All Required Forms Regarding Plan Review and Approval
Page 8 of 8
-
FORM SCG-9009 Site Central Location Letter
SCG-9009 Site Central Location Letter
-
FORM SCG-9010 Photovoltaic Vandalism Letter
This letter is required for all Photovoltaic (PV) system installations
-
FORM SCG-9011 Window Film Acknowledgement letter
Effective 7/1/2018, this letter is required for window film installations on new glass and glazing
-
Mold Should Not Be Ignored
-
PCB's in Caulk Policy (Form 1170)
PCB's in Caulk Policy
-
School eSupplier Introduction_v5b
Overview of new grant application process posted 11/26/18
-
Summary Report of the School Facilities Survey 2021
The School Facilities Survey captures information that Local Education Agencies are required to submit to DAS or the at various intervals required in C.G.S.,Section 10-220, with the most recent statutory date being July 1, 2021.
-
The Growing Problem of Mold
-
What You Need To Know About Pesticides Used In Pressure-Treated Wood
What You Need To Know About Pesticides Used In Pressure-Treated Wood