CTDOT is announcing that milling and resurfacing will continue on Route 8 northbound in Watertown and Thomaston which started on Sunday, September 13, 2026.
CTDOT is announcing that milling and resurfacing will continue on Route 8 northbound in Thomaston, Litchfield and Harwinton which started on Thursday, September 24, 2026.
CTDOT is announcing that Bissell Bridge Rehabilitation will be continue on I-291 over the Connecticut River in Windsor and South Windsor requiring a Construction Staging shift on I-291 Westbound.
CTDOT is announcing the continued retrofitting of municipal separate storm sewer system (MS4) in Trumbull and Stratford for October 2026.
CTDOT is announcing that a milling and resurfacing project will be performed on Route 6 eastbound in Bolton and Coventry starting on Monday, October 12, 2026.
CTDOT is announcing the replacement and/or overlay of extruded aluminum highway sign panels on existing sign supports and revising the exit numbering system along the entirety of I-91 in various towns from New Haven to the Connecticut state line beginning Thursday, October 15, 2026.
CTDOT is announcing that temporary nighttime on and off-ramp closures are required for pavement preservation activities that will be performed in East Windsor and Enfield along I-91 ramps at Exit 45-49 beginning Monday, October 12, 2026.
CTDOT is announcing that the Route 2 westbound left lane in the area of the Exit 20 off-ramp to Route 149/Westchester Road Avenue will be closed on a long-term basis.
CTDOT is announcing that a stage shift will be performed on I-84 westbound at Exit 45 off-ramp in Hartford starting on Monday, October 5, 2026.