Documents
Presentations & Meeting Minutes
- Windsor-Windsor Locks-Enfield Phase 3B Presentation January 2026
- Windsor-Windsor Locks-Enfield Phase 3B Meeting Minutes January 2026
- West Hartford-Hartford Phase 3B Presentation October 2025
- West Hartford-Hartford Phase 3B Meeting Minutes October 2025
- Route 159 Improvements Presentation May 2025
- Route 159 Improvements Meeting Minutes May 2025
- Enfield Station Presentation October 2023
- Windsor Locks Station Presentation September 2019
Program Documents
Photo Library
Other Program Photos
Public Information
Track Construction
Train Construction Machine
Video Library
Berlin Station Grand Opening - 10/23/18
As part of the Hartford Line Rail Program, a new, modernized Berlin train station in Berlin, Connecticut, opened on October 23, 2018. Watch the video on YouTube with detailed caption provided here.
Construction at Batchelder Road (Windsor)
In September 2017, construction crews rebuilt a railroad bridge over Batchelder Road in Windsor, Connecticut. Watch the video on YouTube with detailed caption provided here.
Installation of New Concrete Sections – Route 150 Bridge (Wallingford)
The following video shows the installation of new concrete sections on the railroad bridge over Route 150 in Wallingford. Watch the video on YouTube with detailed caption provided here.
Introducing the Hartford Line
Launched on Jun 16, 2018, the CTrail Hartford Line is a passenger rail service enhancing travel between New Haven, CT, and Springfield, MA. Watch the video on YouTube with detailed caption provided here.
New Haven, State Street Railroad Station, Pedestrian Bridge Installation
The following video shows the installation of the new 31-foot-long pedestrian bridge connecting the new entry to the stair and elevator tower at State Street Station in New Haven. Watch the video on YouTube with detailed caption provided here.
Pipe Installation Process at Creamery Brook (Windsor)
The following video shows the installation process for the extension of an existing culvert that carries Creamery Brook in Windsor, Connecticut under the Amtrak rail line. Watch the video on YouTube with detailed caption provided here.
Track Construction Machine Installs New Track in Berlin, Connecticut (July 2017)
In July 2017, the Hartford Line Rail Program captured the state-of-the-art Track Construction Machine (TCM) in operation as it installed new track in Berlin, Connecticut. Watch the video on YouTube with detailed caption provided here.
Disaster Drill with Hartford Fire Department
In Fall 2018, Hartford firefighters and other area first responders went through a simulation of a head-on train collision. Watch the video on YouTube with detailed caption provided here.
Track Construction Machine Installs Double Track
In October 2016, Governor Dannel P. Malloy and Connecticut Department of Transportation (CTDOT) Commissioner James P. Redeker unveiled the mammoth Track Construction Machine (TCM) that is being used to double-track portions of the CTrail Hartford Line. Watch the video on YouTube with detailed caption provided here.