For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
2809 total results
CTDOT is announcing that lanes across I-95 northbound on the Gold Star Memorial Bridge in New London and Groton will be restriped Tuesday night, March 11, 2025.
CTDOT is announcing that bridge deck rehabilitation will be performed on various bridges on I-384 in Manchester and Bolton starting on April 1, 2025.
CTDOT is announcing that Wrong Way Driver Detection Installations will be performed on I-84 westbound at Exits 22 and 25 in Waterbury starting on Thursday, March 13, 2025.
CTDOT is announcing that roadway reconstruction improvements will be performed on Route 140 in Ellington and Tolland starting on Monday, March 17, 2025.
CTDOT is announcing that a Wrong Way Driver Detection Installation will be performed on I-84 westbound at Exit 38 in Farmington on Thursday, March 13, 2025.
CTDOT is announcing that a Wrong Way Driver Detection Installation will be performed on Route 7 southbound in Danbury where the divided highway begins/ends on Wednesday, March 12, 2025.
CTDOT is announcing that a Wrong Way Driver Detection Installation will be performed on I-84 westbound at Exit 15 in Southbury on Thursday, March 13, 2025.
CTDOT is announcing bridge repair work will be performed on I-84 requiring the temporary closure eastbound Exit 52 in Hartford starting on Friday, March 21, 2025.
CTDOT is announcing that Wrong Way Driver Detection Installations will be performed on I-84 at Exit 2 eastbound and Exit 8 westbound in Danbury and starting on Wednesday, March 12, 2025.
CTDOT is announcing Route 2 eastbound lane modifications in Glastonbury starting on April 1, 2025.