2023 CTDOT Construction Advisories
Page 3 of 25
-
11/7/2023
Incident Management System Installations Along I-95 And Route 7 In Greenwich, Stamford, Darien, Norwalk, Westport And Fairfield
CTDOT is announcing that the start of construction for incident management system installations along I-95 and Route 7 will begin on November 21, 2023.
-
11/7/2023
Route 9 Northbound on-ramp From Route 81 Closure in Haddam
CTDOT is announcing that the on-ramp from Route 81 to Route 9 northbound in Haddam will be closed for bridge inspection on November 8, 2023, starting at 1:00 p.m. and lasting until 4:00 p.m.
-
11/5/2023
Weekend Lane Closures: I-84 in Waterbury
CTDOT is announcing that, to facilitate construction work associated with the Route 8/I-84 Interchange (Mixmaster) rehabilitation project in Waterbury, multiple lanes on I-84 Eastbound will need to be closed during daytime hours November 10-12, 2023.
-
10/31/2023
Design Plans Underway for the Replacement of Highway Signs and Sign Supports along Interstate 291 from Windsor to Manchester
CTDOT is developing plans to replace signs and sign supports along the entire length of I-291 from Windsor to Manchester and on the limited-access section of CT Routes 187 and 189 in Bloomfield.
-
10/26/2023
Closure: I-95 Southbound Ramps at Exit 17 and Saugatuck Avenue (Route 33) in Westport
CTDOT is announcing the scheduled weekend closure and detour of I-95 southbound in Westport from 8:00 p.m. Friday, November 3 through 6:00 a.m. Monday, November 6, 2023.
-
10/26/2023
Structural Repair Work: Bridge No. 01505 in Bloomfield
CTDOT is developing plans to perform repairs to beam ends and other minor structural work on Bridge No. 01505, Route 187 over Farmington River and Tunxis Avenue in Bloomfield.
-
10/26/2023
I-95 Southbound Ramps at Exit 17 and Saugatuck Avenue (Route 33) in Westport
CTDOT is announcing the scheduled weekend closure and detour of I-95 southbound in Westport from 8:00 p.m. Friday, November 3 through 6:00 a.m. Monday, November 6, 2023.
-
10/26/2023
Installation of High Friction Surface Treatment on State Roads in Ellington, Tolland, Somers, Stafford, and Union
CTDOT is announcing that construction work on Routes 30, 83 and 190 in Ellington, Tolland, Somers, Stafford, and Union will begin November 6, 2023.
-
10/25/2023
Surveying: I-95 Northbound and Southbound at the Quarry Road Overpass in Milford
CTDOT is announcing that a surveying operation will be performed on I-95 at the Quarry Road Overpass Saturday, October 28 and Sunday, October 29, 2023.
-
10/25/2023
Safety Improvement Project: Guiderail and Attenuator Installation on Interstate 91 Northbound and Southbound in Wallingford
CTDOT is announcing that a safety improvement project will be performed on Interstate 91 in Wallingford starting on Monday, November 6 through Friday, December 8, 2023.
-
10/25/2023
CTDOT is announcing that a surveying operation will be performed on I-91 northbound/southbound at Exit 11 on November 11, 12, 18 and 19, 2023.
The Connecticut Department of Transportation (CTDOT) is announcing that a surveying operation will be performed on I-91 northbound and southbound at Exit 11 on Wednesday, November, 11; Thursday, November 12; Wednesday, November 18; and Thursday, November 19, 2023. This surveying operation will be performed by state forces. LANE CLOSURE INFO Motorists can expect lane closures on I-91 Northbound and Southbound in North Haven in the area of Exit 11. Traffic control personnel and signing patterns will guide motorists through the work zone. The regular work schedule for this project is from 7:00 a.m. to 2:00 p.m. Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.
-
10/25/2023
Metal Beam Guiderail Upgrade Project in Watertown
CTDOT is announcing that a guiderail upgrade project will be performed on Route 8 Southbound between Exits 38 and 37 in Watertown starting Wednesday, November 1 through Wednesday, November 29, 2023.
-
10/24/2023
Structural Repair Work: Bridge No. 03372B, I-84 Westbound over Hamilton Street in Hartford
CTDOT is developing plans to perform repairs to beam ends and other minor structural work on Bridge No. 03372A, I-84 eastbound over Hamilton Street and Bridge No. 03372B, I-84 westbound over Hamilton Street in Hartford.
-
10/24/2023
Bridge Maintenance: Mechanical Repairs on Route 130 Stratford Avenue in Bridgeport
CTDOT is announcing that a bridge maintenance project will be performed on Route 130 (Stratford Avenue) in Bridgeport on Thursday, October 26, 2023.
-
10/24/2023
Right Lane Closure: Route 15 Northbound and Southbound in North Haven and Wallingford
CTDOT is announcing that a tree removal operation will require the closure of the right lane on Route 15 Northbound and Southbound in North Haven and Wallingford starting Monday, October 30, 2023, through Friday, January 5, 2024.