Shift or Personnel Changes - Energy Control Program (Lockout/Tagout)

Article
Read time: 6 minutes

A. The following steps will be followed to ensure continuity of employee protection during personnel changes. 

1. All personnel involved in the maintenance or servicing activity will be notified that a transfer of personal locks/tags is about to occur.
2. Clear all personnel from hazardous area(s) of equipment.
3. Under the supervision of the shift supervisor or group designee, the off-going employee will remove his/her lock and tag and the on-going employee will                    immediately install his/her lock and tag.

a. If an entire group or more than one employee will be transferring work responsibility, locks/tags will be removed and replaced one at a time in order of installation. All employees must be present during this exchange.

4. When the transfer of lockout/tagout devices is complete, the effectiveness of all energy isolation devices will be verified to the satisfaction of all personnel                involved.
5. Once the effectiveness of energy isolation protection is confirmed, the service/maintenance operation may continue.

Energy Control Program (Lockout/Tagout) Home page