For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
2809 total results
CTDOT is announcing that guiderail and attenuator installation will be performed on Route 8 at Exit 2B, north and southbound in Bridgeport starting on Sunday, February 2, 2025.
CTDOT is announcing the rehabilitation of Bridge 00793A, Route 15 over the Quinnipiac River in Wallingford will begin January 27, 2025.
CTDOT is announcing a wrong way detection installation will take place on I-691 eastbound at Exit 3 in Meriden starting on Monday, February 3, 2025.
CTDOT is announcing a wrong way detection installation will take place on I-691 eastbound at Exit 3 in Meriden starting on Monday, February 3, 2025.
CTDOT is announcing a wrong way detection installation will take place on I-291 eastbound at Exit 4 in South Windsor starting on Monday, February 3, 2025.
CTDOT will conduct emergency bridge joint repair work on I-84 eastbound between Exits 35 and 36 over Route 72 in New Britain. The project scheduled to begin on Friday, January 24, 2025.
CTDOT is announcing the runaway truck ramp will be closed on Route 44 in Avon starting on Monday, January 27, 2025.
CTDOT is announcing the rehabilitation of Bridge No. 02475 that will take place on Route 130 (Stratford Avenue) over Pequonnock River in Bridgeport starting on Tuesday, April 1, 2025.
CTDOT is announcing that a tree removal operation will be performed on I-84 eastbound at Exit 46 and westbound at the Exit 45 in Hartford starting on Monday, February 3, 2025.
CTDOT is announcing that survey operations will be performed on Route 15 and I-95 in Stratford starting on Saturday, January 25, 2025.