Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Due to a mandatory IT upgrade on January 10, 2026, any documents posted to the Council’s website between December 22, 2025 and January 10, 2026 must be completely reposted to the respective webpages. During this transition, upon request, the Council can provide electronic copies of any document that was posted to the website prior to the effective date of the upgrade. We appreciate your patience.

PETITION NO. 1231 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal and replacement of existing double-circuit lattice Structure 6-101 with two proposed single-circuit monopole structures to separate the existing 115-kilovolt (kV) 1572 and 1620 electric transmission lines located at NRG Energy, Inc.’s existing Middletown Power, LLC electric generating facility located at 1866 River Road, Middletown, Connecticut and related transmission line structure improvements.
PROCEDURAL CORRESPONDENCE