CTDOT is announcing that a wrong way driver detection system retesting will be performed on I-84 eastbound at Exit 16 in Southbury on Monday, January 13, 2025.
CTDOT is announcing that a wrong way driver detection system retesting will be performed on I-84 eastbound at Exit 16 in Southbury on Monday, January 13, 2025.
CTDOT is announcing that continued survey operations will be performed on Route 15 & 7 in Norwalk starting on Saturday, January 18, 2025.
CTDOT is announcing that Eversource will be performing a tree removal operation on Route 478 in Warren starting on Wednesday, January 15 to Tuesday, January 21, 2025.
CTDOT is announcing that Eversource will be performing a tree removal operation on Route 45 on East Shore Road in Warren starting on Wednesday, January 22, 2025.
CTDOT is announcing a wrong way detection installation will take place on I-95 southbound at Exit 17 in Westport on Monday, January 13, 2025.
CTDOT is announcing that a guiderail upgrade will be performed on Route 39 in Sherman starting on Thursday, January 16, 2025.
CTDOT is announcing bridge work will be performed on I-84 west in Waterbury starting on January 13, 2025.
CTDOT is announcing metal guide rail installation & repair will take place on Route 15 north and southbound between interchange 57 and 58 in Woodbridge and New Haven beginning on January 20, 2025.
The Connecticut Department of Transportation (CTDOT) is announcing that exit numbering will be revised on Route 2 both east and westbound, and Route 11 both north and southbound from starting on Tuesday, January 7, 2025, weather permitting.