2023 CTDOT Construction Advisories
Page 18 of 24
-
5/3/2023
Milling and Resurfacing Route 136 in Norwalk
CTDOT is announcing that a milling and resurfacing project will be performed on Route 136 in Norwalk.
-
5/2/2023
Closure of Route 9 Southbound on-ramp from Route 80 in Deep River
CTDOT is announcing the on-ramp from Route 80 to Route 9 Southbound in Deep River will be closed for concrete deck end repairs from May 8 to May 19, 2023, during the hours of 6:00 P.M. to 6:00 A.M.
-
5/3/2023
Bridge Maintenance on I-95 Southbound in Stamford
CTDOT is announcing that a bridge maintenance project will be performed on I-95 Southbound in Stamford.
-
5/3/2023
Milling and Resurfacing Service Road 845 in Waterbury
CTDOT is announcing that milling and resurfacing project will be performed on Service Road 845 Waterbury in May 2023.
-
5/1/2023
Metal Beam Guiderail Upgrade Project in Beacon Fall
CTDOT is announcing a guiderail upgrade project will be performed on Route 8 northbound and southbound between Exits 25 and 24.
-
4/28/2023
Wood Pole Guiderail Upgrade Project in Danbury and New Fairfield
CTDOT is announcing that a guiderail upgrade project will be performed on Route 39 and Service Road 839 (Milltown Road) in New Fairfield/Danbury.
-
4/28/2023
Right Lane Closure on the I-95 NB Gold Star Memorial Bridge in New London and Groton
CTDOT is announcing that a right lane closure on I-95 northbound Gold Star Memorial Bridge in New London and Groton will begin on May 1, 2023.
-
4/28/2023
Replacement of Catch Basin Tops on I-95 between Exits 51 and 54 in New Haven, East Haven, and Branford
CTDOT is announcing that this project will require on- and off-ramps to be closed intermittently.
-
4/27/2023
Milling and Resurfacing Project on Route 8 in Harwinton/Torrington
CTDOT is announcing that a milling and a 1” resurfacing project is scheduled for Route 8 Northbound and Southbound between Exits 42-45.
-
4/27/2023
Nighttime Lane Closure on I-95 Northbound in East Lyme
CTDOT is announcing a lane on I-95 Northbound will need to closed during nighttime hours beginning April 30, 2023 to facilitate construction work associated with the I-95 Interchange 74 Project.
-
4/27/2023
Refacing the Retaining Wall on Route 10 in Cheshire
CTDOT is announcing that the retaining wall, located at approximately 283 S. Main St., will be refaced between April and May 2023.
-
4/26/2023
Milling and Resurfacing on Route 9 southbound in Chester and Haddam
CTDOT is announcing that a milling and resurfacing project will be performed on Route 9 southbound in Chester and Haddam.
-
4/26/2023
Tree Removal on Route 15 Northbound and Southbound in Greenwich
CTDOT is announcing that a tree removal operation will require the closure of the left lane on Route 15 in Greenwich.
-
4/21/2023
Start of Roadwork on Route 9 in Cromwell
CTDOT is announcing the application of ultra-thin bonded overlay preservation treatments on various state roads in Cromwell. in District 1: Route 9 Northbound from Route 372 (West St) to .09 miles south of North Rd over Route 9NB, and Route 9 Southbound from .06 miles north of North Rd over Route 9SB
-
4/21/2023
Thin Surface Project on Route 8 Northbound in Thomaston, Litchfield, and Harwinton
CTDOT is announcing that a thin surface project will be performed on Route 8 Northbound between May 1 and May 9, 2023.