The Connecticut Department of Transportation (CTDOT) is announcing the rehabilitation of Bridge Nos. 03410 and 03411 carrying Route 40 over Amtrak Railroad. The project is anticipated to be completed on or about October 28, 2026.
The purpose of this project is to extend the service life of Bridge Nos. 03410 and 03411 by addressing areas of advanced deterioration in the deck and superstructure.
The work is being performed by ROTHA Contracting Co., Inc.
LANE CLOSURE/DETOUR INFO
Motorists can expect lane restrictions on Route 40 between I-91 and the Route 15 overpass, the I-91 ramps to and from Route 40, as well as the Route 40 Exit 1 Ramps. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is (daytime) 9:00 a.m. to 2:00 p.m. and (nighttime) 6:00 p.m. to 5:00 a.m., Sunday through Saturday.
Segments of the following routes will be impacted by this project:
- Route 40 in the vicinity of Exit 1
- Interstate 91 off-ramps to Route 40
Motorists should be aware that modifications or extensions to these schedules may become necessary due to weather delays or other unforeseen conditions. Motorists are urged to obey the posted speed limits and to utilize caution through this and all other construction work zones