TRAVEL ALERTS | December 2023/January 2024

Station:

  • Station renovations for the new pedestrian bridge connection are on-going. This work may require escalator closures near the South State Street entrance between 7 am and 3:30 pm, Mondays through Fridays. Please follow signs to the nearest elevators and stairs.
  • Stairs from Washington Boulevard to the Track 5 Platform have been removed; access to the Track 5 Platform is through the Station via South State Street.  

South State Street:

  • South State Street may be closed to vehicular traffic between Greenwich Avenue & Washington Boulevard between 10 am and 4 pm weekdays for garage construction activities. See the link below for the traffic detour route. South State Street will otherwise be open to vehicular traffic between Greenwich Avenue & Washington Boulevard during peak weekday travel hours and when the contractor is not working. Some short-term lane closures may also be required during this period.
  • The sidewalk on South State Street will be open to pedestrian traffic between Greenwich Avenue & Washington Boulevard. Pedestrian traffic may be stopped occasionally by on-site flaggers to facilitate overhead work.
  • South State Street, East of Washington Boulevard – Some short-term lane closures and limited travel impacts are anticipated during this period.

SOUTH STATE STREET TRAFFIC DETOUR ROUTE

Other Roadways:

  • Washington Boulevard – Some short-term lane closures and travel impacts are anticipated during this period.