2023 CTDOT Construction Advisories
Page 20 of 25
-
4/18/2023
Milling and Resurfacing on Route 44 in Eastford and Pomfret
CTDOT is announcing a milling and resurfacing project will be performed on Route 44 in Eastford and Pomfret.
-
4/18/2023
Milling and Resurfacing Route 275 in Coventry and Mansfield
CTDOT is announcing that a milling and resurfacing project will be performed on Route 275 in Coventry and Mansfield from Route 31 (Main Street) to Route 32 (Stafford Road).
-
4/18/2023
Milling and Resurfacing Service Road 708 in Milford
CTDOT is announcing that a milling and resurfacing project will be performed on Service Road 708 in Milford.
-
4/18/2023
Milling and Resurfacing Route 10 in Cheshire and Southington.
The Connecticut Department of Transportation (CTDOT) is announcing that a milling and resurfacing project will be performed on Route 10 in Cheshire and Southington from Stoney Hill Road to the beginning of the overpass to Route 322. Body of the Message The Connecticut Department of Transportation CTDOT is announcing that a milling and resurfacing project will be performed on Route 10 in Cheshire and Southington from Stoney Hill Road to the beginning of the overpass to Route 322. The project (DOT01710498CN “C”) consists of milling and resurfacing a 2.96-mile segment of Route 10 This project is scheduled to begin milling by Rafferty on Sunday, April 30, 2023, to Monday, May 8, 2023. The resurfacing segment of this project is anticipated to begin on Monday, May 15, 2023, to Sunday, May 28, 2023, by Tilcon Inc. This project is included in the District 1, Department of Transportation’s 2023 Vendor Resurfacing Program. LANE CLOSURE INFO Motorists can expect lane closures on Route 10 in Cheshire and Southington from Stoney Hill Road to the beginning of the overpass to Route 322. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The work schedule for this project is 7:00 p.m. to 5:00 a.m. (Sunday – Thursday). Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.
-
4/18/2023
Milling and Resurfacing Route 15 in Wallingford
CTDOT is announcing that a milling and resurfacing project will be performed on Route 15 in Wallingford.
-
4/13/2023
Intermittent Nighttime Ramp Closure and Nighttime Lane Closures on I-84 in West Hartford
CTDOT is announcing several lane closures on I-84 Eastbound and Westbound West Hartford.
-
4/12/2023
Emergency Asphaltic Plug Joint Plate Removal on Route 15 Northbound in Wallingford
CTDOT is announcing that a bridge maintenance project will be performed on Route 15 Northbound in Wallingford.
-
4/11/2023
Asphalt Chip Seal in Bethel and Redding
CTDOT announcing that lane closures on Route 53 in Redding and Route 58 in Bethel will begin on April 17, 2023.
-
4/9/2023
Route 15 Merritt Parkway Safety Improvements, Resurfacing, Enhancements, and Bridge Improvements in New Canaan and Norwalk
The Connecticut Department of Transportation is announcing that nighttime closures of exit and entrance ramps will occur during milling and paving operations scheduled to begin the week of April 10, 2023, and may continue intermittently through May 19, 2023.
-
4/6/2023
Start of Construction Work on Route 372
CTDOT is announcing the application of ultra-thin bonded overlay preservation treatments in Berlin and Cromwell.
-
4/6/2023
Strawberry Hill Avenue Bridge Rehabilitation Project over I-95 Continues
CTDOT is announcing that full-depth pavement reconstruction associated with the Strawberry Hill Avenue Bridge rehabilitation over I-95 will begin April 17, 2023.
-
4/5/2023
Milling and Resurfacing Route 372 New Britain and Berlin
CTDOT is announcing that a milling and resurfacing project will be performed on Route 372 in New Britain and Berlin from Hart Street to SR572 Worthington Ridge Road.
-
4/5/2023
Tree Removal Operation in Bethany
CTDOT is announcing that a tree removal operation will require alternate lane closure on Route 42 (Cheshire Road) from Route 69 (Carrington Road) to Route 63 (Amity Road).
-
4/5/2023
Traffic Signal Safety and Technology Enhancements in Southwestern Connecticut Bridgeport, Darien, Fairfield, Monroe, New Canaan, Shelton, Stratford, Trumbull, Weston, and Wilton
CTDOT is announcing the start of intersection improvements including traffic shifts and lane closures will commence on May 8, 2023.