For real-time and up to date road closures, construction, lane closures, visit CTroads.org!

CTDOT Construction Advisories
Page 179 of 281
2809 total results
9/22/2021
The Connecticut Department of Transportation’s (Department) Office of Engineering is developing plans to upgrade the existing traffic signal system along Route 5/15. The purpose of the project is to replace the existing traffic signal system with a closed loop traffic signal system (CTSS) with connected vehicle (CV) technology from North Broad Street to the Brickyard Plaza driveway in Meriden and Berlin. The project will also include adaptive traffic signal control and automated traffic signal performance measures.
9/20/2021
The Connecticut Department of Transportation’s Office of Engineering is developing plans to rehabilitate the concrete pavement and improve the overall safety conditions on Route 2 in Colchester. The purpose of this project is to repair the existing Route 2 pavement and restore it to an acceptable condition that is consistent with FHWA pavement guidelines.
9/19/2021
The Connecticut Department of Transportation is announcing that work to replace an existing attenuator will be performed on I-84 eastbound at Exit 51 in Hartford. Work is anticipated to occur on Wednesday, September 29, 2021, and Thursday, September 30, 2021.
9/19/2021
The Connecticut Department of Transportation is announcing the scheduled closures of the Exit 33 off-ramp on I-95 in Stratford between the hours of 9 AM and 3 PM on Wednesday, September 22, Thursday, September 23, and Friday, September 24, 2021.
9/19/2021
The Connecticut Department of Transportation is announcing that for two consecutive weekends, beginning at 8:00 PM on Friday, September 24, until 6:00 AM Monday, September 27, and from 8:00 PM on Friday, October 1, until 6:00 AM Monday, October 4, 2021, there will be lane closures on Route 8 northbound in Waterbury to facilitate rehabilitation of Bridges over Platts Mill Road and Metro-North Railroad.