2023 CTDOT Construction Advisories
Page 16 of 25
-
5/30/2023
Tree Removal Requires Road Closure of Route 22, from Route 80 to Route 1.
CTDOT is announcing that a Tree Removal operation will require the closure of the roadway on Route 22 in the Town of North Branford from Route 80 to Route 1.
-
5/30/2023
Milling and Resurfacing Project, Route 7 in Wilton
CTDOT is announcing that a milling and resurfacing project will take place on Route 7 in Wilton from June 5 to July 16, 2023.
-
5/25/2023
Milling and Resurfacing on I395 Northbound and Southbound in Griswold and Plainfield
CTDOT is announcing that a milling and resurfacing project will be performed on I-395 northbound and southbound in Griswold and Plainfield.
-
5/25/2023
Pavement Marking Project State Routes within Southwestern Connecticut.
The Connecticut Department of Transportation (CTDOT) is announcing that a pavement marking applications on center lines, shoulder lines and handwork will occur on various state routes.
-
5/25/2023
Milling and Resurfacing Route 16 in Colchester
CTDOT is announcing that a milling and resurfacing project will be performed on Route 16 in Colchester.
-
5/25/2023
Milling and Resurfacing Route 5 in East Hartford
CTDOT is announcing that a milling and resurfacing project will be performed on Route 5 in East Hartford from Pitkin Street to Ranney Street.
-
5/25/2023
Milling and Resurfacing SR503 in Hartford
CTDOT is announcing that a milling and resurfacing project will be performed on SR503 in Hartford from Sisson Avenue to the end of SR503.
-
5/25/2023
Milling and Resurfacing I-395 Southbound in Norwich
CTDOT is announcing that a milling and resurfacing project will be performed on I-395 Southbound in Norwich.
-
5/25/2023
Tree Work on I-84 in Newtown
CTDOT is announcing that tree work will be performed on I-84 Eastbound and Westbound in Newtown.
-
5/23/2023
Replacement of Catch Basin Tops, I-95 Northbound and Southbound Ramps between Interchanges 51 and 54 in New Haven, East Haven, and Branford
CTDOT is announcing that replacement of catch basin tops will require the on-ramps and off-ramps on I-95 between Exit 51 and 54 in New Haven, East Haven, and Branford to be closed intermittently.
-
5/20/2023
Safety Improvement Project on Route 32 in New London
The Connecticut Department of Transportation CTDOT is announcing that a safety improvement project will be performed on Route 32 in New London.
-
5/19/2023
Pavement Joint and Crack Sealing on State Routes within Central Connecticut
CTDOT is announcing that a joint and crack sealing project will be performed on State Routes within Central Connecticut.
-
5/18/2023
Reduced Vertical Clearance for Vehicles on the East Haddam Swing Bridge on Route 82 in East Haddam and Haddam
CTDOT is announcing reduced vertical clearance for motor vehicles on Route 82 over the Connecticut River (East Haddam Swing Bridge).
-
5/18/2023
Construction and Maintenance Activities Restricted for Upcoming Memorial Day Weekend
Only work of an emergency nature will be considered
-
5/18/2023
Route 15 Northbound Ramp Closures at Exit 58 between 9 am & 3 pm in Orange
CTDOT is announcing that drainage work on Route 15 Northbound at Exit 58 will begin on May 24, 2023 resulting in ramp closures.