3/4/2024
CTDOT is announcing that a project involving upgrades to pedestrian facilities at existing traffic control signals will be starting in Branford, Bridgeport, Darien, East Haven, Fairfield, Guilford, Madison, Milford, Monroe, New Canaan, New Haven, North Haven, Orange, Shelton, West Haven, Weston, Westport, and Woodbridge.
3/3/2024
CTDOT is announcing that a pavement rehabilitation project on I-95 between exit 2 and 6 in both the north and southbound directions will begin on March 11, 2024.
2/29/2024
CTDOT is announcing the continuation of construction for a bridge rehabilitation project on Route 9 in Middletown, Tolland, Southington, Meriden, Rocky Hill, Plainville, Cromwell, New Britain, East Hartford, and Wethersfield.
2/29/2024
CTDOT is announcing that an Aerial Cable Maintenance operation will require State Police to perform Rolling Roadblocks along with a closure of the right lane on I-95 north and southbound in West Haven.
2/28/2024
CTDOT is announcing that tree and vegetation removals will be performed on Route 44 (Mashamoquet Road) in Pomfret and Eastford starting on Monday, March 18, 2024.
2/28/2024
CTDOT is announcing that an Aerial Cable Maintenance Operation will require State Police to perform rolling roadblocks in both the north and southbound directions on Route 8 between exits 11 and 13 in Shelton starting Sunday, March 17, 2024.
2/28/2024
CTDOT is announcing that a bridge joint plate removal project will start on Monday, March 4, 2024, on Interstate 91 southbound in New Haven.
2/27/2024
CTDOT is starting the second phase of three projects designed to improve traffic flow at I-91/I-691/ Route 15 Interchange northbound in Meriden beginning on March 4, 2024.
2/22/2024
The Connecticut Department of Transportation (CTDOT) is announcing the closure of Service Road 603 (Boston Hill Road) in Andover for culvert repair starting on Monday, March 4, 2024.
2/21/2024
CTDOT is announcing that the start of work along Route 140 (Crystal Lake Road), Burbank Road, and Newell Hill Road will begin on March 4, 2024.