PETITION NO. 1337 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Stepstone to Green Hill Substation Upgrade Project that includes replacement of approximately 5.6 miles of its existing No. 1508 115-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right of way between Stepstone Substation located at 50 Stepstone Road, Guilford, Connecticut and Green Hill Substation located at 775 Green Hill Road, Madison, Connecticut, and related electric transmission line structure improvements.