For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
2809 total results
CTDOT is announcing survey operations will be performed on I-84 in Southington starting on Tuesday, September 30 and be completed on Friday, October 3, 2025.
CTDOT is announcing milling and resurfacing will be performed on I-84 eastbound in Danbury between Exits 3 and 4 on Sunday, October 5, 2025.
CTDOT is announcing a bridge inspection project on railroad bridge carrying CSX Transportation over the Connecticut River starting October 6 through 13, 2025.
CTDOT is announcing that a tree removal operation will be performed on Route 10 (30 Waterville Road) in Farmington on Tuesday, October 7, 2025.
CTDOT is announcing bridge work will be performed on Route 32 over I-95 northbound in New London starting October 17 at 8:00 p.m., through Sunday, October 19, 2025, at 12:00 p.m. and again starting Friday, October 24 at 8:00 p.m., through Sunday, October 26, 2025 at 12:00 p.m.
CTDOT is announcing rolling roadblocks due to the planned demolition of the former coal plant in Bridgeport will take place on Route 8 southbound at Exit 1C - 1A, I-95 northbound at Exits 27 - 28 and I-95 southbound at Exits 29 - 27 on Sunday, September 28, 2025.
CTDOT is announcing that upgrading of existing guiderail will be performed on Route 109 in Washington starting on October 6, 2025.
CTDOT is announcing that a ramp closure for guiderail repair and tree removal will be performed on I-84 eastbound Exit 20 off-ramp to Route 8 northbound in Waterbury starting on Thursday, October 2, 2025.
CTDOT is announcing an Illumination replacement will be performed on I-95 north and southbound in East Haven, Branford, Guilford and Madison starting on Wednesday, September 24, 2025.