2022 CTDOT Construction Advisories
Page 7 of 27
-
9/28/2022
Milling and Paving Project, Route 110 Monroe
CTDOT is announcing that a mill and fill resurfacing project will be performed on Route 110 in Monroe.
-
9/26/2022
Mill and Fill on I95 Stamford
CTDOT is announcing that a mill and fill resurfacing project will be performed on I-95 in Stamford.
-
9/26/2022
Safety Improvement Project on I95 from the Madison Guilford Town Line Rhode Island State Line
CTDOT is announcing that a safety improvement project will be performed on I-95 northbound and southbound in October 2022.
-
9/26/2022
Thin Surface Treatment on Route 202 in Washington
CTDOT is announcing that a Thin Surface Treatment prior to 2023 resurfacing project will be performed on Route 202 in the Town of Washington.
-
9/26/2022
Metal Beam Guiderail Upgrade Project
CTDOT is announcing that guiderail upgrades will be performed on Route 4 and 179 in Farmington, Burlington and Canton.
-
9/26/2022
Safety Improvement Project on Various Towns in Eastern Connecticut
CTDOT is announcing that a safety improvement project will be performed on Routes 12 and 14 in Plainfield, Route 165 in Norwich/Preston, Route 156 in Lyme/Old Lyme, Route 12 in Lisbon/Griswold, Route 163 in Montville/Bozrah, and Route 6 in Hampton.
-
9/26/2022
Culvert Replacement on Route 72 in Harwinton
CTDOT is announcing that the start of an anticipated two-week duration closure for culvert replacement on Route 72 beginning October 3, 2022.
-
9/26/2022
High Friction Surface Treatments on State Roads in Various Towns
CTDOT is announcing additional hours of work for High Friction Surface Treatments starting September 26, 2022.
-
9/23/2022
Milling and Resurfacing Route 187 in Hartford from Route 44 (Albany Avenue) to the Bloomfield Town Line
CTDOT is announcing that a milling and resurfacing project will be performed on Route 187 in Hartford from Route 44 (Albany Ave) to the Bloomfield Town Line.
-
9/22/2022
Bridge Maintenance on I-95 Northbound and Southbound in Stamford
CTDOT is announcing that a bridge maintenance project will be performed on I-95 in Stamford between September 25 and September 30, 2022.
-
9/21/2022
Bridge Surveying of the Mystic Drawbridge
CTDOT is announcing that a bridge maintenance project will be performed on the Mystic Drawbridge in October 2022.
-
9/16/2022
Periodic Nighttime Closures of Various On-Ramps and Off Ramps on I-84 and Route 8 in Middlebury and Waterbury
CTDOT is announcing periodic nighttime closures of I-84 and Route 8 ramps with signed detours between September 19 and September 23, 2022.