2022 CTDOT Construction Advisories
Page 26 of 26
- 1/18/2022 Traffic Signal LED Relamping in Various Connecticut Towns
- 1/17/2022 Traffic Signal LED Relamping In Various Connecticut Towns
- 1/13/2022 Surveying Route 7 Expressway Northbound and Southbound in Norwalk
- 1/13/2022 Traffic Signal Safety Enhancements In Various Locations
- 1/11/2022 Traffic Signal Safety and Technology Enhancements District 2
- 1/7/2022 Postponed Closure of Route 2 Sutton Avenue Eastbound and Westbound Indefinitely
- 1/5/2022 Traffic Sign Replacement and Renumbering Route 8 in Waterbury and Watertown
- 1/5/2022 Guard Rail Upgrades on Route 15 in Meriden
- 1/4/2022 Bridge Replacement on Michaels Way in Weston CT
- 1/3/2022 Installation of Overhead Utilities Exit 8 on I84 in Newtown
- 1/3/2022 Bridge Replacement 06887 over Shady Brook in East Haddam
- 1/3/2022 Exit Sign Replacement on CT Route 9 in Multiple Towns from Old Saybrook to Farmington
- 12/30/2021 Guardrails Upgrade Route 83 in Ellington and Somers