For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 183 of 287
2864 total results
2864 total results
9/30/2021
The Connecticut Department of Transportation is announcing that pothole repairs are scheduled to be performed on I-84 westbound and Route 72 westbound in Plainville. Work is scheduled to be performed on Wednesday, October 6, 2021, with a rain date of Thursday, October 7, 2021.
9/30/2021
The Connecticut Department of Transportation is announcing that roadway and shoulder repairs will be performed on Route 15 southbound in New Canaan. The repairs are scheduled to be performed beginning the evening of Monday, October 4, 2021, and continue through the morning of Saturday, October 23, 2021.
9/29/2021
The Connecticut Department of Transportation is announcing that a virtual public information meeting concerning the proposed replacement of Bridge 01120 carrying Route 74 over the Skungamaug River, in Tolland, will occur on Monday, October 18, 2021 at 7:00 p.m. The meeting will be live streamed via Microsoft Teams Live Event and YouTube Live. A Question and Answer (Q&A) session will immediately follow the presentation, which will be recorded. Instructions on how to access the meeting and on how to provide comments or ask questions can be found at the project webpage: https://portal.ct.gov/DOTTolland142-152.
9/29/2021
The Connecticut Department of Transportation is announcing a single lane closure on Interstate 95 over Lake Saltonstall in East Haven beginning on October 8, 2021. The lane closure is necessary to facilitate construction activities associated with the rehabilitating the existing bridge and roadway over Lake Saltonstall.
9/29/2021
The Connecticut Department of Transportation is announcing that guiderail upgrades will be performed on I-84 in Willington and Ashford.
9/29/2021
The Connecticut Department of Transportation is announcing the scheduled closure of Route 8 southbound in Waterbury, October 6 through October 8, 2021, between the hours of 9 PM and 6 AM to facilitate final line striping activities.
9/29/2021
The Connecticut Department of Transportation is announcing the replacement of overhead signs and supports on Route 8 northbound in Bridgeport. Installation activities from October 4, 2021, to October 7, 2021, with temporary full road closures for up to 15 minutes between 12 AM and 6 AM will occur.
9/29/2021
The Department of Transportation (Department) will conduct a virtual public information meeting concerning the proposed replacement of Bridge 06129 carrying Napco Drive over the Pequabuck River in Plymouth, on Tuesday, November 9, 2021. The formal presentation will begin at 7:00 p.m. Refer to the project webpage for more detail: http://portal.ct.gov/DOTPlymouth110-137.
9/27/2021
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 272 from Route 44 to Bruey Road in Norfolk.
9/27/2021
The Connecticut Department of Transportation is announcing that a bridge maintenance activity will be performed on Route 15 north in North Haven and Hamden.