For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 68 of 281
2809 total results
2809 total results
7/3/2024
CTDOT is announcing that structural repairs need to be made on the Bridge that carries U.S. Route 1 over Mystic River in Groton (Bridge #00362- Mystic Drawbridge) starting Wednesday, July 10, 2024.
6/27/2024
CTDOT is announcing that a gas main maintenance operation will require left and right lane closures Route 15 north and southbound between exits 62 and 64 in North Haven starting Monday, July 29, 2024.
6/27/2024
CTDOT is announcing that Route 15 southbound Exit 60 off-ramp in Hamden, I-91 northbound Exit 12 off-ramp in North Haven, and I-84 east and westbound Exit 46 off-ramps in Hartford will be closed to traffic beginning on July 10, 2024, for wrong way detection installations.
6/27/2024
CTDOT is announcing the start of safety improvements on I-95 southbound that will require ramp closures in Groton, Stonington, and North Stonington from June 23 through August 30, 2024.
6/27/2024
CTDOT is announcing that Route 1 (Barnum Avenue Cutoff) over the Metro North Railroad (Bridge No. 00326) will be reduced from 2-lanes in each direction to 1-lane in each direction, from Bridge No. 00326 to Veterans Boulevard beginning on June 28, 2024.
6/27/2024
CTDOT is announcing that a gas main maintenance operation will require left and right lane closures on I-95 north and southbound between Exits 36 and 39B in Milford starting Monday, July 22, 2024.
6/27/2024
CTDOT is announcing that I-384 eastbound Exit 3 off-ramp, I-84 eastbound Exit 63 off-ramp in Manchester and I-84 westbound Exit 58 off-ramp in East Hartford will be closed to traffic starting on Tuesday, July 9, 2024 for wrong way detection installations.
6/27/2024
CTDOT is announcing that milling and resurfacing project will be performed on Route 7 from Route 63 to Route 44 as well as Route 812 in Canaan from US 7 to Route 63 in Canaan and North Canaan starting Monday, July 1, 2024.
6/24/2024
CTDOT is announcing that there will be no maintenance or construction activities on limited-access highways for the upcoming Independence Day holiday, from 6:00 a.m. Wednesday, July 3 to 6:00 a.m. Friday, July 5, 2024.
6/24/2024
CTDOT is announcing routine maintenance on the Mystic Drawbridge starting Wednesday, June 26, 2024.