PETITION NO. 1231 -
Eversource Energy petition for a declaratory ruling that no Certificate of
Environmental Compatibility and Public Need is required for the proposed
removal and replacement of existing double-circuit lattice Structure 6-101 with
two proposed single-circuit monopole structures to separate
the existing 115-kilovolt (kV) 1572 and 1620 electric transmission lines located
at NRG Energy, Inc.’s existing Middletown Power, LLC electric generating
facility located at 1866 River Road, Middletown, Connecticut and related transmission line structure improvements.
PROCEDURAL CORRESPONDENCE