Northbound Gold Star Memorial Bridge
Rehabilitation Project

Project 0094-0261 includes the rehabilitation of The Gold Star Memorial Bridge carrying Interstate 95 Northbound over the Thames River, New England Central Railroad, Providence and Worcester Railroad and local roads in New London and Groton.

Project Notifications

 

INTERMITTENT LANE CLOSURES ON I-95 NORTHBOUND / SOUTHBOUND

Please be advised that there will be intermittent left/right lane closures (alternately) on I-95 northbound and southbound in New London within the project limits on Gold Star Memorial Bridge. These closures will be in effect Monday - Friday during the hours of 7:00 a.m. and 3:30 p.m. Motorists are advised to reduce speed and follow posted signage. Work on the southbound bridge has begun and will continue between the nighttime hours of 8:00 p.m. and 6:00 a.m. 

CROSSOVER IN EFFECT BEGINNING MAY 30, 2026

Please be advised that the I-95 northbound crossover will be installed and implemented the evening of Saturday, May 30, 2026. Lane closures will be required on I-95 northbound from 8:00 p.m. Saturday to 8:00 a.m. Sunday. Beginning on May 31, 2026, the project will be in its "permanent" condition for the next four (4) years. Only two (2) lanes of traffic will be allowed on the northbound bridge. All other northbound traffic will be required to use the crossover onto the southbound bridge to travel in the northbound direction. A crossover is a temporary traffic setup that shifts vehicles from their normal side of the roadway to the opposite side so traffic can continue moving safely while construction is going on. 

These dates may be modified or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.

 

Find the latest alerts and project notices here.


The northbound bridge rehabilitation will be completed in two main stages to maintain the flow of traffic.

Planned Improvements

  • Strengthen and repair structural steel members in the girder spans
  • Replace select bearings on the girder spans and select bearing on the truss spans
  • Replace existing bridge deck joints
  • Replace existing parapet and fence with MASH compliant 3-rail steel barrier and stainless-steel mesh fence
  • Replace concrete approach slabs
  • Repair concrete substructures
  • Install new bridge lighting
  • Replace overhead sign structures
  • Full superstructure painting

About the project

The Northbound Gold Star Memorial Bridge is a critical transportation link carrying I-95 traffic over the Thames River between New London and Groton.

Originally opened in 1943, this iconic structure supports more than 60,000 vehicles each day and plays a vital role in regional mobility and commerce. The Northbound Gold Star Memorial Bridge Rehabilitation Project will extend the bridge’s service life through major structural, deck, and safety improvements, ensuring it continues to meet modern standards while maintaining safe and reliable travel for decades to come.

What You Should Know

Traffic patterns will be shifting to a new alignment for the duration of the project. This change is part of the ongoing efforts to safely and efficiently advance the project while maintaining traffic flow. This short video will help you visualize these upcoming changes, including lane shifts, the crossover, and what drives can expect when traveling through the work zone. 
Contact Icon

Contact Us

Send us a message with your questions or comments on the Gold Star Memorial Bridge.
Document Icon

Fact Sheet

Read the latest fact sheet on the project.
Traffic camera icon

Traffic Cameras

CTroads is your source for real-time travel information in Connecticut.