For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 58 of 281
2809 total results
2809 total results
9/24/2024
CTDOT is announcing that guiderail upgrades will be performed on I-91 southbound in Rocky Hill starting on Monday, September 30, 2024.
9/24/2024
CTDOT is announcing bridge work will be performed on I-91 northbound and the Exit 48 off-ramp from I-95 northbound to I-91 northbound in in New Haven, North Haven and Wallingford starting on Sunday, September 22, 2024.
9/24/2024
CTDOT is announcing that surveying operations will be performed on I-95 north and southbound in New Haven starting on Saturday, September 28, 2024.
9/20/2024
CTDOT is announcing that, to facilitate construction work associated with the I-95 Interchange 74 Improvements in East Lyme, the on-ramp to I-95 northbound (at Exit 74) will need to close for three (3) weeks beginning October 1, 2024.
9/20/2024
CTDOT is announcing the start of work on Route 68 in the area of Sawmill Brook beginning on September 21, 2024.
9/18/2024
CTDOT is announcing that guide rail upgrades will be performed on Route 43 in Cornwall starting on Tuesday, October,15, 2024.
9/17/2024
The Connecticut Department of Transportation is announcing that a drainage pipe rehabilitation operation will require the closure of right lane on I95 Southbound and the left lane on I95 Northbound in the towns of Milford and Stratford.
9/16/2024
CTDOT is announcing that bridge maintenance on I-95 over the Saugatuck River in Westport starting on Saturday, September 28, 2024.
9/16/2024
CTDOT is announcing a pavement preservation project on Route 15 north and southbound in in Orange, Woodbridge, New Haven, Darien, and Norwalk starting Monday, September 16, 2024.
9/11/2024
CTDOT is announcing that there will be surveying on I-95 north and southbound on Pearl Harbor Memorial Bridge (Q-Bridge) in New Haven starting Saturday, September 14 through Sunday, September 15, 2024.