The Connecticut Department of Transportation (CTDOT) is announcing that a milling and resurfacing project will be performed on Route 75 in Windsor from River Street to the Windsor/Windsor Locks Town Line.
The project DOT01710478CN “E” consists of milling and resurfacing a 1.01-mile segment of Route 75 in Windsor from River Street to the Windsor/Windsor Locks Town Line. This project is scheduled to begin milling by Rafferty Fine Grading, Inc. on Thursday, May 19, 2022 to Friday, May 20, 2022. The resurfacing segment of this project is anticipated to begin on Monday, May 23, 2022 to Thursday, May 26, 2022, by Galasso Materials.
This project is included in the Department of Transportation’s 2022 Vendor Resurfacing Program.
LANE CLOSURE/DETOUR INFO
Motorists can expect lane closures on Route 75 in Windsor from River Street to the Windsor / Windsor Locks Town Line. The regular work schedule for this project is Monday through Friday from 7 a.m. to 4 p.m. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.