Scheduled Nighttime Closure and Detour of the William Cribari Bridge (Route 136 ) in Westport 

Creation of a Project  Advisory Committee for Cribari Bridge  

Weight Restrictions Imposed for Cribari Bridge (Route 136) in Westport  

Steel Pile Structural Condition Inspection Scheduled for Bridge 01349 (Cribari Bridge) in Westport

 

NON-ROUTINE INSPECTION AND MAINTENANCE ACTIVITIES 

 

JULY 2018 - REPAIR WORK TO STRENGTHEN BADLY DAMAGED TRUSS MEMBERS 

Maintenance work to repair truss performed in Summer of 2018.  Work consists of bolting of metal plates to various vertical and diagonal members of truss system for strengthening purposes.

 

JULY 2018 - INSTALLATION OF GABIONS TO STABILIZE WING WALL EXTENSION ON NW CORNER OF BRIDGE 

A gabion system was installed in front of the bridge's wing wall on the northwest corner of the bridge.  This interim work was conducted to stabilize the wall, which was leaning seaward.

 

2017 - INSPECTION OF PIER 2 STEEL PILES

A short-term inspection of Pier 2 steel piles of the Cribari Bridge was conducted in 2017 as part of Project 158-214 with the intent of determining their condition.