For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 145 of 281
2809 total results
2809 total results
8/9/2022
CTDOT is announcing that milling and resurfacing project will be performed on Route 132 in Bethlehem, from Mill Pond Road to Route 63 (Watertown).
8/8/2022
CTDOT is announcing that a milling and resurfacing project will be performed on Route 12 in Putnam and Killingly.
8/8/2022
CTDOT is announcing the start of milling and paving on I-84 Eastbound between Exit 68 to Exit 71 and I-84 Westbound between Exit 71 to Exit 67 begin on Sunday, August 28, 2022.
8/7/2022
CTDOT is announcing emergency tree work will take place on Route 188 in Seymour from Buckingham Road to Punkup Road on August 9, 2022.
8/5/2022
CTDOT is announcing that a safety improvement project will be performed on various limited and non-limited access roadways in Northeastern and Southeastern Connecticut.
8/4/2022
CTDOT is announcing that nighttime work will begin on I-95 in Norwalk and Westport on August 7, 2022.
8/3/2022
CTDOT is announcing the reconstruction of Route 185 (Simsbury Road) in the vicinity of Tumbledown Brook Channel in Bloomfield. A detour will be implemented from August 18, 2022 to September 1, 2022.
8/3/2022
CTDOT is announcing a milling and resurfacing project will be performed on Route 6 in Columbia.
8/3/2022
CTDOT is announcing a milling and resurfacing project will be performed on Route 66 in Columbia and Windham.
8/1/2022
CTDOT is announcing that bridge deck repair work, necessitating the closure of the right lane of Route 5/15 Southbound, will begin on Friday night, August 12, 2022.