447- City of Norwich Department of Public Utilities petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for an upgrade of equipment at the Bean Hill Substation, 20 Connecticut Avenue in Norwich.  Staff Report.  Approved 3/22/00.

PETITION NO. 448 - Springwich Cellular Limited Partnership petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need (Docket No. 75) is required for the modification of an existing telecommunications facility located at 39 West Street in Danbury.  Staff Report.  Approved 4/12/00.

PETITION NO. 449 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power telecommunications facility located west of Willis Street on South Mountain in Bristol.  Findings of Fact.   Opinion.   Decision & Order.  Denied 6/7/00.

PETITION NO. 450 - Iroquois Gas Transmission System, L.P. petition that no Certificate of Environmental Compatibility and Public Need is required for the installation of a ground bed adjacent to an existing interstate natural gas pipeline located in Newtown (Docket No. 134 and 134C).  Staff Report.  Approved 4/12/00. 

PETITION NO. 451 - PPL Wallingford Energy LLC petition that no Certificate of Environmental Compatibility and Public Need is required for the construction of an electric generating facility at the site of the existing Alfred L. Pierce Station, located at 195 East Street in Wallingford.  Findings of Fact.  Opinion.   Decision & Order.  Approved 6/20/00.

PETITION NO. 452 - Department of Public Safety petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission line east of Route 63 in Canaan.Staff Report.  Approved 5/10/00.

PETITION NO. 453 - Town of Wallingford petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a new 115-kV electric transmission line from the Wallingford 13M Substation at 195 East Street to an existing Northeast Utilities electric transmission line located adjacent to Pent Road in Wallingford.  Staff Report.  Approved 6/20/00.

PETITION NO. 454 - Town of Wallingford petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification and construction of additional switching facilities at the existing Wallingford 13M Substation located at 195 East Street in Wallingford.  Staff Report.  Approved 6/20/00.

PETITION NO. 455 - AT&T Wireless PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at 289 Danbury Road in Wilton.  Staff Report.  Approved 5/10/00.

PETITION NO. 455A - New Cingular Wireless PCS, LLC (AT&T) request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to relocate an existing AT&T facility attached to an Eversource electric transmission line structure (#2998) onto an approved replacement electric transmission line structure (#2998) within the existing Eversource right-of-way located at 287 Danbury Road in Wilton, Connecticut.  Approved 08/04/16.

PETITION NO. 456 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on the north side of Peaceable Street in Redding.  Staff Report.  Approved 5/10/00.

PETITION NO. 457 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on the north side of Chimney Drive in Bethel.  Staff Report.  Approved 5/10/00.

PETITION NO. 458 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on the east side of Cooper Hill Road in Ridgefield.  Staff Report.  Approved 6/7/00.

PETITION NO. 459 - Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located off of Charles Marshall Drive in Norwalk.  Staff Report.  Approved 5/10/00.

PETITION NO. 460 - Litchfield Acquisition Corporation d/b/a AT&T Wireless Services petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications to a facility to be located at 478 Good Hill Road in Woodbury (Docket No. 183).  Staff Report.  Approved 5/24/00.

PETITION NO. 461 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at the Berlin Substation on Beckley Road in Berlin.  Staff Report.  Approved 5/24/00.

PETITION NO. 462 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications equipment associated with a remote network meter reading system at Canisius Hall, Fairfield University in Fairfield.  Staff Report.  Approved 5/24/00.

PETITION NO. 463HW - Active Oil, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for a proposed waste oil transfer facility at 120 Forbes Avenue in New Haven.  Staff Report.  Approved 6/20/00.

PETITION NO. 464HW - Tri-S Environmental Services, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required to operate a bulking and solidification facility at 25 Pinney Street in Ellington.  Staff Report.  Approved 6/20/00.

PETITION NO. 465 - TransEnergie U.S. Ltd. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of an electric substation and interconnection facility located adjacent to the East Shore Substation and the New Haven Harbor Generating Facility, One Waterfront Street, in New Haven.  Decision & Order.   Opinion.  (Voted that Petition was moot, 3/28/01)

PETITION NO. 466 -VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located off Station Drive adjacent to Cos Cob Railroad Station in Greenwich.  Staff Report.  Approved 6/20/00.

PETITION NO. 467 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power Company electric transmission facility located off Sound Beach Avenue at the Old Greenwich Railroad Station in Greenwich.  Staff Report.  Approved 6/20/00.

PETITION NO. 468 - Litchfield Acquisition Corp., d/b/a AT&T Wireless Services petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications to a facility to be located at 20 Antolini Road in New Hartford.  Staff Report.   Staff Report 2.  Denied 7/11/00. Reconsidered and Approved 8/10/00.

PETITION NO. 469 - Litchfield Acquisition Corp., d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to a facility to be located off Rust Road, Barkhamsted, (Docket No. 182).  Staff Report.  Denied 7/11/00. Reconsidered and Approved 8/10/00.

PETITION NO. 470 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light & Power Company electric transmission facility located off Cooper Hill Road, Ridgefield.  Staff Report.  Approved 7/11/00.

PETITION NO. 471 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located on Route 136, Fairfield, Connecticut.  Staff Report.  Approved 7/25/00.

PETITION NO. 472 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located east of Duncaster Road, Bloomfield, Connecticut.  Staff Report.  Approved 7/25/00.

PETITION NO. 473 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power Company electric transmission facility located off Rowayton Avenue, Norwalk, Connecticut.  Staff Report.  Approved 8/10/00.

