About
The Connecticut Department of Transportation (CTDOT) is implementing a program to strengthen our ongoing efforts to improve the safety of CTDOT work zones. The CTDOT Know the Zone: Automated Work Zone Speed Control Program will be implemented to reduce speeding, crashes, injuries, and fatalities in work zones. This program uses speed safety cameras to capture information about vehicles that speed through select work zones. The registered owners of the vehicles captured speeding by the automated work zone speed control program will be issued warnings or citations by mail.
How It Works
Mobile Speed Control Equipment
Stationary Speed Control Equipment
Step 2: A series of pictures are taken of the vehicle as it approaches and passes the speed safety camera.
Step 3: Data - including the images, time, date, posted speed, vehicle speed, location, lane and direction of travel - is collected.
Step 4: The data is reviewed by systems and sworn police officers to determine if a violation occurred.
Step 5: A warning or infraction is mailed to the registered owner of the vehicle.
Signs will be present at approximately 1,000 and 500 ft. in advance of the highway work zone speed safety camera area.
Diagrams are not to scale. Actual speed control equipment and work zone configuration will vary.
Fast Facts
Fines and Penalties
Interactive Map
Having trouble viewing this in the browser? View the mobile version of the Know the Zone interactive Map.
Using the map
- Click on a project number to zoom the map to a location to view the project extents.
- Use the (+) and (-) buttons to zoom in and out of the map.
- The Info Widget provides useful information about this interactive map. It provides a summary of the map purpose and context, and a brief description of widgets being used.
- The Map Layer Widget provides a list of operational layers and their symbols.Users can toggle layers on and off by checking/unchecking the check box in front of the layer.Some layers may contain sublayers.
- The Legend Widget shows users which layers and their symbology are currently visible. Layers can be toggled on and off as needed, by using the Layer List widget.
**All locations within the map interface below are approximate. CTDOT makes no guarantee, expressed or implied, about the accuracy of any individual automated work zone speed control system location at any specific point in time. At any time of day, on any day, the automated work zone speed control system may be placed at up to 15 active locations across any of the identified project extents.
Project Schedule

Automated work zone speed control system development took place between October 2025 and December 2025.
Between October 2025 and this coming June 2026, there were and will continue to be limited initial deployments and data collection, with system enhancements taking place at the same time from December 2025 through June 2026.
June 1, 2026, will also mark a warning period of limited deployments and enhancements, while full systems operations and maintenance also begin.
Full equipment deployments will then begin on July 6, 2026 and will be supported by the full system operations and maintenance. The end date for the full equipment deployment, operations, and maintenance is to be determined.
In December 2026, year-end performance reporting will begin and will run until February 2027.