GHMP Projects Currently in Design

Project 0011-0165: Replacement of Computerized Traffic Signal System (CTSS) on Routes 187 and 218 - Bloomfield and Windsor

This project proposes to replace all signal equipment at eight (8) intersections and partial replacement at two (2) intersections on Route 218 and 187 in Bloomfield and Windsor.

Project 0042-0332: Pedestrian Improvements at Ramp Termini - East Hartford

This project will improve pedestrian safety at eight highway ramp locations throughout East Hartford.

Many of these locations are missing important features such as sidewalks, crosswalks, curb ramps, pedestrian signals, and signs. The project will add or upgrade these features to make it safer and easier for people to walk across highway ramps and nearby roads.

Improvements may include:

  • New sidewalks
  • New crosswalks
  • Pedestrian signals
  • Flashing crossing beacons
  • Better lighting
  • ADA-accessible curb ramps
  • Updated signage
  • Some locations may also be redesigned to slow turning vehicles and improve visibility for people walking

Overall, the project will create safer, more comfortable, and more accessible pedestrian connections near ramps serving I-84, Route 2, and Route 5/15.

Click here to access this project's webpage  

Project 0063-0741: Improvements at Various Ramp Locations - Hartford

This project will improve pedestrian safety and connections at five locations throughout Hartford, including areas near highways and expressway ramps.

The improvements are part of an ongoing effort to make it safer and easier for people to walk between neighborhoods, destinations, and transit services. The project will strengthen pedestrian connections, improve crossing safety, and create more comfortable and accessible routes for people walking near highways and ramps.

Overall, the project aims to make walking safer, easier, and more convenient in the area.
 
Click here to access this project's webpage  

Project 0063-0743: Pulaski Circle Improvements - Hartford

This project will improve Pulaski Circle in Hartford’s Bushnell South area by replacing the existing rotary with a modern roundabout.

The new roundabout will improve safety, slow traffic speeds, and make it easier for people walking and biking to travel through the area. It will also improve connections to Bushnell Park and the State Capitol.
Click here to access this project's webpage  

Project 0063-0754: Griffin Line Greenway - Hartford and Bloomfield

This project aims to extend the East Coast Greenway by installing a shared-use path from the vicinity of Route 44 in Hartford to Tobey Road in Bloomfield. The trail will run mostly through the existing rail corridor parallel to the Griffin Line and help close the gap in the East Coast Greenway.

Project 0093-0255: Route 9 Interchange Improvements - Newington and New Britain

This project will improve traffic flow and safety at the Route 175 and Route 9 ramp intersections in Newington and New Britain.

The proposed improvements include: 

  • Adding and extending turn lanes
  • Improving ramp alignments
  • Intersection upgrades to help reduce congestion and improve traffic operations

The project will also add new sidewalks along Route 175 and Fenn Road, creating safer and more connected walking routes. These improvements will help people access nearby destinations, including the CTfastrak Cedar Street Station, Central Connecticut State University, and new residential developments in the area.

Overall, the project will improve safety, ease traffic congestion, and make it easier for people to walk between neighborhoods, transit services, and local destinations.

Click here to access this project's webpage  

Project 0159-0201: Complete Streets Improvements to Route 99 - Wethersfield

This project proposes complete streets improvements on Route 99 between Jordan Lane and Victoria Road in Wethersfield.

Improvements would include:

  • Installing a concrete path through Route 15 interchange area
  • Route 99 lane modifications
  • Relocating the existing curb line
  • Drainage improvements
  • Illumination upgrades
  • Enhanced pedestrian safety features

Project 0170-5016: Downtown Hartford Bus Shelters - Hartford

This project will continue with the upgrading of bus shelters across the downtown Hartford. Approximately seventy-three (73) locations will be upgraded with new shelters and concrete pads.

Construction is expected to be completed by the end of 2026.