2022 CTDOT Construction Advisories
Page 20 of 27
-
5/4/2022
Extended Ramp Closures at I-95 Northbound and Southbound Exits 57 and 58 in Guilford
CTDOT is announcing temporary ramp closures at I-95 NB/SB between Exits 57 and 58 are being extended to May 20, 2022.
-
5/4/2022
Structural Steel Maintenance/Repair on I-95 in Milford
CTDOT is announcing that a structural steel repair project will be performed at night on I-95 Northbound and Southbound in Milford.
-
5/4/2022
Milling and Resurfacing Project on Route 75 in Windsor
CTDOT is announcing that a milling and resurfacing project will be performed on Route 75 in Windsor, from River Street to the Windsor / Windsor Locks Town Line.
-
5/3/2022
Drainage Repairs on Route 319 in Stafford
CTDOT is announcing that drainage repairs will be performed on Route 319 in Stafford.
-
5/3/2022
I-91 Northbound Exit 29 to Open into Final Alignment with Dedicated Left Lanes in Hartford
CTDOT is announcing that I-91 Northbound Exit 29 will open its dedicated lanes for the final alignment beginning on Monday May 2, 2022.
-
5/3/2022
Replacement of Highway Signing on Route 8 from Bridgeport to Shelton
CTDOT is announcing the overnight closure of the Route 15 Exit 52 Southbound Off Ramp to Route 8 on or about Tuesday May 10, 2022 to allow for the installation of highway signing.
-
5/3/2022
Route 15 Safety Improvements, Resurfacing, Enhancements and Bridge Improvements in New Canaan and Norwalk
CTDOT is announcing that Safety Improvements on The Merritt Parkway will begin on or about May 16, 2022.
-
5/3/2022
Milling and Resurfacing Project on Route 17 in Glastonbury & Portland
CTDOT is announcing that a milling and resurfacing project will be performed on Route 17 from Route 17A to Route 160.
-
5/2/2022
Nighttime Ramp Closure of Route 5/15 Northbound Exit 86 to I-91 Southbound in Hartford
CTDOT is announcing that construction work with nighttime ramp closures at Route 5/15 Northbound Exit 86 to I-91 Southbound will occur periodically from now until October 2022.
-
5/2/2022
Nighttime Ramp Closure of Route 5/15 Northbound Exit 86 to I-91 Southbound in Hartford
CTDOT is announcing that construction work with nighttime ramp closures at Route 5/15 Northbound Exit 86 to I-91 Southbound will occur periodically from now until October 2022.