PETITION NO. 474 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power Company electric transmission facility located off West Avenue, Darien, Connecticut.  Staff Report.  Approved 8/10/00.

PETITION NO. 475 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on Morehouse Drive, Fairfield, Connecticut (Petition No. 383).  Staff Report.  Approved 8/31/00.

PETITION NO. 476 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed changes at Connecticut Light & Power Company’s Long Mountain Substation located off Long Meadow Road, New Milford, Connecticut.  Staff Report.  Approved 8/31/00.

PETITION NO. 477HW - United Oil Recovery, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for changes at the container staging area of the facility located at 136 Gracey Avenue, Meriden, Connecticut.  Staff Report.  Approved 9/19/00.

(PETITION NO. 478)/DOCKET NO. 2 - Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for a 115 kV transmission line in the Towns of Redding and Ridgefield, Connecticut (Petition No. 478). Remediation Plan and Recreational Enhancement.  Staff Report.  Approved 8/31/00.

PETITION NO. 479 - Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing Connecticut Light and Power electric transmission facility located at 7 Stony Hill Road, Bethel, Connecticut.  Staff Report.  Approved 9/19/00.

PETITION NO. 480 - Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing electric substation facility (Dooley Substation) located west of Long Hill Road and South Main Street (Rte. 17), Middletown, Connecticut.  Staff Report.  Approved 9/19/00.

PETITION NO. 481 - Litchfield Acquisition Corporation d/b/a AT&T Wireless Services petition that no amendment to the Certificate of Environmental Compatibility and Public Need is required for proposed site plan changes at 70 Herb Road, Sharon, Connecticut.  (Docket No. 185)  Staff Report.  Approved 10/2/00.

PETITION NO. 482 - HEC, Inc., acting as agent for the State of Connecticut, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for fuel cells and emergency generating devices to be developed at the Connecticut Juvenile Training School in Middletown, Connecticut.  Staff Report.  Approved 9/19/00.

PETITION NO. 483 - United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Cell Master Unit on the roof of the Connecticut Financial Center, 157 Church Street, New Haven, Connecticut. Withdrawn.

PETITION NO. 484 - Algonquin Gas Transmission Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a lateral addition to the Algonquin interstate natural gas pipeline system in Wallingford, Connecticut.  Staff Report. Approved 10/2/00.

PETITION NO. 485 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification of an existing Connecticut Light and Power electric transmission facility located at Route 202, Russeling Road, New Milford, Connecticut.  Staff Report.  Approved 11/14/00.

PETITION NO. 486 - VoiceStream Wireless, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at 289 Bittersweet Road, Orange, Connecticut.   Staff Report 1.   Staff Report 2.  Approved 12/19/02.

PETITION NO. 487 - VoiceStream Wireless, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at Route 22, North Branford, Connecticut.  Staff Report.  Approved 10/19/00.

PETITION NO. 488 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing electric substation facility (Cos Cob Substation) located off Sound Shore Drive, Greenwich, Connecticut.  Staff Report.  Approved 11/2/00.

PETITION NO. 489 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located at Halpin Lane, Ridgefield, Connecticut.  Staff Report.  Approved 12/14/00.

PETITION NO. 490HW - Colt Refining Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to accept and store certain hazardous wastes at 12 Baer Circle, East Haven, Connecticut.  Staff Report.  Approved 11/2/00.

PETITION NO. 491 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of two 115-kV electric transmission lines that cross Pent Road, South Cherry Street, Dudley Avenue and South Colony Street (Route 5), Wallingford, Connecticut.  Staff Report.  Approved 11/14/00.

PETITION NO. 492 - Town of Middlebury, Citizens for the Defense of Oxford, Trout Unlimited, Inc., William Stowell, and Mira Schachne petition for a declaratory ruling regarding a Development and Management plan as submitted by Towantic Energy LLC, for construction of an electric generating facility in Oxford, Connecticut. (Docket No. 192)   Denied 3/1/01. Decision

PETITION NO. 493 - VoiceStream Wireless Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located at Park Ridge Road, west of Hope Drive, Brookfield, Connecticut.  Staff Report 1.   Staff Report 2.  Approved 12/14/00. Site plan revisions approved 10/17/01.

PETITION NO. 494 - Springwich Cellular Limited Partnership (SCLP) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located at 763 Federal Road (Route 7), South of Station Road, Brookfield, Connecticut.  Staff Report Approved 11/30/00.

PETITION NO. 495 - Springwich Cellular Limited Partnership (SCLP) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing SCLP telecommunications facility located on Riversville Road, Greenwich, Connecticut.  Staff Report.  Approved 12/14/00.

PETITION NO. 496 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications facilities associated with a remote network meter reading system within UI's service area.  Staff Report.  Approved five of the seven proposed sites. 12/14/00.

PETITION NO. 497 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to a CL&P electric transmission line and substation facilities located off Barber Hill Road (Barbour Hill Substation), South Windsor, Connecticut, and off Maple Street (Rockville Substation), Vernon, Connecticut.  Staff Report.  Approved 12/14/00.

PETITION NO. 498 - Springwich Cellular Limited Partnership petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric line structure located at Ferry Road, Old Saybrook, Connecticut.  Staff Report.  Acknowledged 3/1/01.

PETITION NO. 499 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to the existing Milvon Substation, located at 770 Bridgeport Avenue in Milford, Connecticut.  Staff Report.  Approved 1/25/01.