Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Please be advised that the Connecticut Siting Council will not be accepting any hard copy filings for any matter after 12 PM on Wednesday, December 24, 2025. Regular file processing will resume at 8:30 AM on Friday, December 26, 2025. Thank you for your consideration.

PETITION NO. 1217 -  Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed separation of the existing 1779/1777 115 kilovolt (kV) electric transmission lines for 1.6 miles within existing right of way from Bloomfield Substation to Bloomfield Junction;  proposed separation of the existing 1751/1777 115kV electric transmission lines for 5.3 miles within existing right of way from Bloomfield Junction to North Bloomfield Substation; modifications to the existing overhead 1779 115 kV electric transmission line to loop into the Rood Avenue Substation via underground cables; including related transmission line structure improvements; and modifications to the Bloomfield Substation, 40 Crestview Drive and North Bloomfield Substation, 2 Hoskins Road both in Bloomfield, Connecticut and modifications to the Rood Avenue Substation located at 275 Rood Avenue, Windsor, Connecticut.
PETITION FILING
PROCEDURAL CORRESPONDENCE
DECISION
DEVELOPMENT & MANAGEMENT PLANSUB STATION
            Volume One 07/29/2016
             Volume Two 07/29/2016
DEVELOPMENT & MANAGEMENT PLAN TRANSMISSION LINE