2023 CTDOT Construction Advisories
Page 16 of 25
-
5/30/2023
Milling and Resurfacing Project, Route 7 in Wilton
CTDOT is announcing that a milling and resurfacing project will take place on Route 7 in Wilton from June 5 to July 16, 2023.
-
5/30/2023
Eastbound Traffic Shift on I-84 on Rochambeau Bridge
CTDOT is announcing there will be a traffic shift on Eastbound I-84 at the Rochambeau Bridge, beginning on Sunday night, June 4, 2023
-
5/25/2023
Milling and Resurfacing on I395 Northbound and Southbound in Griswold and Plainfield
CTDOT is announcing that a milling and resurfacing project will be performed on I-395 northbound and southbound in Griswold and Plainfield.
-
5/25/2023
Milling and Resurfacing I-395 Southbound in Norwich
CTDOT is announcing that a milling and resurfacing project will be performed on I-395 Southbound in Norwich.
-
5/25/2023
Tree Work on I-84 in Newtown
CTDOT is announcing that tree work will be performed on I-84 Eastbound and Westbound in Newtown.
-
5/25/2023
Pavement Marking Project State Routes within Southwestern Connecticut.
The Connecticut Department of Transportation (CTDOT) is announcing that a pavement marking applications on center lines, shoulder lines and handwork will occur on various state routes.
-
5/25/2023
Milling and Resurfacing Route 5 in East Hartford
CTDOT is announcing that a milling and resurfacing project will be performed on Route 5 in East Hartford from Pitkin Street to Ranney Street.
-
5/25/2023
Milling and Resurfacing SR503 in Hartford
CTDOT is announcing that a milling and resurfacing project will be performed on SR503 in Hartford from Sisson Avenue to the end of SR503.
-
5/25/2023
Milling and Resurfacing Route 16 in Colchester
CTDOT is announcing that a milling and resurfacing project will be performed on Route 16 in Colchester.
-
5/22/2023
Replacement of Catch Basin Tops, I-95 Northbound and Southbound Ramps between Interchanges 51 and 54 in New Haven, East Haven, and Branford
CTDOT is announcing that replacement of catch basin tops will require the on-ramps and off-ramps on I-95 between Exit 51 and 54 in New Haven, East Haven, and Branford to be closed intermittently.
-
5/20/2023
Safety Improvement Project on Route 32 in New London
The Connecticut Department of Transportation CTDOT is announcing that a safety improvement project will be performed on Route 32 in New London.
-
5/18/2023
Pavement Joint and Crack Sealing on State Routes within Central Connecticut
CTDOT is announcing that a joint and crack sealing project will be performed on State Routes within Central Connecticut.
-
5/18/2023
Construction and Maintenance Activities Restricted for Upcoming Memorial Day Weekend
Only work of an emergency nature will be considered
-
5/18/2023
Nighttime Closure of I-95 Northbound Exit 74 Entrance Ramp
CTDOT is announcing that, to facilitate construction work associated with the I-95 Interchange 74 Improvements in East Lyme, the on-ramp to I-95 Northbound at Exit 74 will need to close for two nights during nighttime hours on May 21, 2023 and May 22, 2023.
-
5/18/2023
Tree Removal on Interstate 95 Northbound in Fairfield.
CTDOT is announcing that a tree removal operation will require the closure of the right lane on I-95 Northbound in Fairfield.