GHMP Projects Currently in Construction

Project 0011-0160: Computerized Traffic Signal System (CTSS) Replacement Route 218 (Cottage Grove Road) - Bloomfield

This project will upgrade traffic signals at eight (8) intersections along Route 218 in Bloomfield, between Cigna Way/Bay Hill Drive and Granby Street. The work includes:

  • Replacing outdated traffic signal equipment 
  • Installing new fiber-optic communication line
  • Upgrading the existing signal communications system

These improvements will provide more reliable connections between traffic signals, allowing CTDOT to better monitor traffic conditions and implement advanced technologies that can help reduce travel delays.

Construction is scheduled to begin in winter 2025 and be completed by the end of 2026.

Project 0093-0251: Route 175 Sidewalk Installation - Newington

The project includes improving safety and accessibility for pedestrians by building a new sidewalk on the north side of Route 175 (East Street/ Cedar Street) and Route 505 (Fenn Road) in Newington, creating a continuous walking route between homes, businesses, schools, transit stops, and other destinations in the area.

Additional improvements include: 

  • New street lighting
  • Upgraded bus stops
  • Marked crosswalks
  • Pedestrian traffic signals
  • New pavement markings

Construction is scheduled to be completed in late 2026.

Project 0118-0187: Replacement of Traffic Signal System on Route 99 to Route 314 - Rocky Hill and Wethersfield

This project will upgrade traffic signals along Route 99 (Silas Deane Highway) between Jordan Lane in Wethersfield and Parsonage Street in Rocky Hill.

The work includes:

  • Upgrading 17 traffic signals
  • Replacing outdated communication equipment
  • Extending the fiber-optic network between intersections

These improvements will provide more reliable communication between traffic signals and CTDOT, helping staff better monitor traffic conditions and use technologies that can improve traffic flow and reduce delays.

Construction is expected to begin in winter 2025 and be completed by the end of 2026.

Project 0170-3440: Buckland St and Spencer St Park and Ride Lot Improvements - Manchester

This project will improve two Park and Ride lots in Manchester by upgrading parking areas and adding new amenities for transit riders.

At the Buckland Park and Ride lot near I-84 Exit 62, improvements include:

  • New bus shelters, benches, and trash cans
  • Real-time bus information displays
  • Bike racks
  • Electric vehicle charging stations
  • Pavement and drainage upgrades

At the Spencer Park and Ride lot near I-384 Exit 1, the bus stop will be moved from inside the parking lot to Spencer Street, making bus service more efficient. The project will also add:

  • New bus shelter, benches, and trash cans
  • Real-time bus information displays
  • Bike racks
  • Electric vehicle charging stations
  • Pavement and drainage upgrades

Construction is expected to begin in spring 2026 and be completed by the end of 2026.