Staff Contacts
District 1
Joseph D’Agostino III
Drainage Engineer
Office: 860-258-4504
Joseph.D’AgostinoIII@ct.gov
District 2
Felice Orlando
Drainage Engineer
860-823-3243
Felice.Orlando@ct.gov
District 3
Elvin Mercado-Martinez
Drainage Engineer
203-389-3009
Elvin.Mercado-Martinez@ct.gov
District 4
Kyle Case
Drainage Engineer
203-591-3629
Kyle.Case@ct.gov
Environmental Planner
Christopher Samorajczyk
Environmental Planner
860-594-2632
Christopher.Samorajczyk@ct.gov
Andrew Piraneo
Transportation Supervising Planner
860-594-2937
Andrew.Piraneo@ct.gov
Jeremy Willcox
Transportation Planner 2
860-594-2934
Jeremy.Willcox@ct.gov
Raina Volovski
Transportation Planner 2
860-594-2054
Raina.Volovski@ct.gov
Ryan Barretta
CCT/Transportation Planner 1
860-594-2034
Ryan.Barretta@ct.gov
Christine A. Xenelis
Transportation Assistant Director
860-594-2928
Christine.Xenelis@ct.gov
Patrick Hegge
Transportation Planner 1
860-594-2923
Patrick.Hegge@ct.gov
Andrew Piraneo
Transportation Supervising Planner
860-594-2937
Andrew.Piraneo@ct.gov
Anna LaRose
Transportation Planner 2
860-594-2145
Anna.Casale@ct.gov
Nicholas Lockwood
Transportation Planner 2
860-594-2945
Nicholas.Lockwood@ct.gov
Julia Battistoni
CCT/Transportation Planner 1
860-594-2347
Julia.Battistoni@ct.gov
Environmental Resource Compliance
Specifications / Special Provisions / Details
Section 1.10.03
- APA & SSA
- Staging, Laydown Areas & Servicing/Fueling
- Eastern Hog-nosed Snake
- Eastern Timber Rattlesnake
- Eastern Ribbon Snake
- Smooth Green Snake
- American Kestrel
- Bald Eagle
- Great Egret
- Osprey
- Peregrine Falcons
- Bats
- Northern Leopard Frog
- Northern Diamondback Terrapin
- Bog Turtle
- Eastern Box Turtle
- Eastern Spadefoot Toad
- Spotted Turtle
- Wood Turtle
Fisheries
- Excavation and Reuse of Existing Channel Bottom Material
- Supplemental Streambed Channel Material
- Washing-in Supplemental Streambed Material
- J-hook Vane
- J-hook Vane Detail
- Rounded Riprap
- Placement of Channel Boulder
- Channel Boulder Detail
- Rock Weir
- Rock Weir Detail
- Root Wads
- Saw-Tooth Deflector
- Saw-Tooth Deflector Detail
- Cross Vane
- Cross Vane Detail
- Rock Vane
- Rock Vane Detail
- Placement of Toe Boulder
- Toe Boulder Detail
Seeding
- Conservation Seeding for Slopes
- Wetland Grass Establishment
- Shoreline Grass Establishment
- Wildflower Establishment
- Floodplain Establishment
OEP Landscaping Submittal Templates
- OEP Permit Planting Plan Material Cover Sheet
- Plant Material Source of Supply
- Permit Plan Seeding
- Mulch
- Tree Staking
- RFC Plant Material
Noise
Cultural Resources
Qualified Product List
E&S Control Specifications
- Sedimentation Control at Catch Basin Specification
- Turbidity Control Curtains Specification
- Track Out Mat System Specification
- Water Pollution Control Specification
E&S Control Highway (Standard/Guidesheets)
- HW-211_01 Anti-Tracking Pad
- GS-007 SCS Concrete Washout Area
- GS-010 SCS Sedimentation Control Systems
- GS-013 SCS Erosion Control Measure at Catch Basins
- GS-016 SCS Erosion Control Measure at Catch Basins
- GS-019 SCS Fiber Roll Check Dam
- GS-022 SCS Temporary Stone Check Dam
- GS-025 SCS Permanent Stone Check Dam for Water Quality Treatment
- GS-028 SCS Trackout Mat System and Anti-Tracking Pad
- All CTDOT Guidesheets / Standard Drawings
Invasive Species Specifications
Permit Compliance Forms & Start Notices
- DEEP Work Start (Commencement)
- DEEP Compliance Certification
- DEEP SDF Dredging Report
- USACE Work Start (Commencement)
- USACE Compliance Certification
Construction Stormwater Resources
Low Impact Development (LID)
- EPA LID Homepage
- LID Appendix to Connecticut Guidelines for Soil Erosion and Sediment Control
- LID Appendix to the Connecticut Stormwater Quality Manual
- Water Quality Volume/Water Quality Flow Worksheet
Construction Stormwater Permit
Stormwater Pollution Control Template
Design Build - Stormwater Pollution Control Template
- DEEP Stormwater General Permit 12-30-20
- Directive: Online Stormwater Discharge Permit Registration System
- CSEIR Form
- Notice of Termination (NOT)
- Monthly Posting of Registration Status
CTDOT Project Example Registrations
- Facility
- Facilities / Rail Yard
- Highway Interchange
- Geometry Improvements
- Resurfacing, Rehabilitation, Safety and Drainage Improvements
EZ File
- DEEP ezFile portal
- DEEP ezFile Stormwater Registration Guidance
- Roles and Filing Information
- DEEP Stormwater Process Map (ezFile)