2021 Construction Advisories
Page 22 of 28
-
4/18/2021
Virtual Public Information/CEPA Scoping Meeting Concerning the Replacement of Stiles Bridge Carrying Route 191 over Scantic River in East Windsor
The Department of Transportation (Department) will conduct a virtual public informational/CEPA scoping meeting* concerning the proposed replacement of Stiles Bridge (Bridge 01524) carrying Route 191 over Scantic River in East Windsor, on Tuesday, May 4, 2021. The formal presentation will begin at 7:00 p.m. Refer to the project webpage for more detail: https://portal.ct.gov/DOTEastWindsor46-127.
-
4/18/2021
Milling and Resurfacing Project on Route 71A in New Britain
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 71A from Route 571 (West) to Buell Street in New Britain.
-
4/15/2021
Milling and Resurfacing Project on Route 10 in Cheshire
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 10 in Cheshire.
-
4/15/2021
Pavement Preservation Project on I-84 in Willington, Ashford, and Union
The Connecticut Department of Transportation is announcing that a nighttime resurfacing project will be performed on I-84 eastbound and westbound in Willington, Ashford, and Union, beginning on April 26, 2021.
-
4/14/2021
Scheduled Daytime Lane Closures on the Merritt Parkway in Westport and Fairfield on Thursday, April 22, 2021
The Connecticut Department of Transportation is announcing that mobile daytime left lane closures will occur Thursday, April 22, 2021, weather-permitting, in both the northbound and southbound directions of the Merritt Parkway in Westport and Fairfield. These moving work zones are required to perform inspections of the pavement.
-
4/14/2021
Milling and Resurfacing Project on Route 201 in Griswold
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 201 in Griswold.
-
4/14/2021
Scheduled Closure and Detour of South State Street over the Rippowam River in Stamford
The Connecticut Department of Transportation is announcing the scheduled closure and detour of South State Street over the Rippowam River in Stamford from May 3, 2021, at 7 AM, to November 30, 2021. The closure is necessary to facilitate construction activities associated with the rehabilitation of the existing bridge and roadway over the Rippowam River.
-
4/13/2021
Milling and Resurfacing Project on Route 163 in Bozrah
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 163 in Bozrah.
-
4/13/2021
Milling and Resurfacing Project on Route 1A in Stonington
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 1A in Stonington.
-
4/13/2021
Milling and Resurfacing Project on Route 612 (Haughton Road) in Bozrah
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 612 (Haughton Road) in Bozrah.
-
4/13/2021
Milling and Resurfacing Project on Route 1A in Stonington
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 1A in Stonington.
-
4/13/2021
Scheduled Partial-Day Closure of the I-95 Northbound Exit 33 Off-Ramp in Stratford
The Connecticut Department of Transportation is announcing the scheduled partial-day closure of the I-95 northbound Exit 33 off-ramp in Stratford on Thursday, April 22, 2021, from 9 AM to 3 PM. The closure is necessary to facilitate ongoing construction activities associated with the reconstruction of Interchange 33 in Stratford.
-
4/12/2021
Rehabilitation of Culverts on I-395 in Norwich
The Connecticut Department of Transportation is announcing the start of construction activities to rehabilitate three culverts under I-395 between Exits 13 and 18 in Norwich.
-
4/12/2021
Public Information Meeting Concerning Installation of Centerline Rumble Strips on Route 22 and Route 510 in Enfield
The Connecticut Department of Transportation (Department) will conduct a public information meeting concerning proposed installation of Centerline Rumble Strips on Route 220 (Taylor Road) from 200-feet north of SSR 404 (Shaker Road) to Oak Road, and on SR 510 (Depot Hill Road) from the East Windsor town line to the northerly junction of U.S. Route 5 (King Street), on Tuesday, June 1, 2021. The formal presentation will begin at 6 p.m. Refer to the project webpage for more detail: http://portal.ct.gov/DOTEnfield171-456.
-
4/12/2021
Milling and Resurfacing Project on Route 30 in Ellington
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 30 from the Tolland town line to Route 140 in Ellington.