For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 201 of 281
2809 total results
2809 total results
4/12/2021
The Connecticut Department of Transportation is announcing the start of construction activities to rehabilitate three culverts under I-395 between Exits 13 and 18 in Norwich.
4/12/2021
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 30 from the Tolland town line to Route 140 in Ellington.
4/12/2021
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 42 from Mountain Road to Bethany Mountain Road in Cheshire.
4/12/2021
The Connecticut Department of Transportation is announcing that a pavement preservation project will be performed on Route 25 northbound and southbound in Trumbull.
4/12/2021
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 69 from the Mad River Overpass to .02 Miles north of North Street in Wolcott.
4/12/2021
The Connecticut Department of Transportation (Department) will conduct a public information meeting concerning proposed installation of Centerline Rumble Strips on Route 220 (Taylor Road) from 200-feet north of SSR 404 (Shaker Road) to Oak Road, and on SR 510 (Depot Hill Road) from the East Windsor town line to the northerly junction of U.S. Route 5 (King Street), on Tuesday, June 1, 2021. The formal presentation will begin at 6 p.m. Refer to the project webpage for more detail: http://portal.ct.gov/DOTEnfield171-456.
4/12/2021
The Connecticut Department of Transportation is announcing that a pavement marking project will be performed on various state routes.
4/12/2021
The Connecticut Department of Transportation is announcing the scheduled weekend closure the of I-84 westbound Exit 45 off-ramp starting at 10 PM on Friday, April 23, to 5 AM on Monday, April 26, 2021. The closure is necessary to facilitate construction activities associated with the rehabilitation of Bridges 03367 and 03368 which carry I-84 over New Park Ave, Amtrak, CT Fastrak and SR 504, in Hartford.
4/7/2021
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Bridge 00220 carrying Nod Road over I-95 north and southbound in Clinton. Work Activity is scheduled to occur from Monday, April 19, 2021, through Friday, May 28, 2021, between the hours of 8 PM and 5 AM.
4/7/2021
The Connecticut Department of Transportation is announcing that nighttime lane closures on I-395 northbound and southbound in Montville and Norwich will occur between April 11, 2021 and April 23, 2021. The lane closures are necessary to facilitate the replacement of median guiderail, grading of the median area, and to perform drainage adjustments.