PETITION NO. 1226 – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of the new 115-kV Towantic Switching Station to be located adjacent to the Towantic Generating Station on Woodruff Hill Road, Oxford, Connecticut and the proposed modifications within existing right-of-way to its existing 1575 and 1585 115-kV electric transmission line extending 6.1 miles from Bunker Hill Substation, located at Clough Road, Waterbury, south through Middlebury to the proposed Towantic Switching station and reconductoring of its existing 1575 115-kV electric transmission line extending one mile from the proposed new switching station south to Structure 1446 (Oxford Tap) located near the Oxford Substation, Commerce Drive, Oxford.
CORRESPONDENCE
DECISION
Decision Letter and Staff Report, 05/27/16
FAA Forms and Underground Scheme Drawings, 08/18/2016
Request to Install Temporary Structures with CSC Decision, 09/07/2016
Request to Approve Locations of laydown and staging areas, 09/16/16
Decision Letter Location of laydown and staging areas, 09/21/2016
Revision Request for Temporary Hours, 10/28/2016
Revision Request for Structure 1496A Relocation, 10/28/2016
Council Decision on Structure 1496A Relocation, 11/15/17
FAA Forms and Underground Scheme Drawings, 08/18/2016
Request to Install Temporary Structures with CSC Decision, 09/07/2016
Request to Approve Locations of laydown and staging areas, 09/16/16
Decision Letter Location of laydown and staging areas, 09/21/2016
Revision Request for Temporary Hours, 10/28/2016
Revision Request for Structure 1496A Relocation, 10/28/2016
Council Decision on Structure 1496A Relocation, 11/15/17
Request for Work Hours Revision with CSC Decision, 11/10/2016
Request for Work Hours Revision with CSC Decision, 11/18/2016
Request for Work Hours Revision with CSC Decision, 11/29/2016
Request for Work Hours Revision with CSC Decision, 12/08/16
Request for Work Hours Revision with CSC Decision, 11/18/2016
Request for Work Hours Revision with CSC Decision, 11/29/2016
Request for Work Hours Revision with CSC Decision, 12/08/16
Submittal of FAA Forms and Determinations per Council Conditions Nos. 5&6, 12/16/16 (available for review in the Council's office)
Additional Correspondence Regarding the Request for FAA Lighting and Temporary Structures Modifications, 02/27/17