Letters: SCG Series 9000 forms
Page 1 of 1
-
FORM SCG-9002 Natural Light and Wireless Technology Letter
This letter is required for all project types
-
FORM SCG-9003 Plan Review Phasing Letter
This form is required for all project types including single-phase projects (Form revised 7/1/18)
-
FORM SCG-9004 Space Standards Letter
(Form revised 7/1/18)
-
FORM SCG-9005 Granular Accessible Routes Maintenance Letter
Granular Accessible Routes Maintenance Policy Letter
-
FORM SCG-9006 Non-conforming Floors/Ramps Letter
Non-conforming Floors and Ramps Letter
-
FORM SCG-9007 School Safety Infrastructure Criteria Letter
SSIC Letter
-
FORM SCG-9008 PCB in Caulk Letter
This form was revised 1/25/2024
-
FORM SCG-9009 Site Central Location Letter
SCG-9009 Site Central Location Letter
-
FORM SCG-9010 Photovoltaic Vandalism Letter
This letter is required for all Photovoltaic (PV) system installations
-
FORM SCG-9011 Window Film Acknowledgement letter
Effective 7/1/2018, this letter is required for window film installations on new glass and glazing