For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
2809 total results
CTDOT is announcing that a milling and resurfacing project will be performed on Route 9 in Cromwell, Berlin and New Britain starting on Sunday, April 27, 2025.
CTDOT is announcing that a milling and resurfacing project will be performed on East Broadway Street and Seaside Avenue (Service Road 737) in Milford starting on Monday, April 21, 2025.
CTDOT is announcing that a milling and resurfacing project will be performed on Frontage Road and Worthington Ridge (State Road 572) and the Route 9 ramps in Berlin starting on Sunday April 27, 2025.
CTDOT is announcing that pavement preservation will be performed on I-91 north and southbound in East Windsor and Enfield from Exit 45-49 starting on Monday, April 21, 2025.
CTDOT is announcing a wrong way driver detection installation will take place on I-91 northbound at Exit 42 in Windsor Locks starting on Monday, April 14, 2025.
CTDOT is announcing wrong way driver detection maintenance and recertification on I-95 in North Stonington, Stonington and Groton starting the evening, April 16, 2025.
CTDOT is announcing that milling and resurfacing will be performed on Route 6 in Danbury (from the NY State Line to 0.02 miles East of Driftway Road) starting on Tuesday, April 22, 2025.
CTDOT is announcing that guiderail upgrades will be performed on Route 73 (Watertown Avenue) in Waterbury starting on Wednesday, April 23, 2025.
CTDOT is announcing wrong way driver detection maintenance and recertification on I-95 in North Stonington, Stonington and Groton starting the evening, April 16, 2025.