2021 Construction Advisories
Page 15 of 28
-
6/29/2021
Milling and Resurfacing Project on Route 3 in Middletown and Cromwell
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 3 from Route 66 (Washington Street) to Route 372 (West Street) in Middletown and Cromwell.
-
6/29/2021
Milling and Resurfacing Project on Route 58 in Redding
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 58 in Redding.
-
6/26/2021
Scheduled Closure and Detour of Route 149 in East Haddam for Rock Slope Stabilization Work
The Connecticut Department of Transportation is announcing the scheduled closure and detour of Route 149 in East Haddam to facilitate rock slope stabilization activities, beginning on July 6, 2021.
-
6/23/2021
Bridge Maintenance on I-95 in New London and Waterford
The Connecticut Department of Transportation is announcing that a bridge maintenance operation will be performed on Bridge 00354 which carries Vauxhall Street Extension over I-95 in New London and Waterford. Work is scheduled to occur on Tuesday night, July 6, through Friday morning, August 13, 2021.
-
6/21/2021
Milling and Resurfacing Project on Route 102 in Ridgefield
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 102 in Ridgefield.
-
6/21/2021
Milling and Resurfacing Project on Route 15 Northbound in Hamden and North Haven
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 15 northbound in Hamden and North Haven.
-
6/21/2021
Milling and Resurfacing Project on Route 69 in Prospect
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 69 in Prospect.
-
6/20/2021
Milling and Resurfacing Project on Route 137 in Stamford
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 137 in Stamford.
-
6/17/2021
Surveying Activities Scheduled on Route 15 Wilbur Cross Parkway in New Haven and Woodbridge
The Connecticut Department of Transportation is announcing that a surveying operation will be performed on Route 15 (Wilbur Cross Parkway) northbound and southbound, west of Heroes Tunnel in New Haven & Woodbridge. This operation is scheduled to occur on Saturday, June 26 and Saturday, July 10.
-
6/17/2021
Rehabilitation of Bridge 03023 Carrying Sigourney Street Over Capitol Avenue, Amtrak, CTFastrak, and Aetna Parking Lot To Begin
The Connecticut Department of Transportation is announcing the commencement of work on July 1, 2021, for the rehabilitation of Bridge 03023 which carries Sigourney Street over Capitol Avenue, Amtrak, CTFastrak, a private road and the Aetna parking lot.
-
6/17/2021
Scheduled Closure and Detour of Route 69 in Wolcott
The Connecticut Department of Transportation is announcing the scheduled closure and detour of Route 69 in Wolcott beginning at 8:00 PM on June 25, 2021, with an anticipated reopening of the roadway on August 26, 2021. The closure and detour are necessary to facilitate construction activities associated with the replacement of Bridge 03240 carrying Route 69 over Mad River in Wolcott.
-
6/16/2021
Milling and Resurfacing Project on Route 502 in East Hartford
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 502 from Forbes Street to the Manchester town line in East Hartford.
-
6/15/2021
Scheduled Closure and Detour of Route 156 at the Niantic River Drawbridge in East Lyme and Waterford
The Connecticut Department of Transportation is announcing the scheduled closure and detour Route 156 over the Niantic River beginning at 7 PM on June 22, 2021, to 7 AM on June 23, 2021. A temporary deviation from drawbridge operation regulations will also occur during the scheduled timeframe.
-
6/15/2021
Scheduled Ramp Closures for Milling Operations in Bozrah, Groton, Lebanon, and Norwich
The Connecticut Department of Transportation is announcing scheduled ramp closures in Bozrah, Groton, Lebanon, and Norwich to facilitate pavement milling operations.
-
6/15/2021
Scheduled Traffic Lane Shift on I-84 Eastbound Between Exits 19 and 21 in Waterbury
The Connecticut Department of Transportation is announcing a scheduled traffic lane shift on I-84 eastbound between Exits 19 and 21 in Waterbury to facilitate construction work associated with the Route 8/I-84 Interchange (Mixmaster) rehabilitation project. The lanes will be shifted to the left starting Monday, June 21, 2021.