The Department of Transportation (Department) is developing plans to replace signs and sign supports along Route 8 and associated on and off ramps in Waterbury and Watertown. Plans are also being prepared to replace signs and complex sign supports along Route 8 in Bridgeport, Shelton, Derby and Naugatuck. Additionally, to be in conformance with Federal standards, mileage-based exit numbering will be included on the entirety of Route 8.
The following locations are included:
ROUTE |
TOWNS |
WORK DESCRIPTION |
Route 8
|
Bridgeport, Shelton, Derby, Naugatuck |
Replacement of large signs and complex sign supports. Inclusion of mileage-based Exit numbers |
Route 8 |
Waterbury, Watertown |
Replacement of large signs and sign supports. Replacement of small signs and posts. Inclusion of mileage-based Exit numbers. |
Route 8
|
Trumbull, Stratford, Ansonia, Seymour, Beacon Falls, Thomaston, Litchfield, Harwinton, Torrington, Winchester |
Inclusion of mileage-based Exit numbers. |
The following are the tentative exit numbers for Route 8:
ROUTE 8 |
||||
Exit to:
|
Existing number: |
Proposed number: |
||
Northbound |
Southbound |
Northbound |
Southbound |
|
I-95 North New Haven |
- |
- |
- |
1A |
I-95 South NY City |
- |
- |
- |
1B |
South End |
- |
1 |
- |
1C |
CT-130 Downtown |
2 |
2 |
1 |
1D |
Main St Washington Ave |
- |
3 |
- |
2A |
Lindley St |
4 |
- |
2A |
- |
US-1 Boston Ave North Ave |
5 |
5 |
2B |
2B |
CT-25 North Trumbull NY City |
- |
- |
3 |
- |
CT-127 E Main St White Plains Rd |
- |
7 |
- |
4 |
CT-108 Stratford |
8 |
8 |
5 |
5 |
CT-15 North Merritt Pkwy New Haven |
9 |
- |
6 |
- |
CT-15 South Merritt Pkwy NY City |
- |
10 |
- |
6 |
Huntington Rd |
11 |
11 |
7 |
7 |
Old Stratford Rd |
12 |
12 |
9 |
9 |
Constitution Blvd Bridgeport Ave |
13 |
13 |
11 |
11 |
CT-110 Howe Ave Shelton |
14 |
14 |
12A |
12A |
CT-34 Derby New Haven |
15 |
15 |
12B |
12B |
Pershing Dr Ansonia |
16 |
- |
13A |
- |
Seymour Ave |
17 |
17 |
13B |
13 |
Division St |
18 |
- |
14 |
- |
CT-334 Wakelee Ave |
19 |
19 |
15 |
15 |
Derby Ave |
21 |
20 |
17 |
17 |
CT-67 Seymour |
22 |
22 |
18 |
18 |
CT-42 Beacon Falls Oxford |
23 |
24 |
21 |
21 |
Cross St |
25 |
25 |
24 |
24 |
CT-63 S Main St |
26 |
26 |
25A |
25A |
Naugatuck |
27 |
27 |
25B |
25B |
CT-68 Union City Prospect |
28 |
28 |
26 |
26 |
S Main St Waterbury |
29 |
29 |
27 |
27 |
South Leonard St Washington Ave |
30 |
30 |
29 |
29 |
I-84 East Hartford |
31 |
31 |
30A |
30A |
Downtown Waterbury |
32 |
32 |
30B |
30B |
I-84 West Danbury |
33 |
33 |
30C |
30C |
W Main St Downtown Waterbury |
- |
34 |
- |
30D |
CT-73 Oakville Watertown |
35 |
- |
31 |
- |
Huntingdon Ave Colonial Ave |
36 |
36 |
32 |
32 |
CT-262 Watertown |
37 |
37 |
34 |
34 |
US-6 West, CT-254, CT-109 Thomaston Watertown |
38 |
38 |
38 |
38 |
US-6 East, CT-222 Thomaston Bristol |
39 |
39 |
39 |
39 |
CT-222 N Main St |
- |
40 |
- |
40 |
Northfield Campville |
41 |
41 |
44 |
44 |
CT-118 Litchfield Harwinton |
42 |
42 |
46 |
46 |
Harwinton Ave |
43 |
43 |
49 |
49 |
CT-4, US-202 Downtown Torrington |
44 |
44 |
50 |
50 |
Kennedy Dr Winsted Rd |
45 |
45 |
51 |
51 |
Pinewoods Rd Burrville |
46 |
46 |
55 |
55 |
The new signs and sign supports will be installed in accordance with the latest Federal and State standards and guidelines. The types of signs that will be replaced along the section of Route 8 in Waterbury and Watertown include, but are not limited to, large overhead and side mounted Guide signs and smaller signs such as Exit Gore signs, Speed Limit signs, Merge signs, and Route Confirmation signs. The types of signs that will be replaced in Bridgeport, Shelton, Derby and Naugatuck are large overhead Guide signs.
The existing signs and supports have exceeded their useful service life and are in need of replacement. The scope of the project involves the replacement of only those signs that have exceeded their useful service life, have less than adequate retroreflectivity, have evidence of damage, or are no longer in compliance with Federal and State standards and guidelines. Excluded from this project are signs that have been recently replaced or are scheduled to be replaced by other various construction projects.
It is the Department’s policy to keep the public informed and involved when such projects are undertaken. It is important that the community share its concerns with us to assist in the project’s development. At this time, it is not anticipated that an informational meeting or formal public hearing will be necessary.
The design plans for the project are expected to be completed in the spring of 2022 with construction commencing in the winter of 2022.
Anyone interested in requesting information on this project may do so by contacting Barry Schilling, Project Manager, Barry.Schilling@ct.gov . Please make reference to Project Number 0015-0381.