For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
2809 total results
The Connecticut Department of Transportation (CTDOT) is announcing that exit numbering will be revised on Route 2 both east and westbound, and Route 11 both north and southbound from starting on Tuesday, January 7, 2025, weather permitting.
CTDOT is announcing that a highway bridge inspection will be performed on I-84 westbound to Route 8 southbound and ramp from Bank Street to I-84 westbound/Route 8 southbound on the nights of Tuesday, January 21 to Thursday, January 23, 2025, from 8:00 p.m.to 4:00 a.m.
CTDOT is announcing that survey operations will be performed on Route 15/7 in Norwalk starting on Saturday, January 11, 2025.
CTDOT is announcing wrong way detection installations will take place on I-84 east and westbound at Exits 43, 26 and just Exit 31 eastbound in Cheshire, Southington and West Hartford starting January 13 through 17, 2025.
CTDOT is announcing a wrong way detection installation will take place on I-291 eastbound at Exit 4 in South Windsor starting on Monday, January 13, 2025.
CTDOT is announcing a wrong way detection installation will take place on I-691 eastbound at Exit 3 in Meriden starting Monday, January 13, 2025.
CTDOT is announcing the detour of Route 191 in East Windsor will be extended until November 2025.
CTDOT is announcing that a guiderail and attenuator installation will be performed on Route 8 southbound in Bridgeport starting on Sunday, January 5, 2025.
CTDOT is announcing a closure of Route 113 in Stratford starting on Monday, January 6, 2025.