For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 213 of 281
2809 total results
2809 total results
10/27/2020
The Connecticut Department of Transportation is announcing that a pavement preservation project will be performed on Route 25 ramps (from Daniels Farm Rd. & Rte.#15N to Rte.#25S) southbound in Trumbull.
10/27/2020
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on I-91 northbound in New Haven.
10/27/2020
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on I-95 south in Guilford.
10/25/2020
The Connecticut Department of Transportation is announcing that guiderail upgrades will be performed on Route 72 northbound and southbound from .05 miles east of the I-84 Exit 35 access ramp to the merge of Route 9 northbound and southbound in New Britain.
10/25/2020
The Connecticut Department of Transportation (Department) will conduct a virtual public information meeting concerning the proposed replacement of Bridge 05501 carrying Arrowhead Road over the Norwalk River in Wilton, on Thursday, November 12, at 7:00 p.m. The meeting will be live streamed via Microsoft Teams Live Event and YouTube Live. A question and answer session will immediately follow the presentation. The presentation will be recorded. Instructions on how to access the meeting and on how to provide comments or ask questions can be found at the project webpage: https://portal.ct.gov/DOTWilton161-143.
10/22/2020
The Connecticut Department of Transportation’s (Department) Office of Engineering is developing plans to construct an auxiliary lane on I-95 between Exit 6 and Exit 7 in the southbound direction in Stamford. This project also proposes to rehabilitate the existing pavement, rehabilitate bridges and address roadside safety between Bridge 00023 (I-95 over West Avenue) and Bridge 00026 (I-95 over Greenwich Avenue).
10/22/2020
The Connecticut Department of Transportation is announcing upcoming scheduled closures of Route 8 southbound in Waterbury to facilitate ongoing construction activities associated with the Route 8/I-84 Interchange (Mixmaster) rehabilitation project.
10/22/2020
The Connecticut Department of Transportation is announcing that SR 528 (Turnpike Road) will remain detoured from Route 190 (Main Street) to the intersection of Battle Street and Mountain Road until December 20, 2020.
10/22/2020
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 7 northbound in Norwalk.
10/21/2020
The Connecticut Department of Transportation is announcing lane and ramp closures to facilitate work activity for the the project to rehabilitate Bridge 00032 which carries I-95 over Metro North Railroad and local roads in Stamford.