2023 CTDOT Construction Advisories
Page 20 of 24
-
4/6/2023
Start of Construction Work on Route 372
CTDOT is announcing the application of ultra-thin bonded overlay preservation treatments in Berlin and Cromwell.
-
4/6/2023
Strawberry Hill Avenue Bridge Rehabilitation Project over I-95 Continues
CTDOT is announcing that full-depth pavement reconstruction associated with the Strawberry Hill Avenue Bridge rehabilitation over I-95 will begin April 17, 2023.
-
4/6/2023
Pipe Installation on Route 320 in Willington and Mansfield.
CTDOT is announcing that pipe installation will be performed on Route 320 starting April 22, 2023.
-
4/6/2023
Milling and Resurfacing Route 372 New Britain and Berlin
CTDOT is announcing that a milling and resurfacing project will be performed on Route 372 in New Britain and Berlin from Hart Street to SR572 Worthington Ridge Road.
-
4/6/2023
Tree Removal Operation in Bethany
CTDOT is announcing that a tree removal operation will require alternate lane closure on Route 42 (Cheshire Road) from Route 69 (Carrington Road) to Route 63 (Amity Road).
-
4/6/2023
Traffic Signal Safety and Technology Enhancements in Southwestern Connecticut Bridgeport, Darien, Fairfield, Monroe, New Canaan, Shelton, Stratford, Trumbull, Weston, and Wilton
CTDOT is announcing the start of intersection improvements including traffic shifts and lane closures will commence on May 8, 2023.
-
4/5/2023
Tree Removal and Drainage Work in Ansonia
CTDOT is announcing that Route 334 in Ansonia will be closed on Monday, April 10 and Tuesday, April 11, 2023 from 8 a.m. to 4 p.m. between Clarkson Street and Holebrook Place for tree work in preparation for a drainage project.
-
4/5/2023
Rehabilitation of the Washington Bridge carrying U.S. Route 1 Over Housatonic River in Milford and Stratford
CTDOT is announcing that temporary deviations of the drawbridge operation regulations that govern the Washington Bridge carrying Route 1 over Housatonic River will begin on March 27, 2023.
-
4/4/2023
Start of Construction Work on Route 3
CTDOT is announcing the application of ultra-thin bonded overlay preservation treatments in Cromwell, Rocky Hill, Wethersfield, Glastonbury, and East Hartford.
-
4/3/2023
Start of Work on Route 69 and Route 72 in Bristol
CTDOT is announcing intersection improvement work on Routes 69 and Route 72 will begin on April 3, 2023.
-
4/3/2023
Intersection Improvements at Route 10/202, Route 20 and Route 189 in Granby
CTDOT is announcing night work in Granby for intersection improvement construction activities April 2 through June 1, 2023.
-
4/3/2023
Mill and Overlay on Interstate 95 in Milford and Orange
CTDOT is announcing that pavement resurfacing of I-95 between Exit 35 and Exit 41 will begin on April 3, 2023
-
3/31/2023
Upgrade of Traffic Signals with Railroad Pre-Emption in Wallingford
CTDOT is announcing the upgrade of traffic control signals with railroad pre-emption on Route 5, Route 150 and SR 702 to meet current standards.
-
3/31/2023
Detour Scheduled for Rehabilitation of Bridge No. 00489 Route 66 over the New England Central Railroad in Windham
CTDOT is announcing that the full bridge deck replacement of Bridge No. 00489 on Route 66 will take place April 21, 2023 to April 24, 2023 in Windham.
-
3/31/2023
Surveying on I-95 at Exit 38 in Milford and on the Milford Parkway
CTDOT is announcing that a surveying operation will be performed on I-95 Northbound/Southbound at Exit 38 and Northbound/Southbound on the Milford Parkway starting April 15.