For real-time and up to date road closures, construction, lane closures, visit CTroads.org!

CTDOT Construction Advisories
Page 199 of 281
2809 total results
4/21/2021
The Connecticut Department of Transportation (Department) will conduct a virtual public information meeting concerning the proposed replacement of Bridge07031 carrying Depot Road over the Norwalk River in Ridgefield, on Thursday, May 13, 2021. The formal presentation will begin at 7:00 p.m. Refer to the project webpage for more detail: https://portal.ct.gov/DOTRidgefield117-165.
4/20/2021
The Connecticut Department of Transportation is announcing that a City of New Haven project to reconstruct South Frontage Road will require the closure of the Oak Street Connector (Route 34) to I-91 northbound and I-95 north and southbound in New Haven from June 1, 2021, at 6 AM until November 1, 2021, at 6 PM. The project is being performed by the City of New Haven under an encroachment permit with the Connecticut Department of Transportation.
4/19/2021
The Connecticut Department of Transportation is announcing scheduled daytime shoulder closures on the Merritt Parkway on Monday, April 26, 2021, from 9 AM to 3 PM, between Exits 40 and 41 in Norwalk and Westport. The shoulder closures are necessary for preparatory construction activities associated with Project 0102-0368, which involves resurfacing, safety improvements, landscaping enhancements, and bridge improvements to the Merritt Parkway between Exits 40 and 41.
4/19/2021
The Connecticut Department of Transportation is announcing the scheduled closure of Route 137 (Washington Boulevard) between Main Street and Tresser Boulevard in Stamford, beginning on Friday, April 23, 2021, at 8 PM, until Monday, April 26, 2021 at 6 AM. The closure and detour of vehicular and pedestrian traffic is necessary to facilitate the dismantling of a construction crane.
4/18/2021
The Department of Transportation (Department) will conduct a virtual public informational/CEPA scoping meeting* concerning the proposed replacement of Stiles Bridge (Bridge 01524) carrying Route 191 over Scantic River in East Windsor, on Tuesday, May 4, 2021. The formal presentation will begin at 7:00 p.m. Refer to the project webpage for more detail: https://portal.ct.gov/DOTEastWindsor46-127.